EFTA00496197.pdf
PDF Source (No Download)
Extracted Text (OCR)
From: Stephanie Remington <
To: Ann Rodriquez <
Cc: Daphne Wallace
, Jeffrey Epstein <jeevacation@gmail.com>,
Lesley Groff
, Rich Kahn <I
Subject: Re: Reminder: Kick Plate for LSJ MC Kitchen today
Date: Wed, 29 May 2019 08:45:41 +0000
Inline-Images: image5.jpeg; imageljpeg; image6.jpeg; imagetjpeg; image2jpeg; imageljpeg
This looks great, Anna! Thank you! Was the leak located and remedied?
On Tue, May 28, 2019 at 3:55 PM Ann Rodriquez <
> wrote:
Sylvester re-built the cabinet and Kick plates today as promised.
The Last 3 Kick plates (Left dishwashers, Middle Sink & Right dishwasher) will be installed tomorrow
morning after the re-installation of the garbage disposal, sink plumbing & dishwashers.
New Cabinet & Kick plate installation to be completed Wednesday 5/29
EFTA00496197
iwjimagel jpeg
EFTA00496198
go,image2jpeg
Rimageljpeg
EFTA00496199
iw jimage4.jpeg
EFTA00496200
iwjimageS jpeg
EFTA00496201
Rimage6.jpeg
Ann R.
340-642-2587
On May 28, 2019, at 12:01 PM, Ann Rodriquez
> wrote:
<image2.jper<imageljpegximage4.jpercimage5.jpercimage6.jpeg><image7.jpeg>cimage8.jpeg>
<image9.jpegximage10.jper<image11 jpeg>
<image12.j peg>
Ann R.
340-642-2587
Begin forwarded message:
EFTA00496202
From: Ann Rodriquez
Date: May 28, 2019 at 11:48.4
\ \1 \S I
To:
Cc: Stephanie
, Daphne Wallace <
>, Rich
Kahn
Subject: Re: Reminder: Kick Plate for LSJ MC Kitchen today
My info comes directly from the Builder/Person working on items. Sylvester cell (340) 474-0109
Sylvester is not comfortable installing a kickplate on top of Rotten or swollen wood. Sylvester said he will
build a new cabinet before installing the kickplate.
Sylvester is working on a building the new Cabinet to complete everything today 5/28.
Friday 5/24 Inspected for installation of kickplate without Knowledge of any major damage.
Saturday 5/25 No work scheduled
Sunday 5/26 No work scheduled
Monday 5/27 Holiday
Tuesday 5/28 rebuild cabinet and install kickplate.
I will send pictures today.
Ann R.
340-642-2587
On May 28, 2019, at 10:56 AM,
> wrote:
Jeffrey says we were told this would only take a couple of hours and wants to know why we keep getting
bad info. I think it best to consult the person who needs to do the job before giving an answer from here
on as to avoid annoying Jeffrey! Thanks!
Sent from my iPhone
On May 28, 2019, at 8:36 AM, Ann Rodriquez <
> wrote:
Sylvester is working on the Kitchen cabinet & kick plate at the moment.
Sylvester said it's not just the kick plate.
He said the whole cabinet have to change completely before the kick plates go on.
EFTA00496203
Arm R.
340-642-2587
On May 28, 2019, at 8:21 AM,
> wrote:
Reminder: Jeffrey wants the kick plate for the LSJ MC Kitchen done ...anna you thought Sylvester
could do today..?
Stephanie Remington
LSJE, LLC
EFTA00496204
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Email Addresses
Phone Numbers
Document Details
| Filename | EFTA00496197.pdf |
| File Size | 159.3 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,851 characters |
| Indexed | 2026-02-11T22:17:36.575124 |