From: Richard Kahn To: •": > Cc: >, Darren Indyke < > Subject: Re: 5 Year Fire suppression system inspection Date: Tue, 04 Dec 2018 16:54:26 +0000 great thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 tel 212-971-1306 fax 212-320-0381 cell 917-414-7584 On Dec 4, 2018, at 11:49 AM, Testing is done. Everything went well and NO violations. Thanks 212-249-1122 917-607-0626 > wrote: On Dec 4, 2018, at 9:28 AM, Richard Kahn < > wrote: thank you for update please confirm all ok once inspector leaves along with any follow ups thanks Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 tel 212-971-1306 fax 212-320-0381 cell 917-414-7584 EFTA00486174 On Dec 4, 2018, at 9:10 AM, Inspector showed up today. Testing is now in progress. He might walk around to look at the mechanical rooms also. Thanks 212-249-1122 917-607-0626 On Dec 3, 2018, at 10:19 AM, > wrote: > wrote: Good morning, Plumbers showed up and everything (preparation wise) then FDNY called their office cancel again. Re scheduled for tomorrow now. Thanks 212-249-1122 917-607-0626 On Nov 30, 2018, at 8:19 AM, > wrote: I had on his itinerary today so i will tell him Sent from my iPhone On Nov 30, 2018, at 7:58 AM, > wrote: Did he know they were coming today? If not, then he does not need to know. 212-249-1122 917-607-0626 On Nov 30, 2018, at 7:56 AM, > wrote: Does Jeffrey need to know this? Sent from my iPhone EFTA00486175 On Nov 30, 2018, at 7:54 AM, > wrote: FDNY canceled the testing today. They re scheduled it for Monday @ 9 am. Thanks 212-249-1122 917-607-0626 On Nov 14, 2018, at 12:31 PM, Richard !Cahn < > wrote: ok thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 tel 212-971-1306 fax 212-320-0381 cell 917-414-7584 On Nov 14, 2018, at 12:30 PM, > wrote: Plumbers are done. Everything is fine. We do need some signage in the sub cellar and they will bring it on the 30th before the inspection. Thanks 212-249-1122 917-607-0626 On Nov 12, 2018, at 4:37 PM, Richard Kahn < > wrote: great please let us know their findings.. thank you Richard Kahn EFTA00486176 HBRK Associates Inc. 575 Lexington Avenue, 4th Floor New York, NY 10022 tel 212-971-1306 fax 212-320-0381 cell 917-414-7584 On Nov 12, 2018, at 4:02 PM, Plumbers will be here on Wednesday 10. Thanks 212-249-1122 917-607-0626 wrote: On Nov 12, 2018, at 1:33 PM, Richard Kahn <I IIME> wrote: thank you when are plumbers scheduled for? please advise thanks Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor New York, NY 10022 tel 212-971-1306 fax 212-320-0381 cell 917-414-7584 On Nov 12, 2018, at 9:12 AM, wrote: Good morning, FYI we are scheduled to have our fire suppression system inspected by the FDNY along EFTA00486177 with our plumbers on November 30 ® 9 am. Rich, I will have the plumbers do a preliminary testing to make sure everything is good. Thanks 212-249-1122 917-607-0626 EFTA00486178

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00486174.pdf
File Size 156.9 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,108 characters
Indexed 2026-02-11T22:12:29.430611
Ask the Files