Back to Results

EFTA00544524.pdf

Source: DOJ_DS9  •  Size: 76.1 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: To: A Barrett <ME > Subject: Re: Date: Fri, 01 Jun 2012 18:03:34 +0000 May I give someones number to the people delivering 8H bathroom items so the delivery people can call ahead of time when they are on their way? I won't be in town. Should I give them Andrews number? On Jun 1, 2012, at 12:58 PM, A Barrett c wrote: > I will arrange to bring all supplies to the apartment. Penn should be alot less than that. > Anthony Barrett > On Jun 1, 2012, at 12:22 PM, < a> wrote: >> yes, he said he will have a quote to me by end of day today. I've gotten 2 other quotes from contractors that each came back with $22,000. I'm hoping if Penn's is less than this, JE will be OK with us going with him. I think it's alot easier for all involved to use Penn, and we just have to convince JE that as long as we have all materials, etc, he can finish in 2 weeks. (that's the time frame Penn gave me). Also the tiles I'm ordering for 8H are quite large, 12"x35" so he said that will be alot faster to install. >> I'm having all the materials delivered on Tuesday to the building, they said curbside delivery. It will be the wall and floor tiles, grout, toilet, vanity, sink fixture and shower fixtures. (still looking for actual sink top, med cabinet and towel bar). How should they proceed with delivering the items if they only deliver curbside? Is there someone who can help bring all the items up to the apt? We will have our painter in the building as well who can help. >> On Jun 1, 2012, at 11:51 AM, Anthony Barrett wrote: >» Did you meet? >» >» >>> On Jun 1, 2012, at 9:24 AM, wrote: >» >>>> He just responded. I'm meeting him at 8H at 10am today >>» >>>> On Jun 1, 2012, at 9:23 AM, A Barrett wrote: >>» >»» I will speak with him today. >>>» >»» Anthony Barrett >>>» >>>» >>>>> On Jun I, 2012, at 8:43 AM, ale wrote: >>>» >>»» Hi Anthony, >>>>>> Do you know how much Penn charges to do a total renovation of the bathrooms here? I'm getting quotes from contractors to do 8H bathroom and asked him for a quote, but haven't heard back yet. I want to be able to present JE with as many as possible and see if they are all along the same price line. >>»» Thanks.. EFTA00544524 >>>>» >>» >» >» Anthony Barrett >>> Ossa Pro erties Inc. >» >» NY NY 10065 »>- »> >» >» >» >» » EFTA00544525

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00544524.pdf
File Size 76.1 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,343 characters
Indexed 2026-02-11T22:31:09.636121
Ask the Files