Back to Results

EFTA00441600.pdf

Source: DOJ_DS9  •  Size: 102.6 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Lesley Groff <I To: Larry Visoski Larry le Subject: Re: GIV update Date: Wed, 21 Dec 2016 15:22:50 +0000 ok, thanks On Dec 21, 2016, at 10:12 AM, Lvjet <E > wrote: unsure yet,; still trying to get plane repaired,. there is small chance we can leave tomorrow or Friday, if I defer the repair,. working that now ill keep you posted thx ----Original Message From: Lesley Groff To: Larry Visoski La Cc: Darren Indyke < Rich Kahn Sent: Wed, Dec 21, 2016 10:04 am Subject: Re: GIV update ok, do you know what day he plans to go? I have Karyna and flying to PB on Sat. Dec. 24th to meet him. they arrive at 3:11pm... On Dec 21, 2016, at 9:16 AM, Larry < wrote: GIV has maintenance delay,. Found corrosion in wheel well,. Gulfstream working up repair Maybe finished Tuesday or wed next week Looking for a possible charter to get JE to LSJ over the weekend 1;11 keep you posted TX Sent from my iPad Begin forwarded message: From: "jeffrey E." <jeevacation@gmail.com> Date: December 21, 2016 at 12:25:21 AM EST To: Lvjet < Subject: Re: GIV update wow. On Wed, Dec 21, 2016 at 12:10 AM, Lvjet <IIMIME> wrote: Jeffrey, I spoke to Gulfstream lead mechanic tonight, he informs that Engineering in Savanah will NOT allow extension or return to service due to the location of the corrosion in Wheel well area, Engineering is going to issue a repair scheme for this area and Gulfstream sheet metal shop will fabricate an aluminum angle in house in Palm Beach, rather than wait for Savanah to fabricate with a Jan 4th deliver time. the angle piece is apporx 14" long only. I will have official email from Savanah tomorrow mom (Wed). explaining their position. Here is the tentative plan of attack: EFTA00441600 Wed - Gulfstream PESI will remove the corroded pieces in Wheel Well, clean and measure the damage area, and provide to Savanah engineering. Wed - evening, Engineering will fabricate the repair drawing, and Gulfstream PBI will fabricate the angle. Thursday - obtain repair scheme Hopefully, and start to fabricate the angle, continue to remove the corroded area, grind and treat area. Friday - Saturday start to install, depending when Savanah issues the repair drawing. Sunday and Monday, skeleton crew on hand only, most likely, NOT their sheet metal specialist. ( I will push for work thru the weekend). Tuesday and Wed, finish the repair. My gutt tells me, Dec 27th Wednesday is best case scenario This is only My guess at this time,. I will have more accurate information and timeline tomorrow. I will fwd Gulfstream's official email when I receive tomorrow mom, sorry for this delay,. this was unexpected, it was a simple, Visual inspection of wheel Well area Due card. thank you, Larry please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation(@gmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA00441601

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00441600.pdf
File Size 102.6 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,374 characters
Indexed 2026-02-11T21:58:46.742444
Ask the Files