EFTA00577633.pdf
PDF Source (No Download)
Extracted Text (OCR)
PARIS
STATUS
ITEM
COMMENT
4 Update
1. AC in master bedroom. Air
volume to be increased and
diffusers to be changed.
i)
Diffusers will begin installation 15 April.
Serge was told the AC does not heat the room below 72
degrees. In conjunction with the new apartment, the air
conditioner in the MBR will be looked into.
+ Update
2. Oxygen supply
ii)
Completed.
+ NC
3. Photos for living room
iii)
is printing photographs.
+ NC
4. Boudoir Add Rug.
iv)
Rug being made, expected end of May
+ NC
5. AC in Kitchen
v)
To be reviewed at the time as the AC in the new apt.
4 Update
6. Wireless System
vi)
2 Linksys wireless routers (French Versions) and a
wireless adapter for the desktop computer from a French
supplier will be delivered April 25.
+ Update
7. Front Gate New key system
vii)
Awaiting decision - building meeting on April 25'h.
+ Update
8. Chandelier in the bathroom
viii) Has been hung. Piece to hide wires expected end of June.
+ NC
9. Horseshoe Table/Ash Tray
ix)
Horseshoe table expected end of April.
1
EFTA00577633
STATUS
ITEM
COMMENT
Update
10. Change Windows
Winter
before
x)
Windows installation expected to commence 15 April and
will take two weeks to complete.
+ Update
11. Shower Pump
xi)
Hope to have a date by week ending April 18 to when it
will be replaced.
2
EFTA00577634
PALM BEACH
STATUS
ITEM
COMMENT
+ Update
+ JE Plse advise
1.
Landscape Lighting
i)
Complete. Is JE happy with it?
+ Update
2.
Furniture for Paula Epstein
ii)
Triconfort furniture will be delivered April 17.
+ Update
3.
Triconfort Cushions
iii)
Ordered new cushions, expected delivery April 17.
+ Update
+ JE Plse advise
4.
5.
Revamping
the
back
entrance
iv)
Completed. Is JE happy with it? If JE is happy, should we
proceed with firing Alan Stopek and hire Jerome or
should Alan Stopek do more work in the back entrance?
+ Update
Pool
v)
Loss of water has been reduced from two inches to half
an inch per day. Seepage area by left side to be addressed
on April 15.
+ Update
+ JE Plse advise
6.
Front Gate Pillars
vi)
Plants have been installed on top of pillars. IS JE happy
with it?
ON HOLD
7.
Auto Hurricane Shutters
for Remaining Sections of
House
vii)
JE said not to do anything at this time with the shutters.
+ NC
3
EFTA00577635
STATUS
ITEM
COMMENT
+ Update
REDECORATION OF HOUSE
8.
Schedule from Pinto
viii) Project Solutions is expected to deliver the updated
interior plans to Pascal on April 14th. Pascal said they
would have a new project to show JE by end of June.
Work to commence beginning of Sept.
4
EFTA00577636
457 MADISON
STATUS
ITEM
COMMENT
> NC
1.
Decorator for JE office
i)
Bastion supplied JE with info on proposed concept,
and JE is considering proposal.
+
+
NC
JE plse advise
2.
Darren's Office to buy new
furniture
ii)
JE wanted new furniture. GM to purchase new desk &
cabinets for
area & conference table & look
at dividing unit for
& Darren.
+ JE Please
advise
3.
Directory Update
iii)
JE to approve.
+ Update
4.
New LSJ Model and 2x3
replica
iv)
New Large Model and 2x3 replica has been delivered
to 71st.
Additional small model was sent to Les
Wexner.
+ Update
5.
Body Cast oft
v)
Deposit for materials given to Anne Potter.
5
EFTA00577637
65TH STREET
STATUS
ITEM
COMMENT
+ Update
1. Office Extension
i)
Doug has resubmited a new drawing.
Awaiting
approval from Building, Planning and Zoning.
Expected May 2.
+ Update
2. Fender
ii)
Fender expected April 18.
+ Update
3. Lamps
iii)
Parts will arrive April 21 and will be completed by
April 25'1'. Lamps are currently at 65'h.
+ Update
4. AC Switch MBR and office
iv)
Parts will be in April 15. Will be installed by April 21
6
EFTA00577638
71ST STREET
STATUS
ITEM
COMMENT
+
+
Update
Plse see
attached quotes
1.
Elect. Eng. Layout &
Lighting Dsn and CAD Svc
i)
National States Electric Quote: Cost not to exceed
$22.5K — invoice hourly basis.
Jusler Electric Quote: $28.5K Still only a verbal
quote.
+
+
+
Update
Plse see
attached quotes
JE plse advise
2.
Surveillance Cameras 3rd
Fir
ii)
GSI Quote: $14.5K
Security Products Quote: $16.7K
Rick suggests having an option ability to lock down
whole 3rd floor living quarters from the rest of house.
+
+
+
Update
JE plse advise
Plse see
attachment
3.
