Back to Results

EFTA00482711.pdf

Source: DOJ_DS9  •  Size: 46.2 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

Fro T , Ann Rodriquez , Carlos Rodriguez Wallace •, Una Pascal , Cashkim Bussue Cc: Jeffrey E Ind ke stein ieitm icationnot„,gmailicom>. Richard Kahn LSJ GSJ Subject: REMINDER: AYH Power Outage Wednesday, October 3, 2018 Date: Wed, 03 Oct 2018 11:34:56 +0000 , Daphne , Jermaine Ruan , Brice Gordon , Bella Klein Darren Good morning. Apparently they will attempt to use the generator while the transformer is being replaced but it will not be able to run any AC units. With warm regards, Sent from my iPhone and misspellings courtesy of iPhone. On Sep 27, 2018, at 12:38 PM > wrote: Please be advised that the management of AYH is replacing the transformer for the property. The transformer was damaged last year in the hurricanes. While they do this, the power has to be off as well as the generator which means our office will be without power or back up generator. This switch will be done from 7AM to noon next Wednesday. As such, the office will not be opened until 11:30AM on Wednesday, October 3, 2018. Thank you. With warm regards, EFTA00482711

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00482711.pdf
File Size 46.2 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,087 characters
Indexed 2026-02-11T22:11:12.424761
Ask the Files