ESTATE PROGRESS REPORT — September 26, 2003
LSJ
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
JE / MILES
BEACH OFFICE
Entry Road & Circle
Entry road & circle being reworked.
Miles
In progress
DOCK
Floating Platform and
Dock
Sand wood and apply wood sealer. Completion by Oct 15.
Miles
10/15
GYM
Gym Main Room
External wall to be built on patio, encased with dark wood. JE
wants sample — no work done — no sample ordered.
Miles
Not started
Flower Pots
To be rearranged.
Matt/Miles
MAIN CURRENT HOUSE
Lanterns
Lanterns in France for LSJ have been damaged in shipment -
some broken glass. Sent to be restored. No completion date
yet.
Lights
Lights that shine up & down to be sourced to replace glass
hurricane lamps located outside of the house. Daniel found a
line of outdoor lights that he thinks is perfect but slightly
smaller than JE wanted — he is looking to see if he can find the
same but larger.
Daniel R
Courtyard
Four lights to be installed in large trees (5 trees total).
Bruce White
Christmas lights
Christmas lights to be installed in large trees for the season.
Bruce White
I
EFTA00577538
ESTATE PROGRESS REPORT — September 26, 2003
LSJ
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
MASTER BEDROOM
MBR Stairs Down to
Beach
Top half of stairs to be completed by Sept 30.
Miles / Stone
Masons
8/29
9/30
Shoe Rack
GM to purchase tall shoe rack for MBR.
GM
LANDSCAPING / IRRIGATION
MBR / Terrace Area
1. Stone wall to be built as wind break b/w MBR & sea cliff
(above curved steps). The wall to be as high as salt bush.
2. Provisions to be made for planters.
Miles
Not started
Terrace Area
Platform - MBR
1. Screens to be built on both sides to enhance the windbreak.
Expected completion by Oct 10.
2. Planting to occur in front of platform.
Miles
Miles
Not started
10/10
Wall — Old Heli Pad
Construction of the wall to hide old helicopter pad is in
progress.
Miles
In progress
Miscellaneous
Build planter on east facing gym wall.
Miles
Not started
New Owner's Road
and Other Areas
Focus points to be created at road corners.
Not started
Big Trees
Approved - 100 trees. Trees are tagged and ready to be pulled
for delivery by Oct 10.
We Be Trees,
Inc.
10/10
Fruit Trees
Mahaffey provided list of suitable fruit trees - approved by
Madison. Mahaffey to price chosen trees. Madison to select
suitable site for trees on next visit to LSJ.
Mahaffey /
Madison
2
EFTA00577539
ESTATE PROGRESS REPORT — September 26, 2003
LSJ
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Mulch / Seedlings
Approved - container of mulch & seedlings ordered. Delivery
by Oct 10.
Matt
10/10
POOL
Rock at Swimming
Pool
Rock top lowered.
Complete
JE to view
KAWASAKI ATV
4x4 Kawasaki ATV
4x4 Kawasaki delivered to LSJ.
Complete
JE to view
NANNA
4 Stroke Engine
Larry's info on 2 & 4-stroke engines:
1. The 300 hp Yamaha HPDI engine is not avail until mid-Dec.
The noise level will be comparable to the 250 hp Yamaha &
may not be worth the increased weight for the boat only to gain
5 mph in speed. It is certainly worth waiting for the big 4-
stroke engine due out next year — with noticeable vibration &
noise reduction.
2. 225 hp is the largest Yamaha 4 stroke at this time.
3. Mercury Outboards — they are scheduled to announce In Line
6 cylinder 250 hp 4 stroke engine at the Feb 2004 boat show.
This engine will be supercharged & have a growth potential up
to 350-400 hp after reliability has been proven.
JE advised to wait until Jan.
On hold
3
EFTA00577540
ESTATE PROGRESS REPORT — September 26, 2003
LSJ
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Replacement
Tubes/Fitting Kit +
teak and fiberglass
Project in progress. Glue on LSJ. Project to recommence on
September 26. Completion +/- 10 working days.
FAT CAT
Fat Cat
To be renamed Lady G. Documentation sent to USCG for
name change. Please advise decision on font & language per
samples sent.
JE
SEAMORE
1013
Re-powering
Installation of engine & necessary modifications are ongoing,
Sea trials went well. Expected delivery by Oct 3.
Boscoe
9/19
LADY G
Name
To be named Lady G II. JE to approve font so that name can be
put on console.
JE
CART PATHS
Slip Road to Gym
1. New road to the gym has been cut, stone work around
triangle completed & cactus garden planted.
2. Stone walls in that area are currently being reworked to make
them similar to the new walls. Ongoing.
Miles
Ongoing
Complete
JE to view
Approach Road to
Gym
Width of road near the gym entrance to be reduced. Combined
with slip road to gym helipad. Ongoing, currently rebuilding
road to helipad.
Ongoing
4
EFTA00577541
ESTATE PROGRESS REPORT — September 26, 2003
LSJ
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
NEW BUILDING SITES
Grounds
4 areas terraced at new building site.
Complete
Cleared Area Seeding Seed has been ordered. Larry has purchased small hand seeder.
Expected in LSJ Sept 27.
9/27
Slatted House
Daniel R plans sent to Cimmaron Builders and Steve Roberts
for pricing. Cimmaron Builders estimate of $45,500 submitted.
JE to advise. Steve Roberts (SR Builders) waiting for structural
engineer report before submitting quote.
JE
Deer
Miles to dart deer & build pen to place them in (cleared area).
JE requested top of hill or preferably, by the beach office where
the picnic tables were. Miles is concerned with how deer will
be fed / supplied water if placed by beach office. Miles to
discuss with JE. Permit requirements to be determined.
JE / Miles
TECHNOLOGY/
MISC
Networking
Room 2 cable pulled through. Final network drops & wireless
access points installed.
Complete
Curtains — Beach
Office
New white gauze curtains to be purchased.
has arranged
purchase of material.
Chaise Lounge /
Furniture - MH
Chaise Lounge - Pinto to decide on furniture.
5
EFTA00577542
ESTATE PROGRESS REPORT — September 26, 2003
LSJ
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Plastic Pots
JE wanted plastic pots from the Conran Shop. Can be ordered
& can arrive in 2 months. Cost is $625 ea. JE to advise.
JE
Redecoration
1. Wicker furniture options — Pinto / Daniel R to handle.
2. Chosen towel rack forwarded to Daniel R with instructions to
order 5.
FYI: followed up to get delivery dates on items sent to DR to
purchase Sept 15. DR office said that the items would be
ordered week of Sept 22.
Radio on LSJ for St.
John Rescue
As per P Hoffman, JE approved St. John Rescue's request of
permission to install a radio inside a building on LSJ. This
approval is subject to a liability review by P Hoffman.
P Hoffinan
Island Grill
Miles to figure out if Viking outdoor grill is feasible for Tiki
houses.
Miles
6
EFTA00577543
ESTATE PROGRESS REPORT — September 26, 2003
LSJ
FOR GM EYES ONLY
LSJ
MISCELLANEOUS
Lookout House
Approved. Replace bedspread.
Tiki House
Two arm chairs and foot stools - awaiting quotes to recover.
Fabric? JEE attached quote.
Two extra sets of chair cushions. Quote: $40.00 per set. GM
to approve.
GM /
Cathy
Yellow House
1. Make a headboard.
2. Cover with same fabric as bedspread. Headboard to go to St.
John for covering.
Woodshop
Cathy
10/15
Complete
7
EFTA00577544
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00577538.pdf |
| File Size | 384.5 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 7,355 characters |
| Indexed | 2026-02-11T22:48:32.366848 |