Upgrade of Landis System
iii)
Upgrade to latest technology quote $22.6K.
Steven recommends immediate action should be
to build a back up Windows 95 computer incase
of a hard drive failure. Total upgrade should be
done in 2004.
+
+
Update
Plse see
attached quotes
4.
Antennae Company
iv)
Sawyers
quote
for
repeater
system
$16.7K.
Competive bid by ESCC due April 22.
7
EFTA00577639
DECORATING
STATUS
ITEM
COMMENT
+ Update
+ Plse see
attached quotes
+ JE plse advise
5.
Converting part of
basement into staff quarters
v)
Michael Borrico — Option 1:$96K
Option 2:$189K
Brian Kelley —
Option 1: $98K
Option 2: $196K
+ Update
6.
Redecoration of living
room and MBR
vi)
Permit approval brings us to a possible start date of 23
June. Awaiting storage bids by April 30.
8
EFTA00577640
PLANES
STATUS
ITEM
COMMENT
+ Update
1. GIIB Iridium Blending to
Aircell
ii)
Iridium boxes have arrived at JA PBI for SatCom upgrade -
Complete
21/2 — Larry would like to install an AirCell / Iridium handset
in cockpit of GIIB, for crew usage during en-route changes
and logistics, wiring is already there, it would only require
purchasing and mounting handset = $2,952.00 complete, no
additional down time - Complete
) Plse advise
2. 727 Shower
iii) Aerosky three proposals submitted to JE.
3. 727 Office Chair
iv) JE approved Foam cut. Awaiting material selection by JE.
4. G2B
v)
April 13 G2B will go to Millville NJ and return to Teterboro
Aril 15 in the eve to have Number 1 en ine chanted.
9
EFTA00577641
STAFF
STATUS
ITEM
COMMENT
+
NC
JE plse advise
1. Helicopter Pilot — Nicholas
i) He is interested in the position. Nicolas sd that until the
summer he would be busy with the Navy contract, and so he
could look after the helicopter and fly it. He has one assignment
for the navy in Jan for a week. Nicolas also sd that he had lots
of holiday due to him which he could apply for and use his
holiday time to work for JE.
+ NC
2. Bill Hammond
ii)
JE said that he would contact directly.
+ NC
3. Pilot Search
iii) Larry has advised he will wait for a decision on Bill
Hammond before contacting a pilot headhunter.
+ JE plse advise
4. Rick Harrington
iv) Employment status since Brazil trip is now over.
10
EFTA00577642
ZORRO RANCH
STATUS
ITEM
COMMENT
Update
1. Pew
i)
Complete — pews have been painted.
4
+
Update
2. Security Gate
ii)
Cameras and placement are approved. Completion
expected end of April.
NC
3. Fountain
iii)
Additional more complete dimensions sent to Pascal
Correct quantity of tiles = 1,631 tiles.
Attached is the proposal, please advise.
Drawings expected by Pascal April 25.
+ NC
4. Plumbing in Shed.
iv)
Miller Bonded have completed their project until the
power is turned on in April/May.
4 Update
5. Building for RO
v)
Ionics installation is scheduled by May 9th.
+ Update
6. MH Trees
vi) Complete.
+ NC
7. 40 Ft Digital Screen
vii)
JE still to advise on proposal received from Larry
Jacobson for cinema and drive-in.
4 Update
8.
Main House lutron system
not working properly.
viii) Completed.
4
4
NC
JE to advise
9.
Repeaters for MH
Cell hone & Radio
ix) Repeater costs $4K.
Installation $11K.
Will be
compatible to Nextel.
11
EFTA00577643
STATUS
ITEM
COMMENT
+ Plse see
attached quote
Coverage
4 Update
10. Repair crack in kitchen tiles
x)
Custom tiles will be delivered by April 21.
+ NC
11. Water Rights
12. Phase Power/Water Well
xi)
Shannon has received notice for the Dakota well
application from the Office of the State Engineer.
Approximately one half of the power line installation
has been completed.
4 Update
13. "Z" to be lit up.
xii) Approval given. Special light was ordered to resist
wind. To be delivered May 1.
4 Update
14. Boulders
xiii) Approval from JE given to shine the boulders from the
front. Quote expected April 18.
12
EFTA00577644
LITTLE ST. JEFF'S
STATUS
ITEM
COMMENT
+ NC
I. Fixed Roof Yoga Deck
i)
Awaiting permits. Miles understands that there has been no
movement with finalizing this project.
+ Update
2. Telephone system
ii)
Telephone system. The low audio is caused by static and
water in the lines and Vitelco, USVI cable and telephone
provider, is working on the problem. No deadlines given.
+
+
NC
JE to advise
3. Flags from LA
iii)
Poles and flags have arrived and are on LSJ. JE to advise on
placement.
+ Update
4. Sea Water Pump
Pond Pump
iv)
Miles corrected the problem with pvc piping and some
couplings.
