EFTA00577525.pdf
PDF Source (No Download)
Extracted Text (OCR)
ESTATE PROGRESS REPORT — September 26, 2003
71S1 STREET
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Jean
Jean to be at 71° St Oct 2 at 2PM & spend remainder of day there.
51h Floor
1. GM study to be redecorated. GM would like a very simple
white room — GM asked Jean to come up with a simple scheme.
2. JE wants 56 floor staff room to be repainted. Doug has been
informed.
3. Lynn & Jojo are to move into the basement — JE to advise if 5'h
floor is to become guest rooms, if it is to be decorated by Pinto & if
the old carpets (bathroom etc) are to be used for that area?
JE to see room & advise on return to NY.
Pinto - Jean
JE
6'h Floor
Round table: is in the process of being restored. Expected
completion by Oct 10.
J Burdine
10/10
Bids / Contracts
All contracts awarded.
Ceiling Speakers
Speakers to be installed in MBR & MBR Sitting Room. Doug has
organized to have speaker wire installed.
Doug
Dining Room
1. Table-top: Brian Kelly is storing new rectangular table-top in
his shop until after construction phase.
2. Lighting: JE approved two chandeliers instead of spotlights.
3. Carpet: JE approved green-striped carpet.
Pinto - Jean
Entry Hall
1. Entry hall door: door location to be changed.
(Doug has been reminded of electric and security.)
EFTA00577525
ESTATE PROGRESS REPORT — September 26, 2003
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
2. Entry hall marble floor: Jean to forward Doug plan for parquet
floor so Doug may price. Floor plan received — 2 floor people
coming to 7 Pi Sept 22 to view and make a bid for the work.
Pinto - Jean
Kitchen Service
Corridor
The floor should be changed as it is peeling & the walls repainted.
Jean to adivse color on next visit to NY.
Pinto - Jean
MBath
1. MBath carpet: border of original carpet to be left & Jean to
provide new insert. JE chose blue & white carpet.
2. Ceiling: men minus their parts approved. Scheduled to begin
beginning of Oct.
3. JE approved a bed, & little table: Pinto to purchase.
Pinto — Jean
Pinto - Jean
Pinto
MBR
Windows: to be further sound-proofed. Acoustical co. selected.
Doug
Mirrors
Second floor landing: The tapestry is being kept in storage as it
could not be kept under the mirrors because the mirrors would not
stick to it.
Oriental Rug
Doug met with Costikyan & they have settled how & where to cut
rug. Expected completion by Dec.
Costikyan
Schedule
Finalized schedule to be available after Jean's next visit to NY.
Technology
1. Security: Surveillance Cameras (3rd Floor): wiring complete.
Cameras to be installed once construction near completion.
2. Computer: Upgrade for Landis BMS to be scheduled to
coincide with upgrade of 3rd floor a/c system.
2
EFTA00577526
ESTATE PROGRESS REPORT — September 26, 2003
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
3. Antenna: Sawyers is testing system.
Installed — 2 Nextel
phones to be purchased to test system.
4. Computer Networking — WIFI entire house. Complete except
in areas under construction.
5. MBR A/C Upgrade: Sequence of investigation determined in
Sept 4 meeting.
To start with New Air Balancing Report.
Awaiting confirmation. 71St St is currently on 9- zone fan — it will
have a separate MBR fan. Quote for pricing of fan, possible chiller
& cooling tower upgrade expected by Oct 3.
Sawyers
Sawyers
Terrace
Jean to make recommendations re: terrace on next visit to NY
Oct 2.
Pinto - Jean
Bio Gear
Dupont to ship the 3 bio suits on Sept 23 — delay due to co. running
out of materials.
Dupont
Blackout Update
Since Black Out the following Emergency Systems have been
checked or tested to assure proper operation in the event of a power
failure. The following list contains the results of these tests.
1. The Emergency generator has been tested and serviced by
cummings metro power, they found & repaired an oil leak &
suggest that the cooling radiator be cleaned & flushed. To be done
week of Sept 29.
2. Battery lighting inverter that supplies lights when Con Edison
power fails & generator is starting up needs battery racks changed
all 48 batteries are past life expectancy & need replacement - cost
is $11,472 to put system back to original design. JE to approve.
JE
3
EFTA00577527
ESTATE PROGRESS REPORT — September 26, 2003
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
3. A meeting with Otis elevator to review operation problems
during power failures with main passenger elevator. Mechanic to
come in and review control system of elevator week of Sept 2.
4
EFTA00577528
ESTATE PROGRESS REPORT — September 26, 2003
457 MADISON
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Office Dividers
GM viewed sample dividers at H Miller showroom. GM selected
free-standing units that require no structural work to the office in two
woods, dark brown cherry (standard) & mahogany dark (special-
order, more expensive). If JE approves, a rep to visit office to
measure & price. Color samples at 457 for JE to view.
JE
Office Computers 1. Upgrade / change computers, new programs.
a. Approved: 21 computers to be re-vamped - 10 new computers
have been ordered; 11 remaining to be upgraded as needed.
b. 13 monitors to be replaced with LCD's. 18" black LCD's have
been installed. All are replaced except for 1 at 457 (a shipping
error), PB, & GM at 71st which should arrive Sept 26.
I I.
2. New system: Consultants' report fed ex'd to JE in LSJ.
5
EFTA00577529
ESTATE PROGRESS REPORT — September 26, 2003
PALM BEACH
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Rennovations
1. Pascal due in PB end of Oct to review work that needs to be
done. Pascal thinks construction will be ready to start in early Dec.
JE advised constr to commence in Feb 2004 as planned.
