EFTA00546075.pdf
Extracted Text (OCR)
From:
To:
Anthony barett <=I
>
Subject: Re:
Date: Mon, 11 Jun 2012 10:04:40 +0000
Importance: Normal
Karyna told us to install the tiles horizontal. I will take pictures today. Demolition is done. Dropped ceiling is
done and ready for electrical. All plumbing roughing for shower body and check valves are done. We will start
the shower floor today and will install tiles tomorrow.
Ori final Messa
From:
To: Penn a uyut
To: Anthony barett
Subject:
Sent: Jun 11, 2012 1:58 AM
Good morning. Just checking in on 8H bathroom. Would someone be able to send me a few snapshots? Also,
how is the tile being installed? What direction, pattern? No one ever asked me which way it should go..did
Karyna tell you what she wanted?
Sent from my Verizon Wireless BlackBerry
EFTA00546075
Document Preview
Extracted Information
Dates
Document Details
| Filename | EFTA00546075.pdf |
| File Size | 32.6 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 793 characters |
| Indexed | 2026-02-11T22:31:38.951193 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.