Back to Results

EFTA00550290.pdf

Source: DOJ_DS9  •  Size: 109.6 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Daphne Wallace <I To: michael glidden , Rich Kahn >, LSJ GSJ Kyle reavis Subject: Re: Shipping Updates - November 6, 2018 Date: Tue, 06 Nov 2018 21:50:18 +0000 Greetings Mike, Update: BOL 13414959 - Integrity Marine Corp. - Rubrail - will schedule to sail 11/9 - EDA on STT 11/14 On Tue, Nov 6, 2018 at 4:27 PM Daphne Wallace < wrote: Greetings Mike, Arrived/Sailed/Booked to Sail BOL 13384039 - on LSJ Artistic Tile - LSJ Cabana Tiles - wall tiles, mortar Artistic Tile - LSJ Master Bath Add-On Thassos tile, mortar, sealer Warren Power - (2) D 125-8 Electric Generators for GSJ - on GSJ Barn Light Electric Co LLC Steel Factory Mfg. - (60) Q45-17 58" S-Panel 20 Gauge Home Depot - H3501-120359 - GSJ range/dishwasher/microwave Absolute Hardwood Flooring - Flooring chemicals BOL 13392010 - South Florida Trailers Mfr - Zodiac 25' trailer - on LSJ BOL 13387445 - on LSJ Adventure Sports Inc - Windsurfer/Boom/Sail/Attachments Pottery Barn Amazon Zuri Goal Zero Amazon - JE's STC office chair BOL 13413071 - sailed 11/2 - EDA on STT 11/8 - will clear 11/7 - Sean Dobbs on site 11/12 Gemini Seawater - Media Filter and other RO plant components JCH - (2) pumps BOL 13384001 - Warren Cat - Caterpillar Model 307 Midi Excavator - NOW booked to sail 11/7 - EDA on STT 11/11 BOL 13419279 - booked to sail Wednesday, 11/7 - EDA on STT 11/11 Cali Bamboo - bamboo fencing Pryde America - Surf board EGS International - Dark tint glass sliders/fixed windows - LSJ Gym & Ballet rooms Gemini Seawater Systems - well drilling equipment BOL 13388507 - Groundworks - (4) Zahidi Palms (20' CT), (25) Sea Grapes (25 gallons) - EDA to Tropical FL 11/8 - scheduled to sail 11/9 - EDA on STT 11/14 BOL 13419617 - Overhead Door of South Florida - (2) Overhead Rolling Service doors for GSJ Quonsets - at Tropical FL - scheduled to sail 11/9 - EDA on STT 11/14 BOL13412243 - Carmix - Carmix 5.5XL Self-Loading Mixer/Manuals/Keys - NOW EDA to MIA 11/7 - Lund & Pullara will bond and transport to PPB EFTA00550290 BOL 13414959 - Barbour Plastic Inc. -1 tube - Tally Report attached BOL 13415821 - B. I. Warehouse - 3 pieces Machinery parts - Tally Report attached Awaiting Delivery to Tropical Loranger - Library Baldwin Hardware in Dark Bronze finish - EDA to Tropical FL 11/9 Restoration Hardware - Chair for LSJ Master Bathroom - EDA to PB House by 11/17 Brown Jordan - Cabinets/Appliances for LSJ Tiki Hut kitchen - deposit paid 10/5 - Lead time 3 to 4 weeks Gemini Seawater Systems - Replacement of the Seawater Supply Pumping Station - payment made 10/14 - weeks Gemini Seawater Systems - 25K GPD Containerized Seawater RO System for GSJ - purchased 9/14 - EDA 12/31 Warren Power - (2) D 175-8 Electric Generators for LSJ - purchased 10/5 - Lead time 12-13 weeks Warren Cat - Caterpillar Model 325 Excavator - in TX - EDA to Tropical FL pending JLG TH-1255 Telehandler - in TX - EDA to Tropical FL pending Caterpillar 272 Skid Steer - in TX 10/31 - EDA to Tropical FL pending Lead time 6-8 to Tropical FL EFTA00550291

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00550290.pdf
File Size 109.6 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,065 characters
Indexed 2026-02-11T22:32:45.215384
Ask the Files