+ Update
5. Large Beach House
Electricity
v)
Complete.
+ NC
6. Maintenance & Storage Shed vi)
Check received and passed onto FTC for depositing.
+ Update
7. Shotgun
vii)
Completed. Shotgun has been delivered.
+ NC
8. New House Building Site
viii) Permits for Yoga deck, pool house, new house building site,
steam room etc. Miles understands that there has been no
movement with finalizing this project.
+ NC
9.
Cart Paths Reduce Grades
ix)
Awaiting lawyer's letter by end of April.
13
EFTA00577645
STATUS
ITEM
COMMENT
Update
+ NC
+ NC
10. Dock & Dock Lights
Extra Pilings for Dock
Floating Dock
x)
Installation has begun. Expected completion April 30.
xi)
Pilings are in place. Moulds are on island and these will be
cast as soon as possible in the New Year.
xii)
Project on hold until CCM permit inspection is completed.
xiii) Once the new pilings are cast, the floating dock will be re-
built to fit between the hard dock and the new pilings to
provide a swimming platform.
To be reconfigured as a permanent dock with
swim ladders, railings etc. This is due to happen
once the CCM permit inspection is complete.
+ Update
11. Plant Planters
xiv) Suppliers have been located. Examples will be given next
week. Awaiting delivery delays on different models.
+ NC
12. Poolhouse by Existing Pool
xv)
Permits for Yoga deck, pool house, new house building site,
steam room etc. Miles understands that there has being no
movement with finalizing this project.
+ Update
13. Lamps & Lanterns
xvi) Lamp and lanterns examples are being presented to JE. Final
choices to be determined.
+ JE plse advise
14. Main House Outside Lights
xvii) JE to advise during visit.
+ Update
15. Steam Room
xviii) Power quote to arrive April 14.
+ Update
16. Roll on/Roll off Truck
xix) Items to purchase. Truck and bins are operational. First bin is
on island. Miles would like to propose a full maintenance,
storage and delivery proposal that would cost $1500.00 per
14
EFTA00577646
STATUS
ITEM
COMMENT
month but is setup to ensure that the truck and bins are well
looked after. The proposal is with the company that provides
us with barging services. The monthly cost is on a par with
the previous bin provider when bin rental, barging, storage,
trucking to the dump etc is taken into consideration. Please
advise.
SG agrees and negotiated the price down to this
amount.
+ Update
17. Replace AC Units in Guest
Rooms
xx)
Completed.
+ Update
18. New Development
Beach entrance and new
road to main house.
xxi) C Miller to provide update.
xxii) The road works are completed and await JE approval.
Landscaping is subject to JE approval.
+ Update
19. Tiles for Beach Hut
xxiii) Will be installed by April 25th.
+ Update
+ Update
f•Itc,
20. Seamore, Nanna, Fat Cat &
Lady G2
xxiv) Nanna - Is operational.
Fat Cat — Strengthening of bulkhead and interior is
currently being worked on. Yamaha are not going to
release a 300hp engine. Mercury 300 CFI is now
believed to be the best motor on the market. Quote to
replace Yamaha to Mercury given to JE awaiting
approval.
Seamore — Under repair. fuel injection pump is out.
15
EFTA00577647
STATUS
ITEM
COMMENT
4 Update
Lady G2 — Engine has been shipped back to the states
for credit using new reduced rate freight forwarder
recommended by SG. Larry is purchasing four stroke
engine. Awaiting delivery from Fla.
> NC
21. New Office area below
MBR
xxv) Permits for Yoga deck, pool house, new house building site,
steam room etc. Miles understands that there has been no
movement with finalizing this project.
+ Update
22. MBR Curtain Rod
xxvi) Completed.
+ NC
23. Great Room wind
Protection Panels
xxvii) JE requested that 4 panels be constructed to fit in the 4
arches to stop the wind and rain from entering the patio on
the South east portion of the room facing St. John. Outside
contractors have supplied a quote of $36000.00 to complete
this project as maintenance staff too busy to complete.
+ NC
24. Wildflowers Jasmine &
Sweet Smelling Plants
xxviii) Flowers.
Gardenias are growing.
Jasmines will be
planted after the gym is completed.
+ NC
26. Wind Generator
xxix) Mr. Epstein has placed positioning on hold.
+ NC
27. Poly Pavement Dust
Prevention
xxx) Process on hold whilst gym is being erected. Miles continues
to spray roads with water to ease dust levels.
+ Update
28. New Main House Approach
Road
xxxi)
Has been widened for safety.
+ Update
29. Stone work on Road Sides
xxxii) Complete
16
EFTA00577648
STATUS
ITEM
COMMENT
30. Irrigation
xxxiii) SG has negotiated new pricing with over +/-15% discount
and additional 10% if invoice is paid within 30 days.
Awaiting new quote by April 14.
17
EFTA00577649
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA00577633.pdf |
| File Size | 738.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 13,779 characters |
| Indexed | 2026-02-11T22:48:33.027098 |