Back to Results

EFTA00482327.pdf

Source: DOJ_DS9  •  Size: 34.0 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From To: Jeanne Brennan Cc: Jeffrey E Ind ke Subject: AYH Power Outage Wednesday, October 3, 2018 Date: Thu, 27 Sep 2018 16:38:42 +0000 , Daphne Wallace , Jermaine Ruan Carlos Rodriguez Darren Please be advised that the management of AYH is replacing the transformer for the property. The transformer was damaged last year in the hurricanes. While they do this, the power has to be off as well as the generator which means our office will be without power or back up generator. This switch will be done from 7AM to noon next Wednesday. As such, the office will not be opened until 11:30AM on Wednesday, October 3, 2018. Thank you. With warm regards, EFTA00482327

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00482327.pdf
File Size 34.0 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 678 characters
Indexed 2026-02-11T22:11:04.953116
Ask the Files