ESTATE PROGRESS REPORT — September 26, 2003 71S1 STREET LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Jean Jean to be at 71° St Oct 2 at 2PM & spend remainder of day there. 51h Floor 1. GM study to be redecorated. GM would like a very simple white room — GM asked Jean to come up with a simple scheme. 2. JE wants 56 floor staff room to be repainted. Doug has been informed. 3. Lynn & Jojo are to move into the basement — JE to advise if 5'h floor is to become guest rooms, if it is to be decorated by Pinto & if the old carpets (bathroom etc) are to be used for that area? JE to see room & advise on return to NY. Pinto - Jean JE 6'h Floor Round table: is in the process of being restored. Expected completion by Oct 10. J Burdine 10/10 Bids / Contracts All contracts awarded. Ceiling Speakers Speakers to be installed in MBR & MBR Sitting Room. Doug has organized to have speaker wire installed. Doug Dining Room 1. Table-top: Brian Kelly is storing new rectangular table-top in his shop until after construction phase. 2. Lighting: JE approved two chandeliers instead of spotlights. 3. Carpet: JE approved green-striped carpet. Pinto - Jean Entry Hall 1. Entry hall door: door location to be changed. (Doug has been reminded of electric and security.) EFTA00577525 ESTATE PROGRESS REPORT — September 26, 2003 LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE 2. Entry hall marble floor: Jean to forward Doug plan for parquet floor so Doug may price. Floor plan received — 2 floor people coming to 7 Pi Sept 22 to view and make a bid for the work. Pinto - Jean Kitchen Service Corridor The floor should be changed as it is peeling & the walls repainted. Jean to adivse color on next visit to NY. Pinto - Jean MBath 1. MBath carpet: border of original carpet to be left & Jean to provide new insert. JE chose blue & white carpet. 2. Ceiling: men minus their parts approved. Scheduled to begin beginning of Oct. 3. JE approved a bed, & little table: Pinto to purchase. Pinto — Jean Pinto - Jean Pinto MBR Windows: to be further sound-proofed. Acoustical co. selected. Doug Mirrors Second floor landing: The tapestry is being kept in storage as it could not be kept under the mirrors because the mirrors would not stick to it. Oriental Rug Doug met with Costikyan & they have settled how & where to cut rug. Expected completion by Dec. Costikyan Schedule Finalized schedule to be available after Jean's next visit to NY. Technology 1. Security: Surveillance Cameras (3rd Floor): wiring complete. Cameras to be installed once construction near completion. 2. Computer: Upgrade for Landis BMS to be scheduled to coincide with upgrade of 3rd floor a/c system. 2 EFTA00577526 ESTATE PROGRESS REPORT — September 26, 2003 LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE 3. Antenna: Sawyers is testing system. Installed — 2 Nextel phones to be purchased to test system. 4. Computer Networking — WIFI entire house. Complete except in areas under construction. 5. MBR A/C Upgrade: Sequence of investigation determined in Sept 4 meeting. To start with New Air Balancing Report. Awaiting confirmation. 71St St is currently on 9- zone fan — it will have a separate MBR fan. Quote for pricing of fan, possible chiller & cooling tower upgrade expected by Oct 3. Sawyers Sawyers Terrace Jean to make recommendations re: terrace on next visit to NY Oct 2. Pinto - Jean Bio Gear Dupont to ship the 3 bio suits on Sept 23 — delay due to co. running out of materials. Dupont Blackout Update Since Black Out the following Emergency Systems have been checked or tested to assure proper operation in the event of a power failure. The following list contains the results of these tests. 1. The Emergency generator has been tested and serviced by cummings metro power, they found & repaired an oil leak & suggest that the cooling radiator be cleaned & flushed. To be done week of Sept 29. 2. Battery lighting inverter that supplies lights when Con Edison power fails & generator is starting up needs battery racks changed all 48 batteries are past life expectancy & need replacement - cost is $11,472 to put system back to original design. JE to approve. JE 3 EFTA00577527 ESTATE PROGRESS REPORT — September 26, 2003 LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE 3. A meeting with Otis elevator to review operation problems during power failures with main passenger elevator. Mechanic to come in and review control system of elevator week of Sept 2. 4 EFTA00577528 ESTATE PROGRESS REPORT — September 26, 2003 457 MADISON LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Office Dividers GM viewed sample dividers at H Miller showroom. GM selected free-standing units that require no structural work to the office in two woods, dark brown cherry (standard) & mahogany dark (special- order, more expensive). If JE approves, a rep to visit office to measure & price. Color samples at 457 for JE to view. JE Office Computers 1. Upgrade / change computers, new programs. a. Approved: 21 computers to be re-vamped - 10 new computers have been ordered; 11 remaining to be upgraded as needed. b. 13 monitors to be replaced with LCD's. 18" black LCD's have been installed. All are replaced except for 1 at 457 (a shipping error), PB, & GM at 71st which should arrive Sept 26. I I. 2. New system: Consultants' report fed ex'd to JE in LSJ. 5 EFTA00577529 ESTATE PROGRESS REPORT — September 26, 2003 PALM BEACH LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Rennovations 1. Pascal due in PB end of Oct to review work that needs to be done. Pascal thinks construction will be ready to start in early Dec. JE advised constr to commence in Feb 2004 as planned. 