EFTA00521482.pdf
PDF Source (No Download)
Extracted Text (OCR)
Prime Renovations & Painting
12 Cora Court
Hampton Bays New York 11946
U.S.A
(917)287-2878
(631)680-2238
Bill To
Mervin Dela Cruz
9 East 71 St
New York
10021 New York
Estimate
Estimate Date :
# EST-1172
10/10/18
:JUG.
Qt,
Rate
Amount
1
SCOPE OF WORK:
Site protection
protect all work areas using masonite boards
protect any walls as needed with plastic covers
protect bedroom floors and walls during the duration of the work
2
Plumbing
Prier demolition
1. shut down water to the steam shower, toilet room, walk•in shower
& sink
remove all pluming fixture trim
remove toilet, sink vanity
temporary cap all water lines and drains during the duration of work
After all finish work has been completed
2. reinstall all trim fixtures, toiletsink and vanity
1.00
5,000.00
5,000.00
1.00
9,500.00
9,500.00
3
Demolition:
1.00
24,000.00
24,000.00
1. Remove 3 brass doors leading into the steam room, shower & toilet
room
after completion of the work to be reinstalled
Steam Shower
2. completely demo by removing all the stone and cement boards
from the ceiling, walls, floors and benches
Walk•in shower
3. completely demo by removing all stone and cement boards from
ceiling, walls, and floor
Toilet Room
4. completely demo by removing all stone and drywall boards from
ceiling, walls and floor
Sink area
5. completely demo by removing all stone and drywall boards from
ceiling, walls and floor
Cart away all debris
4
Finish Work:
1.00
42,000.00
42,000.00
EFTA00521482
Steam Shower
1. apply 5/8 cement boards to the ceiling, walls and bench
2. apply Laticrete 9235 with membrane waterproofing to the ceiling,
walls, floors and bench
3. apply tiles to tile to the ceiling, walls and bench
4. finish grouting tiles
Walk•in Shower
1. apply 5/8 cement boards to the ceiling, walls
2. apply Laticrete 9235 with membrane waterproofing to the ceiling,
walls and floor
3. apply tiles to tile to the ceiling, walls and floor
4. finish grouting tiles
Toilet Room
1. apply 5/8 drywall boards to the ceiling, walls
2. apply Laticrete 9235 with membrane waterproofing to the walls
and floors
3. apply tiles to the ceiling, walls and floor
4. finish grouting tiles
Sink Area
1. apply 5/8 drywall boards to the ceiling, walls
2. apply Laticrete 9235 with membrane waterproofing to the walls
and floor
3. apply tiles to the walls and floor
4. finish grouting tiles
5
PAINT
1.00
6,500.00
6,500.00
completely paint ceiling and walls that are not getting tiles
6
Cleaning
1.00
2,000.00
2,000.00
thoroughly clean all the work areas and remove all tools and any
other debris left
Sub Total
89,000.00
Total
$89,000.00
Notes
All tiles and any other fixtures are to be provided by client
Terms & Conditions
EFTA00521483
Looking forward to your business
Estimate valid for 30 days
50% deposit required to begin work
Contractor: Prime Renovations & Painting
(signature)
Date:
Client: Mervin Dela Cruz
(signature)
Date:
3
EFTA00521484
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA00521482.pdf |
| File Size | 92.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,018 characters |
| Indexed | 2026-02-11T22:21:44.855545 |