Back to Results

EFTA00546183.pdf

Source: DOJ_DS9  •  Size: 30.4 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: To , Anthony barett an Subject: Re: Date: Tue, 19 Jun 2012 17:06:32 +0000 Importance: Normal We have only the floor to finish today till tomorrow and grout. Thursday we will install the vanity and plumbing fixtures and accessories. Friday is clean up and done. I spoke to Karyna regarding the mdicine cabinet and I told her when she has it we will install. The glass shower door will be measured tomorrow and will be installed monday. Ori inal Messa e From: To: Penn baluyut Cc: Anthony barett Subject: Sent: Jun 19, 2012 12:55 PM Hey Penn. just wondering what our new time frame is for completion of 8H bathroom? I noticed today there is still alot of work to do. Sent from my Verizon Wireless BlackBerry EFTA00546183

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA00546183.pdf
File Size 30.4 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 745 characters
Indexed 2026-02-11T22:31:42.767193
Ask the Files