2. Pascal has provided a modified plan for enlarging the breakfast
room. Construction co. needed plans to apply for permit. JE
advised Pascal to have constr co. choose the architect.
Pinto - Pascal
Air Conditioning Cassidy has completed project.
Complete
Computer
Networking /
WirelessNetwork
Upgrade
1. SL Powers has completed re-wiring.
2. PC Paramedics have ordered 8 access points, expected week of
Sept 22. To be installed once received.
PC Paramed
Complete
Curtains
Falling curtains in several rooms to be re-hung temporarily so that
they will last until renovations start. Ray Dicrosta (who performed
carpentry work in the house) to re-hang week of Sept 29, after JE's
departure.
Ray Dicrosta
Mercedes
Guard car is complete. Jojo to drive car to NY Sept 25.
Painting
Small areas within house have been re-touched.
Complete
JE to view
Repairs
Carpenter has completed work.
Complete
JE to view
6
EFTA00577530
ESTATE PROGRESS REPORT — September 26, 2003
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Tiles
1. Tiles by kitchen door have been changed. GM viewed photos &
thinks it does not look so good. JE, please have a look &
recommend changes, if any. JE to advise.
2. Stopek proposes to add potted flowering plants to the side facing
kitchen. Awaiting written estimate but Stopek averages $400.
JE
Stopek
Complete
JE to view
7
EFTA00577531
ESTATE PROGRESS REPORT — September 26, 2003
PARIS
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Boudoir
Carpet has been installed.
Complete
JE to view
Gym Room
JE discussed with Pinto on site & decided on wall sconces &
double doors.
Pinto - Jean
JE office
Horseshoe table /Ash tray is expected in December.
Pinto - Jean
Kitchen
A/C to be fixed in conjunction with construction. New A/C co to
be sourced & scheduled.
Pinto
Living Room
Separation to be added to round end of living room & new section
to be converted into MBR sitting room. Jean to buy 2 screens.
Pinto — Jean
Shower Pump
Pressure
Pressure to be re-adjusted. New plumber to be sourced &
scheduled.
Pinto
EFTA00577532
ESTATE PROGRESS REPORT — September 26, 2003
PARIS - NEW APARTMENT
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Change Windows
before Winter
Double window to be changed to single window.
Construction
Demolition has commenced. Expected completion in April 2004.
New A/C & plumbing co's to be contracted will delay the schedule
and the receipt of the schedule, as nothing can be confirmed until
the new co's are on board. JE to advise if the new layout is
approved. Plans sent in Sept 12 report.
Pinto - Jean
JE
9
EFTA00577533
ESTATE PROGRESS REPORT — September 26, 2003
PLANES
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
727 Boeing
1. Larry M awaiting fabric selection for office chair. JE to advise.
2. "C" Check / MSG3 heavy maintenance - expected completion
by Oct 25 provided there are no problems or glitches.
3. Pacific Gas Turbines of San Diego contracted for No. 2 engine
heavy maintenance at "C" Check. Engine to be shipped &
returned before completion of "C" Check, no rental engine
required.
4. JE working directly with designer for scheme. JE advised to
keep titanium, add red stripes, & maybe extend stripes. More
renderings expected.
5. Shower Installation — in progress. (Cabinets in Savannah,
Engineering in Dallas, Mechanicals in Waco.) JE selected beige
UltraLeather for headliner & toilet seat/lid to match the beige in
the carpet. Larry M has ordered material.
6. Eric has notified insurance co that 727 will be down for "C"
check. They will refund 30% of the premium once the plane
exceeds 45 days down.
JE
10/25
Bell
Helicopter
1. Larry V is confirmed for Bell maintenance course Dec 1-12.
2. Helicopter is operational.
3. Larry & GM to fly Bell to LSJ Sept 29.
10
EFTA00577534
ESTATE PROGRESS REPORT — September 26, 2003
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Gulfstream
No. 2 engine is disassembled and awaiting inspection at Dallas
Airmotive, Millville. Expected re-installation by Oct 31.
10/24
10/31
Pilots
Dave completed GS recurrent training Sept 19. Dave is in Flight
Engineering Sept 24-26.
II
EFTA00577535
ESTATE PROGRESS REPORT — September 26, 2003
STAFF
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Construction
Manager and
Estate Manager
Still looking for candidate.
Zorro Maint.
Person
GM /
working with agencies & looking locally to GM /
source new staff.
Palm Beach
Couple
Rosalie & husband arrived in PB Sept 25. GM is training them.
Housekeeper
Christophe — GM has not told him yet that he will not be working
at the house.
Rick Harrington
Is there any further action to be taken?
JE
sent reminder to GM to discuss their contract. JE
They would like to clear their contract issues. JE to advise how to
proceed.
Vacation
Requests
Larry M requests holiday from Jan 1 through Jan 7 — he has family
arriving in FL. JE to advise.
JE
12
EFTA00577536
ESTATE PROGRESS REPORT — September 26, 2003
MISCELLANEOUS
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Directories
40 directories sent to the binder Sept 23 — they will take 3
weeks to bind. Samples of each of the 3 covers ready by
Oct 1. Metal binders have been ordered, expected by Oct 24.
10/17
Tea Pots
Hand-blown / hand-painted tea pots & French tea pots from
Monaco have been ordered. All expected by Oct 3.
10/3
NetJets
JE wanted GM to switch from Flight Options to NetJets.
Please see attached package. JE to advise if any further
action to be taken.
JE
Christmas Gifts
JE to advise who to send gifts to this Christmas. Please see
attached list of last year's recipients. *A-1
JE
13
EFTA00577537
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00577525.pdf |
| File Size | 627.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 11,653 characters |
| Indexed | 2026-02-11T22:48:32.325800 |