JE Punch List —July 23, 2012 Directives
1. Clean Up - make as many barge runs as necessary
- Top of Desal plant
- Engineering
- Cleaning the shops — JE would like completed by 7/27
2. Equipment and Vehicles
- Sell equipment
- Bikes should be ready to be sold — no sales without JE approval — bike sale list will be forwarded for JE
approval 7/25
- No machinery off the island unless approved
- Buy new Kawasaki bikes and mules — Rich K negotiating with Vendor
- Kawasaki parts order submitted twice — awaiting direction
- Remove all concrete trucks and cement hopper no later than 7/27
- Cement hopper scheduled to be transported to the Heavy Materials - St. John yard for storage 7/26
pending cost quotes to be forwarded 7/24 for approval
- Concrete trucks — Monique/Daphne following up on storage and pricing for JE review and approval
3. Computers
- Buy new computers — 2 Macs Desktops & 1 Laptop — Captains' Office - ordered
4. Five Palms
Internet/Phone Switch installed — fiber to be re-tested 7/24
- Phone set up left of desk — switch installed 7/20 - COMPLETE
- Wireless inside only — as of date 7/10 via JE — installation 7/24 — 7/25
- Computer — as of date 7/10 not required via JE
- Exterior Door Shutters — estimate forwarded to JE 7/12 - $2,865.00 - awaiting direction
- Painting - outside to be completed via JE direction
- Inside to be completed via JE direction — Ion — scaffolding is being erected for him
- Tapestry Molding for Ceiling — Ion
- Furniture — outside furniture ordered — EDA to Tropical 7/24
- Piano Bench — mounted 7/18 - COMPLETE
- Piano — schedule to re-tune week of 8/15
- Picture Frame — measurements forwarded to Sarah - 86 x 70
- Mirrored siding — liquid nails — will cover entire panel with glue when the next one falls off
- Transformer Protection Wall — should be built - work began 7/20
- Floor Gold Lamps - electrical wiring needs to be replaced, completion expected 7/20
- Fire pit — fix — a new propane tank was installed but it is now empty - Danny and Brian suspect there is a leak -
they will investigate 7/24
5. Grotto
- Furniture — put back in grotto
- Curtains — more curtains ordered — cream for the bed at the base of the grotto — expected to arrive to Zorro
to take to LSJ 7/31
- Genset wiring — COMPLETE - Danny reviewing auto start from Kite House
6. Berm/Top of Hill
- Stone threshold needs total re-do — must be level and straight
- Boulders —Jules to finish boulder work
- Electrical — Low voltage transformer in place - placement & connection of lights completed
- Main transformer on site - installation to begin 7/16
- Concrete Band — require confirmed mark out via JE
7. Engineering/Maintenance Yard
- Steel Shed concrete pad — COMPLETE
- Metal Sheets - on old building replaced - work to begin 7/18
EFTA00522045
- Painting — power sanding/rust removal continues — JE would like painting completed by 7/27
- Engineering Storage & Shelving — work started 7/13 — JE would like completed by 7/27
- Landscaping — quote for Sea grapes forwarded to JE 7/12 - awaiting direction
- Landscaper(s) to travel to Josephine's nursery (Coral Bay) — trip is cancelled
- Engineering water boundary — Jules to finish
8. Triangle -
- Landscaping direction required from JE
9. Flagpole Pool Cabana -
- Furniture — investigate new desk, new furniture more like Pool Cabana PBI
- Relocation of orange sofa to Media Room
- Check water pressure in shower
10. Floating Dock
- Jet ski Bumpers —ordered — EDA 7/24
- Table/Dock Box
- Dock box handles need completion
- Dock box top to be resurfaced
- Dock floors — staining needs completion
- Swim Ladder — direction from JE on placement required
- Dive Platform — require construction details
- Wooden Bumpers — to cover concrete stripping — COMPLETE
- Painting — Railing, Cross Brackets & Robe Hooks - COMPLETE
11. Entry Tree Lights
— Lights on site, electrical installation complete
12. Solutions for Generators
— Soundproofing Installation — back wall and door to be completed 7/24
13. Tiki
— Shields have been shipped awaiting arrival at Tropical
14. Kite House
— relocation of outside furniture from 5 Palms once new 5 Palms furniture on site
15. Chillax Room
— requires furniture piece for electrical/media equipment — Sarah
16. Chillax Bathroom
- require blue rugs for bathroom & vanity area — Sarah
17. Mechanical Building
- Replacement Transformer — estimated date to be shipped from factory (Illinois) 8/21
18. Boats
- Lady G — sell — in hurricane storage 7/18
- Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000
- Big N — repair — will go to Subbase Drydock after 8/7
19. Timers
- Review installing timers on air conditioners, irrigation water systems, and lights
- Set all air conditioning to 85 degrees (no need to keep anything cooler)
- No irrigation week of 7/23
20. Beach lighting
— per JE, replace existing transformers for the beach lighting of palms around the salt pond and beach
21. Transient Surge Protection — will review and forward estimate ASAP - Danny
22. Ice Maker — ordered 6/21 — vendor will confirm delivery date 7/24
23. Landscaping
- Soil material on site - soil removed from beds 7/16 — area replanted - COMPLETE
- Peter to finish transplanting engineering palms — JE to advise where they are to be transplanted to
- Finish sundial corner (trees, stones, hydro-seed)
EFTA00522046
- Clean up areas marked in paint
- Prepare banana area for pineapples — awaiting corrected quote for 100 pineapples — Brice to forward
24. Solar lights — ordered - place every 30 feet — EDA at Tropical 7/24, EDA STT 7/28
25. Roads — grade - Jules work continues
26. Library
- Lights on bookshelves need attention — will complete ASAP
- Temperature — STABLE
- Repair hanging wooden louver
27. Main hill
— Asphalt path — pour asphalt ends in concrete — top and bottom have been formed, concrete poured at top
and bottom — stones being placed at bottom — completion 7/25
28. New Employee Bathrooms
29. Gym
- New punching bag — arrived at 7V — will come down on the next plane trip
- Wiring — balance cables on site - final tidy up 7/20 — COMPLETE
- Audio cables purchased — installed 7/20 — COMPLETE
- Yoga room air does not work — Danny to investigate
30. Benches
31. Danny Vicars — schedule boat driving lessons
32. Beach Office
- complete electrical overall required
- waterproofing/sealing/painting/replace rotten wood required
33. LSJ Mooring — Darren will forward to Army Corp for final approval — 7/12
34. AYH Dock — re-sanding/staining of Nanna dock - COMPLETE
35. Main Compound Cistern — Demo work complete - confirmed multi leaks - repair work required
36 Hangar
- Jermaine to redo internet at hangar — he will forward quote for the rack enclosure 7/24
- Fuel Containment Pad — draft approved with drainage incorporated, waiting for updated plan
37. Woodshop Tunnel — floor needs to epoxy
38. Master bedroom area — add many lights in master bedroom planter
EFTA00522047
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA00522045.pdf |
| File Size | 191.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 7,033 characters |
| Indexed | 2026-02-11T22:21:52.057577 |