Back to Results

EFTA00546075.pdf

Source: DOJ_DS9  •  email/external  •  Size: 32.6 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

From: To: Anthony barett <=I > Subject: Re: Date: Mon, 11 Jun 2012 10:04:40 +0000 Importance: Normal Karyna told us to install the tiles horizontal. I will take pictures today. Demolition is done. Dropped ceiling is done and ready for electrical. All plumbing roughing for shower body and check valves are done. We will start the shower floor today and will install tiles tomorrow. Ori final Messa From: To: Penn a uyut To: Anthony barett Subject: Sent: Jun 11, 2012 1:58 AM Good morning. Just checking in on 8H bathroom. Would someone be able to send me a few snapshots? Also, how is the tile being installed? What direction, pattern? No one ever asked me which way it should go..did Karyna tell you what she wanted? Sent from my Verizon Wireless BlackBerry EFTA00546075

Document Preview

Extracted Information

Dates

Document Details

Filename EFTA00546075.pdf
File Size 32.6 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 793 characters
Indexed 2026-02-11T22:31:38.951193

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files