Back to Results

EFTA00549068.pdf

Source: DOJ_DS9  •  Size: 34.4 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Karyna Shuliak To: Lesley Groff Subject: Re: 10F Date: Wed, 17 Oct 2018 17:52:03 +0000 Still waiting for Anthony to start on the bathroom redo, paint, and some other touch ups. They are finishing other tenants apartments. It has now been almost 3 weeks since I met him, which is the estimate time he gave me to wait. Will follow up with him and copy you. Thank you. > On Oct 17, 2018, at 1:24 PM, Lesley Groff -MII.a> wrote: > how is apt 10F coming along? >> On Sep 27, 2018, at 11:09 AM, Karyna Shuliak -Maa> wrote: » Hi Anthony, >> We need to have work done in apartment 10F. The bathroom needs to be redone, bedroom window replaced, bedroom blinds fixed, some paint work in the closets. >> When can we schedule a meeting to look at it together and figure out a plan? » Please advice. » Thank you, » Karyna EFTA00549068

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA00549068.pdf
File Size 34.4 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 846 characters
Indexed 2026-02-11T22:32:30.416396
Ask the Files