Back to Results

EFTA00483524.pdf

Source: DOJ_DS9  •  Size: 28.0 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Karyna Shuliak Ala To: Lesley Groff < Subject: Re: 10F Date: Wed, 17 Oct 2018 17:52:03 +0000 Still waiting for Anthony to start on the bathroom redo, paint, and some other touch ups. They are finishing other tenants apartments. It has now been almost 3 weeks since I met him, which is the estimate time he gave me to wait. Will follow up with him and copy you. Thank you. > On Oct 17, 2018, at 1:24 PM, Lesley Groff wrote: > • how is apt 10F coming along? >> On Sep 27, 2018, at 11:09 AM, Karyna Shuliak a> wrote: > > >> Hi Anthony, > > >> We need to have work done in apartment 10F. The bathroom needs to be redone, bedroom window replaced, bedroom blinds fixed, some paint work in the closets. >> When can we schedule a meeting to look at it together and figure out a plan? >> Please advice. > > » Thank you, >> Karyna EFTA00483524

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA00483524.pdf
File Size 28.0 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 863 characters
Indexed 2026-02-11T22:11:26.211072
Ask the Files