Back to Results

EFTA00521463.pdf

Source: DOJ_DS9  •  Size: 142.7 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

DULLES GLASS & MIRROR VISION. INNO ATION. SIAM WOO.K. VA Showroom 9126 Euclid Ct. Manassas, VA 20110 Tel: 703-361-9994 MD Showroom 11300 Veirs Mill Rd. Silver Spring, MD 20902 Tel: 301-933-3999 Customer Approved Order Fax: 703 368-2464 Toll Free: 1-866-452-7707 www.dullesglassandmirror.com Printed: 10/22/2012 Customer P.O. # Gordon. Brice.armlic mirror 2 Date Entered: 10/12/2012 Order #: NO052382 Terms: C.O. D. Bill-To: Gordon, Brice-FTC 6100 Red Hook Quarters Suite B-3 St. Thomas-USVI Phone 00802 Fax: Project Name: Gordon, Brice-acrylic mirror 2 Proiect Type: Residential FO/Cust P.O. N0052382 001 Item Ship-To: Address Override: F Gordon, Brice-Little Saint James 6100 Red Hook Quarters Suite B-3 St. Thomas-USVI 00802 Tele: Fax: Carrier: Shipping Product Description Acrylic ° 6mm • VC ° Clear ° Acrylic Mirror ° 48 X 83 please be advised that when installing the mirrors if they butt up next to eachother there could be some distortion. please note that the acrylic minors are not recommended for this type of application All materials were made in the USA No edgework this is a quote for DGM to use our freight company to ship to tropical shipping in miami Tropical Shipping: 9505 NW 108th Ave. Medley. FL 33178 OTY 17 N0052382 002 HW.MIRRORM Item - Hardware ° Mirror Mastic ° 1 X 1 we are using sealbond 30 tubes in one case 30 Signed: Date: Page 1 EFTA00521463 Project Name: Gordon. Brice-acrylic mirror 2 Project Type: Residential FOiCuSt P.O. Coupon. Order Instruction: palate Freight Carrier: Shipping Product Description OTY OTT 1.00 1.00 1. Cc Grand Total: $4.282.58 Deposit: $4,282.58 Balance Due: $0.00 Terms and Conditions: 1. This order o valid for 30 days from the dale 0 1 1 the order. Our prices include measurements. tabncation. delivery and inStal ration 01 matenals specified above unless moennse mated Price does not incl.,* evening w weekend waking hours. Normal marking hours are 7:00 am to 3:30 pm Mcw.-Fri. 3. The proposed price is subject to changed Mere are any Chanciest() the Site a CenhgutatOn atter to final field measuremeN. or Options not listed in the actual proposal. 4. Before DGM will measure. astorner must have prepared a sound. true, level and plumb measurement area. 5. All the Material shall be lurnished in acomdance with the respective indzstry tolerances of color variation thickness, size (4. leisure and performance standards. 6. PAO will not be responsible /Of any discrepancies in Customer provided measurements. 7. II existing cbstructian needed to be removed for installation DGM reserves the right to require customer to modify the working area. II this action is result in an installation line increase arithbr reschedule there may be exile charges. a. Far warranty interstice' en your specific product please vist rrnw.dullesodessandrnirror.ccen es contact your sales representative. IDGM shall not be responsible for damage toils work by other. DGM will not be responsible tOf special incidental Cr consequential damages. 9. In case CCM is provided labor to install 'customer provided' material. DGM is not responsible ter any damage to customer's glass or any other materials involved in. surrounding. or in the area of the work being performed. ID. My items not specifically listed and prized in atom bid proposal are excluded; any changes from this proposal to hardware or material listed may cause a change in pricing and will be butted to a mitten Change Order. 11. Signed Change Orders must be received and approved by Dubs Glass and Mirror and Contractor prier to any additional work being performed and il is understood that the Change Order may ',crease matenat delivery brnes ander prolong work OMB. 12. Leed.Tirnes given are based on intomiaten received by suppliers and manufacturers and are subject to change at any line. therefore Dulles Glass and Mirror shall not be held respansble lot delays caused by suppliers and manufacturers. 13. It Contractor asserts nonpannem due to nonpayment Wan Owner. Dulles Glass and Mirror reserves the fight to contact said Owner regarding me status or payments on the Project 14. One top tor Field Measurement tor WO provided nstalinon projects is Included in to quoted pnce. Field Measurements will be taken atw we we notified that the areas or our scope are ready la measurement Additional ups require] due to openings not being ready andor unacceptable installation 00MISOnS will be result in 6220.00 per op charge. 15. Fdloning is excluded: Final protection and cleaning, Glass or tArror breakage by others, Testing, Engineering. Pewits. Bonds. Demolition. Temporary Enclosures. Repairs or Modification of Existing Opening or Frames. Core Drilling Ice Floor Closures. Any Electrical Work. uNess noted in the scope 01 work. IS. Ceders totaling up to 1500.00 require to be pad in full al the time of order. Invoice will be provided upon request. 17. Removal or 'Mang manors may damage materials antra' surfaces dunng the removal or tie said materials. Dunes Glass and mirror does not assume any responsibility to damages due to or during removal of existing materials. 18. For speoalty items and custom orders 50% deposit is required at the erne of acceptance and the remainng Oaten°e is due before pOt-up.Oelmyry. or nstallabon. t9. AA Freight (Cowmen Carried shipments are Curb Side Delivery. 20.0061 Is not responsible to any existing structural issues That may interfere with the installation ander lead to tnsightly reveals. Any or all structural rnotatioasons that may arise before. OWN or atter Me glass installation are explicitly the customers responsibility. 21. All glass ardor mirror products must be nspected at the time of pick up. Dulles Glass and Mirror is not responsible for glass ;motor morror once it leaves the store premises. 22. Customer agrees that in theevent of any action or proceedings brought lc the recovery of amounts due for products or merchandise or services obtained from Cubes Glass & Mirror to pay alloasts of 0311000n noludIng but not limited to attorneys or collection agent's tees. The customer runner agrees 20 pay a $35.00 reek( each returned Check 23. Items up to x be wrapped in brown paper. Sizes larger than 4.r x Mr will not be packed or wrapped. Padeng is avertable for extra charge and must be requested at the time of order. It is the responsibility of customer to have a suitable vehicle that is prepared to handle the materials to be picked up. ix is thecustomer's respcnstifily to load materials. °GAIN its agents can not teed your vehicle. During loading. Dulles Glass 6 Mirror of its agents we not be held liable for any damages to vehicle. personal items in the Whole. or any boosly inpoes :mat may *pour during loading and transponanon 24. If any dimensions are changed after 13/AG measured that musing fit. finish. or service ability issues there wit be addbonal charges as much as fabrication of all materials. ACCEPTANCE OF ORDER: I. the Lndersigned, accept the above mentioned desorption of work for the above price. I agree to pay a 50% deposit for the materials and labor at the time of acceptance. as well as paying the remaining balance of the agreement at completion. The remaining balance well be paid at the completion of work and will be charged to original payment method in file unless otherwise other payment &cavemen' is made by me at the time of payment of deposit. Signed: Date: Page 2 EFTA00521464

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00521463.pdf
File Size 142.7 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 7,529 characters
Indexed 2026-02-11T22:21:44.561452
Ask the Files