Back to Results

EFTA00469754.pdf

Source: DOJ_DS9  •  Size: 53.1 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Richard Kahn To: Larry Visoski clia> Cc: Lesley Groff <1 Subject: Re: Update Date: Tue, 27 Feb 2018 18:28:50 +0000 thanks for updates regarding #3 below - i thought eric work on G550 will be delayed until GIV back in service.. Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York. NY 10022 tel fax cell On Feb 27, 2018, at 11:54 AM, Larry Visoski c wrote: Rich and Les, update for your calendar: Spoke with JE„ update below, he wants pilots to stay in Paris during this visit., 1-Dave and I fly Saturday March 3rd PBI-TEB. 2-Dave and Bill fly March 5th or 6th TEB-Paris., remain in Paris until March 12 or 13th and fly back to KTEB or KISP (Islip) maybe., Bill, plan on arriving EWR Monday morn or Sunday, depending on departure. 3-I will go to SAV for G550 completion Monday 5th„ I will test fly G550 March 9th with Chip or Neil. We will accomplish test flights and bring the G550 to Islip for Eric to start Work., 4-March 15th Pete will input the GIV at Meridian TEB for 24month inspection,. Pete / Meridian offered a 10% Discount for the inspection, as well as 5% labor discount„ they had a maintenance cancellation which allowed us to commit to Meridian,. Thx Larry Sent from my iPhone EFTA00469754

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA00469754.pdf
File Size 53.1 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,262 characters
Indexed 2026-02-11T22:07:27.815594
Ask the Files