JE Punch List — November 24, 2012
1. Clean Up - make as many barge runs as necessary
2. Equipment and Vehicles
- Sell equipment
- No machinery off the island unless approved
- Lull — replacement parts on site, repair work to begin 11/28
3. Five Palms
- Picture frame — on site, 86 x 70 — Sarah forwarded 3 proofs for JE to review 11/8, awaiting direction
- Wooden Bases — for sculptures — complete
- Mirrored Siding — remove & wall painted — start 11/26
- Piano/Stool — to be relocated to hanger - 12/2
4. Grotto
- Mattress cover — complete
5. Berm/Top of Hill
— Brice investigating a wood/paper combination material for hydro-seeding. Distributor found, sourcing material
- Pergola construction for high road benches — David — require design details/number from JE
6. Triangle
- Palms - relocated once Lull is repaired
- Gorilla — to be relocated to top of triangle once Lull is repaired
- Installation of lights — final light installation will be completed once Gorilla is relocated
7. Flagpole Pool Cabana
- Furniture — Desk - ETA STT 12/10
- Area Rug — JE requested 11/7 either soft white/black design or plain white extra soft rug — Sarah has ordered
- Pace clock — ordered 2 units due on site 11/8 delay due to Sandy ETA — awaiting update
8. LSJ Dock
- Dock box top & seat — Installed. Require more coats for UV Protection, completed over the week of 11/26
- Dock Carpet & New Trim — Installation early Dec
9. Dock Boxes
- David will fabricate a lighter lid — in production
10. Chillax Room
- Media Center - ordered — shipped to Tropical 11/19
11. Chillax Bathroom
- Lower wall in bathroom to be painted same color as trim - complete
- Install Robe Hook on bathroom door —require location/height. Sarah has ordered correct hook, awaiting arrival
12. Boats
- Lady G — sell — will remain at Nanny Cay until sold. LV investigating selling in NJ
- Midnight Express — sell - LV investigating selling in NJ. Advertising locally
— Purchase New Dingy — sourcing locally
- Purchase New Boat to replace Midnight
13. AC - Set all air conditioning to 80 degrees
14. Transient Surge Protection, Blue Storage Bins & Safety Glasses -
- on site
15. Old Floating Dock -
- Break down and Dispose - 70% complete
16. Landscaping — Peter's List
- Line all Roads with Rocks & Rocks for Waterfall — Top Priority
- Beach 3 — cleaned & graded
- Rubbish Dump - regrade, bern placement along side road
- Transformer area on back high road — plant out
- Cutting Flowers/Vegs — Brice has purchased wide variety of seeds — planted, all have germinated
EFTA00522069
- Pop's Garden — electric fence — installed
- David to make planter boxes — in production, 1 complete.
- Relocate 2 palms from Salt Pond to edge of the road near transformer at 5 Palms
- Black Heli Under Pads — install at top of bike path at MC — Installation to begin 1/10
- Sea Grape/Citrus Fertilizer/Mulch — where to come with Palms from PR?
- 20 x 15ft Coconut Palms from PR — installed
17. Roads
- General re-grading of roads — ongoing — Peter
- JE requested investigating surfaces that can handle the weight of the heavy equipment
18. Library
- AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will
answer concerns & develop control designs, EDA 11/28
19. New Employee Bathrooms
- research "outhouse "option
20. Gym
- New Punching Bag installed — complete 11/13
- Glass front fridge installed & trim - complete
- Ballet Room Windows — opener's repaired — chipped window to be removed 11/26
- Shelf —to support bronze sculpture - complete
21. Beach Office
- complete electrical overall required — Danny to complete 11/28
- painting — 70% complete, once rain stops/dries out remainder will be completed
22. LSJ Mooring
— Mooring approved 11/20 have left a message with diver Ray, expect reply this week
23. Hangar
- Fuel Containment Pad — via Cecile 11/13 Plan ready for submission, waiting for finalization of VIPA Lease & Tom
Melnick
24. Steel shed
— ETA Tropical shipping 12/3, sailing 12/5 ETA STT 12/8 Container will be emptied on LSJ & stored until installation
crew on site, Construction crew ETA 1/11
-JE approved layout for extra metal sections & roller doors to old engineering area. Drawings/photos forwarded to
Buck Steel, will follow up this week
- Installation of new bolts — 80% complete
25. Equipment/Household Purchase and Delivery
- (3) Terex RL-4000 6kW Light Tower systems — on site
- (1) 2012 John Deere 5101E tractor with 553 loader and 8' blade — on site
- (1) 2003 Genie Z60/34 Boom lift — on site
- (1) 2012 JCB 8035Z Mini Excavator with 2 buckets ETA STT 11/26
- Yellow Black Assort Life Jackets — ordered 11/13 ETA 11/30
- Floating Pool Mats — for ocean & pool — ordered 11/7 awaiting shipping details
- 20ft Floating Trampoline — ETA 11/27
- Italian Deck Chairs — awaiting shipping/delivery details
- Extra Restoration Hardware Cushions ordered. Shipped to Tropical 11/20
- LSJ Mats — ETA 11/27
26. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired
27. Stone Walls
— Repair work to replace missing loose stones — Gerry & TJ working as time permits
- Complete Heli Pad Wall — 2 bids from sub contractors, will forward next week
28. Part Time Housekeepers — trail period for possible candidate started 11/21
29. Heli Pad - Wind sock — on site
EFTA00522070
30. Cisterns -
- Need to be cleaned /sealed. Bid approved 11/8 Work to start after 1/10 expected completion by 11/18 then back to
complete the Great Room cistern early Feb
31. Solar —
- Solar lights to be placed everywhere
- Solar Vendors — require update from Jeanne
32. Movie Screen -
- Larry investigating purchase Stewart Screen & new Blue Ray DVD Player
33: Pebble Beach House -
- Fan ordered. ETA NYC 11/26 to be brought down on plane
EFTA00522071
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00522069.pdf |
| File Size | 170.1 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 5,893 characters |
| Indexed | 2026-02-11T22:21:52.347402 |