EFTA00374115.pdf
PDF Source (No Download)
Extracted Text (OCR)
From: ==.
>
To: Jeffrey Epstein
Subject: Reminder
Date: Mon, 24 Feb 2014 11:58:36 +0000
Reminder: February 24th, ly Boeing to Brunswick GA for C check inspection and engine overhaul, down time is
8 weeks estimate, 45 days required for engine overhaul inspection on #1 and #3 engines
EFTA00374115
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA00374115.pdf |
| File Size | 17.3 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 301 characters |
| Indexed | 2026-02-11T16:10:48.675825 |