2. Pascal has provided a modified plan for enlarging the breakfast room. Construction co. needed plans to apply for permit. JE advised Pascal to have constr co. choose the architect. Pinto - Pascal Air Conditioning Cassidy has completed project. Complete Computer Networking / WirelessNetwork Upgrade 1. SL Powers has completed re-wiring. 2. PC Paramedics have ordered 8 access points, expected week of Sept 22. To be installed once received. PC Paramed Complete Curtains Falling curtains in several rooms to be re-hung temporarily so that they will last until renovations start. Ray Dicrosta (who performed carpentry work in the house) to re-hang week of Sept 29, after JE's departure. Ray Dicrosta Mercedes Guard car is complete. Jojo to drive car to NY Sept 25. Painting Small areas within house have been re-touched. Complete JE to view Repairs Carpenter has completed work. Complete JE to view 6 EFTA00577530 ESTATE PROGRESS REPORT — September 26, 2003 LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Tiles 1. Tiles by kitchen door have been changed. GM viewed photos & thinks it does not look so good. JE, please have a look & recommend changes, if any. JE to advise. 2. Stopek proposes to add potted flowering plants to the side facing kitchen. Awaiting written estimate but Stopek averages $400. JE Stopek Complete JE to view 7 EFTA00577531 ESTATE PROGRESS REPORT — September 26, 2003 PARIS LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Boudoir Carpet has been installed. Complete JE to view Gym Room JE discussed with Pinto on site & decided on wall sconces & double doors. Pinto - Jean JE office Horseshoe table /Ash tray is expected in December. Pinto - Jean Kitchen A/C to be fixed in conjunction with construction. New A/C co to be sourced & scheduled. Pinto Living Room Separation to be added to round end of living room & new section to be converted into MBR sitting room. Jean to buy 2 screens. Pinto — Jean Shower Pump Pressure Pressure to be re-adjusted. New plumber to be sourced & scheduled. Pinto EFTA00577532 ESTATE PROGRESS REPORT — September 26, 2003 PARIS - NEW APARTMENT LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Change Windows before Winter Double window to be changed to single window. Construction Demolition has commenced. Expected completion in April 2004. New A/C & plumbing co's to be contracted will delay the schedule and the receipt of the schedule, as nothing can be confirmed until the new co's are on board. JE to advise if the new layout is approved. Plans sent in Sept 12 report. Pinto - Jean JE 9 EFTA00577533 ESTATE PROGRESS REPORT — September 26, 2003 PLANES LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE 727 Boeing 1. Larry M awaiting fabric selection for office chair. JE to advise. 2. "C" Check / MSG3 heavy maintenance - expected completion by Oct 25 provided there are no problems or glitches. 3. Pacific Gas Turbines of San Diego contracted for No. 2 engine heavy maintenance at "C" Check. Engine to be shipped & returned before completion of "C" Check, no rental engine required. 4. JE working directly with designer for scheme. JE advised to keep titanium, add red stripes, & maybe extend stripes. More renderings expected. 5. Shower Installation — in progress. (Cabinets in Savannah, Engineering in Dallas, Mechanicals in Waco.) JE selected beige UltraLeather for headliner & toilet seat/lid to match the beige in the carpet. Larry M has ordered material. 6. Eric has notified insurance co that 727 will be down for "C" check. They will refund 30% of the premium once the plane exceeds 45 days down. JE 10/25 Bell Helicopter 1. Larry V is confirmed for Bell maintenance course Dec 1-12. 2. Helicopter is operational. 3. Larry & GM to fly Bell to LSJ Sept 29. 10 EFTA00577534 ESTATE PROGRESS REPORT — September 26, 2003 LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Gulfstream No. 2 engine is disassembled and awaiting inspection at Dallas Airmotive, Millville. Expected re-installation by Oct 31. 10/24 10/31 Pilots Dave completed GS recurrent training Sept 19. Dave is in Flight Engineering Sept 24-26. II EFTA00577535 ESTATE PROGRESS REPORT — September 26, 2003 STAFF LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Construction Manager and Estate Manager Still looking for candidate. Zorro Maint. Person GM / working with agencies & looking locally to GM / source new staff. Palm Beach Couple Rosalie & husband arrived in PB Sept 25. GM is training them. Housekeeper Christophe — GM has not told him yet that he will not be working at the house. Rick Harrington Is there any further action to be taken? JE sent reminder to GM to discuss their contract. JE They would like to clear their contract issues. JE to advise how to proceed. Vacation Requests Larry M requests holiday from Jan 1 through Jan 7 — he has family arriving in FL. JE to advise. JE 12 EFTA00577536 ESTATE PROGRESS REPORT — September 26, 2003 MISCELLANEOUS LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Directories 40 directories sent to the binder Sept 23 — they will take 3 weeks to bind. Samples of each of the 3 covers ready by Oct 1. Metal binders have been ordered, expected by Oct 24. 10/17 Tea Pots Hand-blown / hand-painted tea pots & French tea pots from Monaco have been ordered. All expected by Oct 3. 10/3 NetJets JE wanted GM to switch from Flight Options to NetJets. Please see attached package. JE to advise if any further action to be taken. JE Christmas Gifts JE to advise who to send gifts to this Christmas. Please see attached list of last year's recipients. *A-1 JE 13 EFTA00577537

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00577525.pdf
File Size 627.0 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 11,653 characters
Indexed 2026-02-11T22:48:32.325800
Ask the Files