EFTA00482711.pdf
PDF Source (No Download)
Extracted Text (OCR)
Fro
T
, Ann Rodriquez
, Carlos Rodriguez
Wallace
•, Una Pascal
, Cashkim Bussue
Cc: Jeffrey E
Ind ke
stein ieitm icationnot„,gmailicom>. Richard Kahn
LSJ GSJ
Subject: REMINDER: AYH Power Outage Wednesday, October 3, 2018
Date: Wed, 03 Oct 2018 11:34:56 +0000
, Daphne
, Jermaine Ruan
, Brice Gordon
, Bella Klein
Darren
Good morning.
Apparently they will attempt to use the generator while the transformer is being replaced but it will not be able to
run any AC units.
With warm regards,
Sent from my iPhone and misspellings courtesy of iPhone.
On Sep 27, 2018, at 12:38 PM
> wrote:
Please be advised that the management of AYH is replacing the transformer for the property. The
transformer was damaged last year in the hurricanes. While they do this, the power has to be off as
well as the generator which means our office will be without power or back up generator. This switch
will be done from 7AM to noon next Wednesday. As such, the office will not be opened until 11:30AM
on Wednesday, October 3, 2018.
Thank you.
With warm regards,
EFTA00482711
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00482711.pdf |
| File Size | 46.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,087 characters |
| Indexed | 2026-02-11T22:11:12.424761 |