Back to Results

EFTA00568952.pdf

Source: DOJ_DS9  •  Size: 41.9 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: To: Subject: Re: Date: Fri, 30 Sep 2011 20:18:20 +0000 JE wants him to do the walls of my office on the 5th floor at 71st, and he will need to do a few rooms on LSJ starting the 3rd week of October. On Sep 30, 2011, at 4:16 PM, wrote: > We were paying ian a monthly rate. Does he have other jee work to begin. I know he has not worked in a while. If not ask him cost of job or daily rate. Hope this helps.. > Rich O1,1 Message > From: > To: Rich Kahn > Subject: > Sent: Sep 30, 2011 3:36 PM > Hey rich.. > quick question.. how is Ion paid? Is he on salary, or do we pay him per job, hour? I only ask because he was doing some samples for 71st this week, and I mentioned I needed my apt painted and asked when his friend Michael(the painter) would be back in town. Ion then asked me if I had considered doing venetian plaster, which is something Ion would do. I don't want to consider it if Ion is much more expensive than Michael for a normal paint job, but if it's not, then I would love to do venetian plaster. can you pls let me know? thanks! > Sent from my Verizon Wireless BlackBerry EFTA00568952

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA00568952.pdf
File Size 41.9 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,130 characters
Indexed 2026-02-11T22:43:25.817350
Ask the Files