EFTA00548270.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
To: Rich Kahn
Subject: Fwd: bills for 10F and 10B
Date: Tue, 26 Jun 2012 18:03:28 +0000
Attachments: SARA _ 10B_ COUNTRY WHITE.doc;
SARA I0F COUNTRY WHITE REFINISHING.doc
Begin forwarded message:
From: Colette McGoldrick <
Date: June 22, 2012 12:15:08 PM PDT
To: '_
Subject: bills for 10F and 10B
Hey
So we will be finished apts 10F and 10B today so I have attached the
invoices for you. If you could arrange payment on these I would really
appreciate it.
Thanks
Colette
Origh
lessage
From: =.
[mailto
Sent: Wednesday, June 20, 2012 2:38 PM
To: Colette McGoldrick
Subject: Re: I0F
yes, please stain country white.
Can you also have the bedroom carpet pulled up and the bedroom stained
country white as well..
said she just spoke to Jesus about this as well. thanks
On Jun 19, 2012, at 3:25 PM, Colette McGoldrick wrote:
Hi=,
EFTA00548270
Are we staining the floors in I0F country white also? Also the
building is paying for the installation of the floor and I guess you
are paying for the staining country white, so I have attached the bill
for this without the bedroom. Also I have attached th bill for apt # 10B.
Thanks
Colette
Original Message
From:
[mailto
Sent: Friday, June 15, 2012 8:42 AM
To: Colette McGoldrick
Subject: Re: 10B
Andrew agrees that it's OK to go ahead and at least start pulling up
the floor today so it can dry out. We will try and sort out the rest
between us and let you know how to proceed
On Jun 15, 2012, at 2:29 PM, Colette McGoldrick
wrote:
Hi
EFTA00548271
I have attached a new proposal without the bedroom. The rest of the
flooring has to come up as it is really damaged and is starting to
separate and if not taken care of mold will start to appear. Let me
know what you want us to do when you speak to Andrew. We will not
start anything there until I hear from you .
Thanks
Colette
Original Message
From:
[mailto:
Sent: Friday, June 15, 2012 8:06 AM
To: Colette McGoldrick
Subject: Re: 10B
I'm waiting to hear back from Andrew, the super, to confirm the
building will be taking care of the cost of repairs since I'm
guessing it was a structural issue that caused the leak.
It seems quite expensive to replace the current flooring. Is there
perhaps a different alternative that would be less expensive; a
different type of wood flooring perhaps?
Also, the bedroom doesn't need to be done in this apt..we will be
carpeting it.
On Jun 15, 2012, at 1:58 PM, Colette McGoldrick
EFTA00548272
wrote:
Shall we start ripping up more of the floor in 10F it would be good
to take it up today that way it would dry out more over the weekend.
Thanks
Colette
Original Message
From:
[mailto:
Sent: Thursday, June 14, 2012 10:51 AM
To: Colette McGoldrick
Cc: •
Subject: Re: 10B
Sounds great. Thanks
On Jun 14, 2012, at 4:49 PM, Colette McGoldrick
wrote:
Hi=,
We don't have that apt on the schedule, but we can certainly do
that, I just put a call in to Andrew so I'm sure he will get back
EFTA00548273
to
me.
Kevin is in the city today so he is going to drop by and look at
apt 10F today so I will get back to you later.
Thanks
Colette
----Original Message
From:
[mailto:
Sent: Thursday, June 14, 2012 9:55 AM
To: Colette McGoldrick
Subject: Re: 10B
Thanks..
Has Andrew Lasso, the super intendant for the building gotten in
touch with you regarding working on the floors in 10F? We had some
issues in the flooring there where there was a leak and it caused
the floor to swell with huge mounds, so they had to remove alot of
the flooring to flatten it down again. It's a bit of a mess. That's
the apt we want worked on next after 10B and I asked Andrew to
schedule this with you and just wanted to see if he has?
On Jun 13, 2012, at 8:28 PM, Colette McGoldrick wrote:
ok we will be finished by Monday , all will be completed. Also I
EFTA00548274
received the check for the last 2 apts.
Thanks
Colette
Original Message
From:
[mailto
Sent: Wednesday, June 13, 2012 2:11 PM
To: Colette McGoldrick
Subject: Re: 10B
Can you please let me know when your men will be finished in 10B
so I know when to schedule the painter. Thanks!
On Jun 12, 2012, at 8:07 PM, Colette McGoldrick
wrote:
Hi=,
I just spoke to Susan regarding the floor repair that needs to be
done at apt # 10B. we discovered when we removed the carpeting
that
approx.
EFTA00548275
60 sq ft of flooring needs to be replaced. I have attached the
new proposal with the repair and also the baseboard that we had
spoken about previously. Can you let me know if it is ok to
proceed with this
repair.
Thanks
Colette
Original Message
From:
[mailto
Sent: Thursday, June 07, 2012 6:23 PM
To: Colette McGoldrick
Subject: Re: RE: RE: RE: RE:
Pm out of town, but will ask one of my colleagues to check.
On Jun 7, 2012, at 9:37 PM, Colette McGoldrick
wrote:
Hi=,
Can you check for me if there is a big yellow dryer in either of
the two apts that we finished for you last week.
Thanks
EFTA00548276
Colette
Original Message
From:
[mailto:
Sent: Wednesday, June 06, 2012 4:12 PM
To: Colette McGoldrick
Subject: Re: RE: RE: RE:
I will have my accountant send a check today
On Jun 6, 2012, at 8:39 PM, Colette McGoldrick
wrote:
I would prefer check but if you want to use credit card you can
Colette
Original Message
From:
[mailto:
Sent: Wednesday, June 06, 2012 1:34 PM
To: Colette McGoldrick
Subject: Re: RE: RE:
EFTA00548277
Do you prefer a check, or can I use a credit card?
On Jun 6, 2012, at 3:19 PM, Colette McGoldrick
wrote:
Hi=,
I was just wondering if you had a chance to send us a check
for the
2 apts that were completed.
Thanks
Colette
Original Message
From:
[mailto
Sent: Monday, June 04, 2012 7:27 AM
To: Colette McGoldrick
Subject: Re: RE:
Great! Thanks.
On Jun 4, 2012, at 1:15 PM, Colette McGoldrick
EFTA00548278
wrote:
Ok
June 11th it is.
Original Message
From:
[mailto:
Sent: Saturday, June 02, 2012 10:45 AM
To: Colette McGoldrick
Subject:
Hi Colette,
Can we please schedule to start the floors in 10B on June 11th?
<SARA 10B COUNTRY WHITE.doc>
<SARA 10F COUNTRY WHITE STAIN.doc>
<SARA 10B COUNTRY WHITE.doc><SARA 10F COUNTRY WHITE REFINISHING.doc>
EFTA00548279
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00548270.pdf |
| File Size | 282.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 6,258 characters |
| Indexed | 2026-02-11T22:32:13.650203 |