EFTA00482327.pdf
PDF Source (No Download)
Extracted Text (OCR)
From
To: Jeanne Brennan
Cc: Jeffrey E
Ind ke
Subject: AYH Power Outage Wednesday, October 3, 2018
Date: Thu, 27 Sep 2018 16:38:42 +0000
, Daphne Wallace
, Jermaine Ruan
Carlos Rodriguez
Darren
Please be advised that the management of AYH is replacing the transformer for the property. The
transformer was damaged last year in the hurricanes. While they do this, the power has to be off as
well as the generator which means our office will be without power or back up generator. This switch
will be done from 7AM to noon next Wednesday. As such, the office will not be opened until 11:30AM
on Wednesday, October 3, 2018.
Thank you.
With warm regards,
EFTA00482327
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00482327.pdf |
| File Size | 34.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 678 characters |
| Indexed | 2026-02-11T22:11:04.953116 |