Back to Results

EFTA00569711.pdf

Source: DOJ_DS9  •  Size: 167.5 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Zorro Ranch To: Merwin Dela crux , lokin leo ahoo.com marlynmf@yahoo.com, sonamdema534@gmail.com, Karyna Shuliak Subject: 71st Date: Tue, 05 Sep 2017 13:18:29 +0000 Morning to All I just wanted to thank you all very all your help and hard work over the last week. Below are just some notes in reference to 71st Items to Zorro: Note JE to review furniture, there may be possible changes Fire Extinguishers: Units that have been missed in the past, in hallway basement Review hanging Fire Extinguishers (have marked some possible locations with blue tape) and possible small Fire Extinguishers under bathroom sinks Fire Suppression System - Basement Kitchen, please tag that system is off line Ladders: Place ladders on each floor, marking their location on each ladder (need to be relocated from Basement Staff Bathroom Area) Tags etc: Remove all tags from hairdryers, lamps, lights, appliances Lower Basement: Complete Clean Up Sort Out Inventory Filters - review storage - raising on plastic pallets Basement: Service Entrance - Purchase/Install Rack for Snow Shovels etc (take items off ground) Complete tidy up of area Place covers on lights Review options to make trash area more efficient - noting vendors use this as an entrance and this is a fire exit Comms Tech Room - x 2 Filing Cabinets, sorted/shredded (relocate to 6th floor) Recover all electrical panels Relocate White Shelving from 5th Floor, marked out area Laundry - Complete demo of Media Racks, review removal of x 2 doors and subfloor Shelving/Storage Unit to be installed for cleaning products Cisco Room - Total Clean Up removal via Best Buy for Electronic items Art Work - Hang Large Art Work Pieces on Hallway in Basement Staff Bathroom - EFTA00569711 Replace damaged/broken shower faucets Clean/Sort/Inventory all Bathroom, Locks, Plumbing items in closet in Toilet Area Relocate all Paint/Vamish/Flammable items to Lower Basement Flammable Storage Lockers Kitchen - Zorro x 1 Cream Sofa (84 x 38) with Seat Cushions on Art Storage Room Karyna will purchase wood stand and cover Karyna review purchase new Dishwasher Basement Kitchen Leo to use tall metal shelving for 301 Merwin if possible to use horizontal metal shelving Ground Floor: Contact Sawyers - Possible Front Door Signal via Cell Phones, way to communicate within entire house Review if landline phones in Cisco Room can be used or out dated, possible can be used for parts by Sawyers 2nd Floor: Review x 2 Guest Powder Room Lamp Shades - require replacement Picture Light Guest Powder Room needs to be raised to upper frame * Confirming items off 2nd Floor Kitchen and Back Stair Line as of date and time to stay in this location - a review of the umbrella is required Zorro - x 2 Sofas (43D x 90L) X 1 Ottoman (51 x 51) 3rd Floor: Karyna to review pencil drawing to be hung 4th Floor: Mech Storage Area - Complete tidy up, remove/dispose TV, boxing bag - Donate/Relocate with others Guest Bedrooms - no plastic and wire hangers in closets TV's to be removed from rooms, Karyna will advise Generally thought house all tags/stickers to be removed Guest Bathrooms - fold towels in bathrooms as in storage and try and keep the same towel style in each bathroom Karyna will work on bathroom sets (tissue boxes, containers etc) Blue Bedroom - Require King Pillowcases Karyna to review possible use of cream sofa in lower kitchen, replacing leather pieces which possibly could go to Zorro Folded Bedspread needs a quick steam Towel Holder in toilet area needs to be secured Pink Bedroom - Center Bed on Wall - noting legs are not attached to frame Karyna to address issues with area rug Replace Toilet seat for White Self Closing Toilet Seat Fix Shower Upper Light 5th Floor: Mech Area - Complete Tidy Up Covers Back on Electrical Panels EFTA00569712 White Shelving (60 x 29 x 35H) possible relocation to Basement Mech Bay) Zorro - Desk 76 x 36 x 30H Coffee Table 56 x 39 x 18H 6th Floor: Review Damaged Light Shade JE' s Office Desk - needs replacing Lightbulb Storage - Tidy Up, Inventory Fan in bathroom on 24/7 - please review X 2 Containers Picture Lights - ? Maps & Plans - to be worked on moving forward 6th Floor - Upper Level: (Note No Fire Extinguishers on this Level) Tidy Clean Up - Remove Old Lights/Batteries/Old Ducting Thank you once again, if any problems or concerns please let me know Warmest regards Sent from my iPad EFTA00569713

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Email Addresses

Document Details

Filename EFTA00569711.pdf
File Size 167.5 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 4,481 characters
Indexed 2026-02-11T22:43:54.360602
Ask the Files