EFTA00560152.pdf
PDF Source (No Download)
Extracted Text (OCR)
From: Sarah K <
To: Rich Khan <
Subject: Fwd: Epstein Master Bathroom
Date: Thu, 16 Dec 2010 18:06:21 +0000
Inline-Images: image001.jpg
here is the email which Sacco says we can not use our credit for this job. this is only for one rug out of 4.. I'm
trying to get the quotes for the other 3 rugs..
Begin forwarded message:
From: Kim Steube
Date: December 13, 2010 2:25:41 PM EST
To: Sarah K <
Subject: RE: Epstein Master Bathroom
I'm waiting to hear back from the manufacture to confirm the sample lead-time. But I image it will be 3-4 weeks because
of the holidays coming up.
Also, we can not apply any credit to this order because this not a product made with one of our mills. This product is only
made through a local domestic manufacture.
Let me know if you have any questions.
Nek
SACCO
KIM STEUBI.:
520 BROADWAY
6Th FLOOR
NEW YORK. NY 10012
T )
IF)
www.saccocarpotom
From: Sarah K [mailto
Sent: Monday, December 13, 2010 12:24 PM
To: Kim Steube
Subject: Re: Epstein Master Bathroom
Thank you Kim,
Is it possible to apply any of Jeffrey's credit to this order?
Also, if we got a strike off, how long would that take to get?
On Dec 13, 2010, at 12:16 PM, Kim Steube wrote:
Hi Sarah,
Estimate attached for the Master Bathroom Rug. The lead-time is approx 8 weeks.
Let me know if you have any questions.
Thanks,
EFTA00560152
<image001 jpg?
KIM STEUBE
520 BROADWAY
6TH FLOOR
NEW YORK. NY 10012
Tj
IF)
WWWS3CCOC3rIVIC0711
<SOSORDI.ptlf>
EFTA00560153
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00560152.pdf |
| File Size | 62.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,498 characters |
| Indexed | 2026-02-11T22:38:19.306212 |