Back to Results

EFTA00496340.pdf

Source: DOJ_DS9  •  Size: 102.7 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: <I To: "Lesley Groff' <1 Subject: RE: Schedule (change of header) Date: Thu, 30 May 2019 01:37:44 +0000 Attachments: LSJ-Engineering-construction_schedule_-May_29_2019_-header.pdf Sorry about that. In the mad rush I forgot to change the header Original Message Subject: Schedule From: < Date: Wed, May 29, 2019 12:31 m To: "Lesley Groff" < Hi Lesley, Please find a tentative schedule for the projects as requested. The impending rains has changed my schedule drastically. I have to run now to take my daughter to the ophthalmologist and running late. if you find any time line error that is the reason why. I need to go through the schedule again but this is a start. Regards John Original Message Subject: Re: Shade Structure En ineerin Doors Bid (LSJ/GSJ) From: Lesley Groff < Date: Tue, May 28, 2019 3:53 am To: John Bedminster < Cc: Mike Glidden < >, Rich Kahn HI John...thank you so much for these quotes..Jeffrey is asking for the timing of the projects please... when could you start and when is projected completion date. thanks! Lesley On May 25, 2019, at 11:00 PM, < Hello Lesley, > < > wrote: Please find attached the proposal for the Shade Structure and the installation of doors at the engineering building. Have a wonderful weekend. Regards John Original Message Subject: Re: Shade Structure En ineerin Doors Bid (LSJ/GSJ) From: Lesley Groff < > Date: Wed, May 22, 2019 6:56 m To: John Bedminster < > Cc: Mike Glidden < >, Daphne Wallace EFTA00496340 > Ann Rodriquez < Kahn < >, Rich Hello John and thank you for your reply! We look forward to receiving your quote by Saturday for the Shade Structure and Engineering Doors... Lesley On May 22, 2019, at 8:41 PM, < HI Ms. Groff, > < > wrote: Sorry about the late response, I was pouring concrete today. I am working on preliminary layout to determine all possible aspect of the shade structure located at the flag pole and pool area. I should be able to deliver the estimate(s) by Saturday the latest. Please let me know if that is okay with you. I will be on St. John in the morning and may not have phone service. If any thing please send a text. Best Wishes John Original Message Subject: Shade /En ineering Doors Bid (LSJ/GSJ) From: Lesley Groff < Date: Tue, May 21, 2019 2:46 pm To: Hello Mr Bedminster. I would like to follow up on the bid you are to propose for the shade structure located at the flag pole pool Mike Glidden has shown you on our island. Can you please get back to me as soon as possible with this bid? Also wondering about the bid for the engineer doors? Please let me know! Thank you, Lesley LSJ/GSJ Sent from my iPhone <LSJ-Engineering bldg.pdf><LSJ-Shade structure.pdf> EFTA00496341

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00496340.pdf
File Size 102.7 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,772 characters
Indexed 2026-02-11T22:17:41.595304
Ask the Files