Back to Results

EFTA00547566.pdf

Source: DOJ_DS9  •  Size: 164.9 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Marie-Joseph Experton fr" To: 'Bella Klein' < Cc: 'Rich Kahn' <I k 'Sarah K' Subject: RE: EPSTEIN / DEVIS windows Date: Thu, 21 Jun 2012 15:17:44 +0000 Attachments: DevisFenetresWINDOFFjuinl2annote.pdf; DevisFenetresAZURREjuin12.pdf "WINDOFF will change additional 979.05 Euros for frame work. ": This is correct only if we take the option for the 3 windows in the bedroom for special reinforced glass. "plus painting of the windows": In both quotes painting of the windows has to be added. Also to be added in both quotes, interior building work and painting work of the room (around the window frame). Best regards. Marie-Joseph Experton Avocet au Barmau de Paris etabli ai Bruxelles From: Bella Klein [mailto. Sent: 'eudi 21 Juin 2012 16:23 To: Cc: 'Rich Kahn'; 'Sarah K' Subject: Re: EPSTEIN / DEVIS windows Importance: High WINDOFF will charge additional 979.05 Euros for frame work. If we make a deposit payment today the cost for WINDOFF with the frame work is 15041.05 Euros v.AZURRE 15,740Euros plus painting of the windows. Please confirm. Thank you Bella On Jun 21, 2012, at 10:13 AM, Marie-Joseph Experton wrote: "If 1 understand correct AZURRE total cost with painting of the windows is 15,740 Euros less 15% if paid by June 22nd.": NO, there is no rebate on AZURRE quote and the painting is not included. As explained in previous mails, none of the quotes cover painting work nor interior building work. A rebate is only proposed by WINDOFF if order made before June 22nd with first payment of 5,624.92 E. Best regards. Marie-Joseph Experton Avoca! au Barreau de Paris ambit la Bnixelles EFTA00547566 From: Bella Klein Naito: Sent: jeudi 21 juin 2012 15:44 To: Cc: 'Rich Kahn'; 'Sarah K' Subject: Re: EPSTEIN / DEVIS windows Importance: High If I understand correct AZURRE total cost with painting of the windows is 15,740 Euros less 15% if paid by June 22nd. WINDOFF is additional 979.05 Euros for replacing frame and the quality of the glass is not same. It is not reinforced glass. Please confirm. Thank you Bella On Jun 21, 2012, at 8:47 AM, Marie-Joseph Experton wrote: In complement to my mail dated June 15th: the AZURRE quote relates to a renovation: it includes 3 windows in one bedroom and one in a small cabinet room (WC). for a total amount VAT included of 15,740.89 E. NB: compare to the other quote below, it will probably need less interior building work, but painting work is likely to be the same for matching colours throughout the room concerned. the WINDOFF quote concerns the installation of new windows frame: it includes 3 windows in one bedroom/bathroom and one in a small cabinet room (WC). the total amount does not include the option for special reinforced glass (for sound and heat) which amounts to 915,00 + VAT = 979.05E to be added. Best regards. Marie-Joseph Experton Avocet au Barreau de Paris etabli a Bruxelles On Jun 15, 2012, at 10:38 AM, Marie-Joseph Experton wrote: Yes, the quote indicates: REMISE QUANTITATIVE ACCORDEE -15% DEJA INCLUSE DANS LE MONTANT TOTAL CI DESSUS PROMOTION VALABLE POUR COMMANDE PASSER AVANT LE 22 JUIN 2012 SOIT 15% SUPPLEMENTAIRE DEJA INCLUS DANS LE MONTANT TOTAL 77'C PRIX ARRETE A : 14 062 31 e TT C POSE which means that if order is made before June 22nd (I assume with first payment made) the rebate of 15% will be maintained until then, otherwise the quote will be readjusted. The work will be done within 12 weeks (approximately) after order made. EFTA00547567 Best regards. Marie-Joseph Experton Avocat au Barreau de Paris etabli a Bruxelles Avenue Louise 65 (twice I I) 1050 Bruxelles Tel. +32 2 538 58 80 Fax +32 2 538 58 88 GSM +32 474 95 00 73 ou +33 6 07 26 97 85 From: Sarah K [maitto Sent: vendredl 15 juin 2012 15:59 To: Bella Klein Cc: Rich Kahn; Subject: Fwd: DEVIS N° Pm guessing Valdson is saying if we order the windows before Jun 20th, we get a 15% discount, but not if we order after June 20th? Is this correct Mdm. Experton? Have the quotes been sent to JE yet for approval? <DevisFenetresAZURREjuin12.pdf><DevisFenktresWINDOFFjuinl2annotA©.doc> <DevisFenetresAZURREjuin12.pdf><DevisFenelresWINDOFFjuinl2annote.pdf> EFTA00547568

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00547566.pdf
File Size 164.9 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 4,230 characters
Indexed 2026-02-11T22:32:05.303694
Ask the Files