JE Punch List —January 3, 2013
1. Equipment and Vehicles
- No equipment or vehicles etc off the island unless approved
- Brakes Black Bikes — reviewed & adjusted 1/3
- Excess Oil Disposal — proposal forward to Rich K 12/4, refowarded to Jeanne 12/29 awaiting direction
- Electric Golf Cart Damage —forwarded photos to dealer 1/1 awaiting response
-2. Five Palms
- Picture Frame (86 x 70) & Canvas on site — forwarded to framer 1/3 completion expected 1/22
3. Dock Boxes
- Fabricated a lighter lid, still to heavy— investigating resin/plastic option, up to 4 ft high will forward 1/5
4. Boats
- Lady G — sell — will remain at Nanny Cay until sold.
- Midnight Express — buyer on site 12/21 will make contact by 1/15
- Purchase Yacht Tender— options forwarded to JE awaiting direction
- Purchase New Boat to replace Midnight — require budget
- Repower Little C —Jeanne investigating
5. Landscaping — Peters List
- Line all Roads with Rocks — ongoing
- Loading Dock — requires redesign
- Black Heli Under Pads — installation to begin 1/10 existing pads to be removed
- Sea Grape/Citrus Fertilizer/Mulch/Plant Material — ordered — nursery reopens 1/7 awaiting ETA
- Sunflower seeds — ordered — John Deere reopens 1/7 awaiting ETA
- Removed Palm Tree on MC Hill — replacement?
6. Roads
- General re-grading of roads — ongoing
7. Library
- Chiller — estimate forwarded 12/24 to JE for review. 12 week lead time for equipment. 2 to 3 weeks installation
Jeanne investigating another company, awaiting update
8. Hangar
- Fuel Containment Pad — Plan ready for submission, waiting for finalization of VIPA Lease. Plans sent out for new bid
9 Steel Shed
— On site. Container emptied on LSJ & stored until installation crew on site. Construction crew ETA 1/18
- Lights, Switches, Electrical Equipment order — Danny to finalize 1/5
- Refit Existing Shed — sheeting etc ETA 1/5 roll up door to sail 1/9
10. Equipment/Household Purchase and Delivery
- Italian Deck Chairs — shipped from Italy 12/20 ETA STT 1/23
- Pool Towels — on site —JE not happy with "feel" prefers previous towels. Sarah investigating other options
- Pace Clocks x 2 units — shipped to incorrect address — reordered — again delivered 12/28 to incorrect address.
Daphne trying to track down awaiting ETA
- Ride On Mower — with bag option. JE approved. Rick K to finalize
- Fuel Truck — repair work estimate $15K. Review purchasing new unit.
- Tool Boxes —will forward options ASAP
- Pool Ladders —ETA 1/11
- Outside Lanterns — unable to get replacements, investigating other options
- Media Center — Relax Room — Copenhagen unit selected,
will forward options
- Desk - Flagpole Pool Cabana — still in Paris awaiting ETA
- Rug — Flagpole Pool Cabana — ordered ETA mid Feb
- Portable Electric Oven — shipped to FL 12/26 ETA FL 1/8
11. Containers — RO & Generators in remaining container — possible offer due 1/5
EFTA00522423
12. Stone Walls
— Repair work to replace missing loose stones & complete Heli Pad wall — after Employee Bathroom Project
13. Cisterns -
- Bid approved 11/8 Material on site. Start to empty cisterns 1/3. Work to start 1/11 Expected completion by 2/13
- All furniture in rooms 1 & 2 needs to be removed or covered before work begins
- After repair complete - Laundry, Hobbits, Bathroom, Pump Rm, Tech Rm all require repair/plaster/paint
14. Solar —
- Solar Vendors — Toshiba reps on site 1/7. Toshiba have postponed on site visit. Awaiting final proposal
15. Media -
- Larry investigating purchase Stewart Screen, Blue Ray DVD Player (Screen Rm), Sub, Mini System (kitchen)
16. Cell Repeater & Broadband —
-Jeanne investigating options
17. Pools-
- Installation of x 2 variable speed pumps per pool
- Flag Pole Pool — steps to be installed — require JE direction
- MC Pool — steps to be installed to pool pump room
18. Roads-
- Other solutions to be investigated
19. Moorings-
- Request inspection from USCG — Darren
20. Storage Areas -
- All areas to be organized & inventoried
21. AC —
- Proposing that the 20° unit from Kitchen is replaced & relocated to a Hobbits
22. Fire System -
- Pipe that feeds the 300,000 gal system needs to be replaced. Draining of tank started 1:3 Will forward complete
costing once pipe is inspected & scope of work determined
EFTA00522424
David -
- Employee Bathrooms — material on site, demo started 12'28 rough in plumbing complete, concrete work to begin 1:4
- Pergola Construction — High Road Benches — require design details/numbers from JE
- Planter Boxes — completion 1/10
- Bronze Sculpture — to be raised
- Barge — Chocks
- Pops Garden — Demo existing, construct new shade/planter area
- Tiki House — Propane Stand
- Beach Equipment/Toy Rack
- Captains Office — AC Frame
- Lattice Panels Installed — tunnel
- Nap House/Staff Cottage — Replacement of all Screens
- Redesign & install all new beach signs
- Cleaning, Organizing & Inventory of Wood Shop
Danny & Jermaine -
- Beach Office — no Internet/phone since - 12' 14
- repair outside light
- Relax Bathroom - rewiring
- Pool Cabana - change lights parking area
- Screen Room - repair lamp
- 5 Palms — repair x 2 floor lamps
- review exposed wires around coconut palms
- Berm — cover electrical box
- Info Center — review outside electrical box area
- Kite House & Pebble Beach - review solar, relocate solar panel to roof of Pebble Beach House
- Tiki House — instant hot water system to be installed 119
- reinstall light cover in kitchen
- Captains Office — installation new AC (on site)
- Under Master Bedroom — repair AC unit
- Phones Down — master bathroom, room 4, 5 Palms,
- Lightbulb Replacement — Sarah's Office, Library Blackboard & Ceiling, Master Closet Area,
- Beach Lighting — section out
- Water Proof Covers — for all outside electrical areas — hanger, flag pole pool
Carlos -
- Hangers for Life Jackets — purchase 8
- Cleaning, Organizing & Inventory of Marine Shop, Dock Boxes
Maintenance -
- Barge — Paint Window Frames
- Bronze Sculpture — base painted same as wall color
- Gym/Bathroom/Roof — repainted
- Hanger Area — door resurface & stain
- paint concrete block supporting wind sock
- Tiki Kitchen Roof - replacement
- Flag Pole Pool - resurface & finish outside table & benches
- fridge need to be bolted down
- MC — replaster/paint rising lawn edging
- restain upper ceiling St John & Courtyard
Office — repaint air vent
- Wooden Planters (new & old) - seal
- Captains Office — plaster/paint interior
- Thatch — all locations require new sections
- Fans - Rust
- Info Center — review drainage in parking area
EFTA00522425
New Employees —
Full Time Housekeeper
IT Support
Landscape Supervisor — 2 to 3 times a week
Big N — Barge Captain & Maintenance contract option
Marine — Maintenance contract option
EFTA00522426
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00522423.pdf |
| File Size | 197.1 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 6,836 characters |
| Indexed | 2026-02-11T22:21:59.365144 |