EFTA00521785.pdf
PDF Source (No Download)
Extracted Text (OCR)
DULLES GLASS & MIRROR
VISION. IMMO ATION. MR.
WORK. QUALITY
9151 Euclid Ave.
Manassas, VA 20110 - USA
Tel: 703.361.9994
Fax: 703-368-2464
Toll Free: 1.866-Glass07
www.dullesglassandmIrror.com
Printed: 10/15/2012
Customer Proposal
Customer P.O. #
Gordon. Brice-acrylic mirror 2
Date Entered:
10/12/2012
Order #:
P1O052382
Bill-To:
Gordon, Brice-FTC
6100 Red Hook Quarters Suite B-3
St. Thomas-USVI
Tele: 340-775-8100
00802
Fax:
Project Name:
Project Type:
FO/Cust P.O.
NO052382 • 001
Ship-To:
Address Override: F
Gordon, Brice-Little Saint James
6100 Red Hook Quarters Suite B-3
St. Thomas-USVI
00802
Tele:
Fax:
Carrier: Shipping
Shapes
0
1/4' Acrylic Mirror
Item •
Product Description
Acrylic ° 6mm -
* Clear * Acrylic Mirror °
48
X
83
84
48
OTY
Sgfl
17
470.33 Act
please be advised that when installing the mirrors if they butt up next to eachother
there could be some distortion.
please note that the acrylic mirrors are not recommended for this type of application
All materials were made in the USA
No edgework
this is a quote for DGM to use our freight company to ship to tropical shipping in miami
Tropical Shipping:
9505 NW 108th Ave.
Medley. FL 33178
NO052382 002
30
0.21 Act
HW.MIRRORM
Hardware ° Mirror Mastic °
Shapes
1
X
1
0
2
2
Mirror Mastic
Item •
we are using sealbond
30 tubes in one case
Page 1
EFTA00521785
Project Name:
Carrier: Shipping
Project Type:
FO/Cust P.O.
Product Description
coupon.
Order Instruction: palate
Freight.
Tom: and Conditions:
OW
San
OTY
1.00
1.CO
Grand Total:
$4,282.58
1. This proposal is valid for 30 days Iron Me date 0191e Propose/. 2. Our ;noes include measurements. labncaren. denary and nstallabon of materials specified above unless °therms° elated.
Price does not include evening or weekend waking hours. Normal working hours are 7:00 am to 3:30 pin Mcn.-Fri.
3. The proposed price is *Opel to charged Mere are any chargesto the size or connotation after Me final field measurement. or options not listed in tie actual proposal.
4. Belpre DG AI will measure. customer must have prepared a sound. true, level and plumb measurement area.
5. All Me Material shall be macho in accordance rem me respective industry tolerances of color variation thickness. sae
Mt Gnaw(' and performance standards.
6. DMG will not be responsible kw any discrepancies in customer provided weasurerrents.
7. II existing obstruction needed t0 be removed for installation 0GM reserves the right to require customer to modify the working area. II mis action is result in an installation lime Menne andiOr
reschedule there may be eta charges.
FL For warranty information on your specific product please vise W•ArtdUlleScitanandrnirrOrttal or Genteel VOL° sales represemitove. OGM shall not be responsible for damage to its work by Other.
OW mil not be responsible for special incidental or consequential damages.
9. In case 0GM 6 prowled tabor to install -customer provider material. 0GM is not responsible tor any damage to customer's mass or any miler materials involved in. surrounding, or in the area of
the work being admired.
10. My items not sacilically listed and prized in above bid proposal are excluded: any changes from this proposal to hardware or material listed may cause a change in pricing arid will be
sublet) to a written change Order.
11. Sgned Change Orders mum be received and approved by 0ules Glass and neap and Contractor prior to any additional work being performed and it is understood mat the Change Order may
Increase material delivery limes antlibt Voting work Orne
12. Lead.Tirnes given are based on infemiaten received by suppliers and rnanufactiners and are subject to change at any line. therefore DGIA shall not be held responsible la delays.
13.0 Contractor asserts nonpayment due to nonpayment horn Owner. Dulles Glass and Mirror reserves the (ignite contact said Owner regarding tie status of payments on the Protect.
14.0ne tip for Field Measurement 'IV DAIG provided installation projects is included in the quoted price. Field Measurements will be taken alter we are netilied that the areas of our soaps are ready
ler measurement. Additional mps required due to openings not being ready andiOr unacceptable installallon conditions will be result in 5220.03 per trip charge.
16. Fe/lowing is excluded: Final protection and cleaning. Glass or tArror breakage by others, Tesbng. Engineering. Pernits. Bonds. Oernoliben. Terrperanr Enclosures. Repairs or Mcdilicztion of
Existing Opening or Frames. Core Grilling fix Floor Closures. Any Electrical Wort uNess noted in me scope of work.
16. Orders totaling up to $500.00 require to be paid in ful at the bme of order. Invoice will be provided upon request.
17. Removal of exiang materials may damage matenais anomie *micas during the removal of me said materials. Rides Glass and Mt'ror does not assume
any responsiblity le damages due to or during removal of existing materials.
id. For speeany items and custom ceders 5mdecoy * meowed at the IMO of acceptance and the ternainng b043000 is due before pOvuoi delivery. Or nstallecon.
19. NI Freight (Common Caner' shipments are Curb Side [Joinery.
20. 0061 Is not responsible tor any existing structural issues mat may interfere with me installation anomie lead to unsgmiy reveals. Any or all structural WOCaliCabOne that may anse before. during or erre me glass
instillation are explicitly thecustomers responsiblity.
21. Al glass andrer mirror products Mel be inspected al the time of pck up. Dulles Glass and Mirror is not responsible for glass ander rrirror once il leaves the SOOfeprernises.
22. Customer agrees mat in me event 01 any acson or proceedings brought for the recovery or amounts due /Or products or merchandise or services obtained from Dulles Glass d Mirror to pay all costs of collection
including burl not limited to allornels or collection agent's fees. The customsr further agrees to pay a $35.00 fee Ice each returned check.
23.11 any dimensions are changpeedo alter OW measured That causing M. sneer.. or seivice ability issues there we be ad000rtai charges as much as lawleabon or all matenais
ACCEPTANCE OF ROPOSAL:
I, the unclersaned. accept the above mentioned description of work for the above price. I agree to pay a 50%
deposit for the materials and labor at the time of acceptance. as well as paying the remaining balance of the agreement at completion. The remaining
balance will be paid at the completion of work and will be charged to originial payment method in file unless otherwise other payment arrangement is
made by me at the time of payment of deposit.
Signed:
Date:
Page 2
EFTA00521786
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Phone Numbers
Document Details
| Filename | EFTA00521785.pdf |
| File Size | 129.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 6,726 characters |
| Indexed | 2026-02-11T22:21:49.051861 |