FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
PARIS
STATUS
ITEM
COMMENT
+ NC
1. Change fat lady painting frame
i)
11/10 — Chaser sent to Jean for date.
+ Update
+ GM update
2. AC in master bedroom — JE says
thermostat is broken — a/c cuts
off after 30 mins
ii)
AC has been left on at the coldest temp. throughout apt
since JE left as a/c co. sd problem was because the a/c was
switched on and off.. AC Co. will test on Monday 14 Oct to
measure temp. and advise further.
+ NC
3. Rolling Cart
iii) 4 Oct - Has arrived at 71s' — will go on plane on next trip to
Paris
+ NC
4. Safe
iv) Pinto is purchasing and installing 4 Nov.
+ Update
+ GM update
5. Hang B/W pies - MBR loo &
boudoir loo
v)
Valdson has hung pictures. Can't email pies as card readers
malfunctioning. Pics expected Mon 14'h after computer
repaired
+ Update
+ GM update
6. Computer — New Card Readers
for JE computer / Update anti
virus
vi) Computer guy updating virus & installing readers on
Monday 14 Oct.
* NC
7. Raise globe desk
vii) 11/10 - Chaser sent to Jean for date.
viii)
+
+
8.
+ Update
9. Photos for Apt
ix) Two 8 x 10 — complete
x)
One 12 x 8 — complete
xi) Eleven 11 x 151/2 (h) — 3 complete
EFTA00577780
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
xii) Seven 11 x 151/2 (v) — 5 complete
xiii) Nine 834 x 13 — not started
xiv) Three 71/4 x 101/4 - not started
+ NC - old apt
10.Metal door @ entrance - JE
wants a door code
xv) Building to meet to discuss
+ NC
+
11.Paint Boudoir walls and loo +
change carpet
xvi) Chaser sent to Jean
+ NC
+
Light Chinese tapestry
xvii) Chaser sent to Jean
+
First aid
This is to be found .....
EFTA00577781
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
NEW PARIS APT
STATUS
ITEM
COMMENT
+ NC
+
12.JE wants schedule for work — inc
layout, construction and
decoration
xviii) Proposal from Pinto expected 15 Nov
+ Update
+
+
13.Change Windows before Winter
xix) Serge advises bill for work due at Pinto's office Wed 16
Oct — Serge needs to approve first - windows will take 8
wks from approval
+ Update
+
14.5 x B/W pictures for Gym
xx) Printed, framed at 65111— ready next trip to Paris.
+ Update
+
1. True Bike Shock Absorbers
v)
Ones that were purchased for Zorro will be sent to Paris
and new ones will be bought for Zorro.
+
+
15.
+ Plse advise
+ GM talk to ETC/Nick
what is current story
16.Gates
iv) All gate/door intercoms currently connected to door buzzers.
NS suggests that this be changed to ring on staff telephone
line? JE plse ok if approved.
EFTA00577782
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
PALM BEACH
STATUS
ITEM
COMMENT
4 NC
17.Automatic Hurricane Shutters
for Remaining Sections of House
i) Quote attached = $10,850.00.
All guest room shutters and small loo shutters are manual.
JE sd not to do anything at this time
+ Update
18.Wall
ii) Amber is currently ill and has started to paint the fence and
wall betty. staff house and kitchen. She will continue when
she is well again.
+ Plse advise
+ GM talk to ETC/Nick
what is current story
19.Gates
iv) All gate/door intercoms currently connected to door buzzers.
NS suggests that this be changed to ring on staff telephone
line? JE plse ok if approved.
4 NC
20.Stone dock steps
JE to advise
+ Update
21.Sale of Mercedes
Ad still running — no offers.
+ Update
+ Talk to Rich
22.A/C
iii) Large fan arrived and other spare parts.
update
First Aid
Can be found in the cupboard in the downstairs powder
room. Defibrilator and additional first aid will arrive
+ Update
2. Pot plants
i) GM Call Stopek
4 Update
Frame and hang picture in Garden
EFTA00577783
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
room + frame and hang orher pic of
Zorro
EFTA00577784
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
457 MADISON
STATUS
ITEM
COMMENT
+ Update
1. Decorator for JE office
i) Bastion supplied JE with info on proposed concept, and JE is
considering proposal.
EFTA00577785
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
301 EAST 66TH
301 EAST 66TH
STATUS
ITEM
COMMENT
+ Update
1.When do we get new apt — Size
i).
EFTA00577786
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
EFTA00577787
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
KINNERTON STREET
STATUS
ITEM
COMMENT
+ NC
1. Painting of wall below trompe
I'oeil
i) Painter will try and fit in around other jobs — no date set.
EFTA00577788
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
65TH STREET
STATUS
ITEM
COMMENT
+ Update
1. Security Products installation
i) Installation will take place Tuesday 15th October.
+ NC
2. Original broken Air-Conditioner
in Office
ii) Has been removed and vents will be installed in existing
duct to ventilate office — By end of Nov Rich will complete.
+ Update
hang picture frames and minors
i) Installation will take place Tuesday 15th October.
+ NC
3. Canvass to replace Kline
iii) Has been removed and vents will be installed in existing
duct to ventilate office — By end of Nov Rich will complete.
+ NC
4. Report on adding extension
iv) Has been removed and vents will be installed in existing
duct to ventilate office — By end of Nov Rich will complete.
EFTA00577789
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STAFF
STATUS
ITEM
COMMENT
+ Update
1. Michael Lifman
i) He will be traveling back from SA to NY with NS and ES
on the 5th
November — JE wants to know where he will be
living
+ Update
2. Wiwid & Purni
v) Letter has been done inviting them to the States and we are
looking into flights for arrival in the States during the first
week of November.
+ Update
5. Patrick — Evelyn's boyfriend
iii) He will be flying from France to Miami on the 16 Oct with
provisional return date of 15 Nov. Evelyn will travel to West
Palm Beach on 16 Oct.
+ Update
6. Rick Harrington
vi) NS showed Rick around 65th and 71st except for 3th & 4th JE
was in house) and he has Larry V's cellphone # & will
discuss plane security with him week of 15th Oct. Rick
going Zorro week of 15 Oct.
> V 1 1
7. Richard
(v) Richard needs to travel to Zorro to do checks and
preventative maintenance at MH. NS advises that Richard
travels when JE leaves for LA and Hawaii.
EFTA00577790
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
71ST STREET
STATUS
ITEM
COMMENT
+ Update
1. Front Door
i)
The exterior & interior of door expected completion due
18d' Oct — weather permitting.
+ Update
3. Safe Room Bolt
ii)
NS has consulted with Bob Oatman & Charles Miller & a
recommended company will be attending at 71g (early
week of 15th Oct) to view and then install further internal
turn bolt and locking devices — installation date to be
advised.
+ Update
4. Safe room keypad
iii) Installation expected week of 21 Oct.
+ Plse advise
+ JE sd no
5. Security DSL Line
iv) This is going to be hooked up 18th October — JE to advise
if Richard to be able to access survey cameras from his
home computer.
+ Update
+ Remove
6. True Bike Shock Absorbers
v)
These have been replaced and an extra set has been
purchased for the bike at Zorro — Richard will take with
him to Zorro and install.
+ Update
7. Control Boards for Exhaust
System
vi) Purchased - will be installed by 16th October.
+ NC
+ This should be under a sub heading of decoration on
same page
8. Coloured Boards for entryway
vii) No update from Pinto.
4 Update
9. Lighting
viii) NS is meeting with Charles, Bill Bigelow and David
EFTA00577791
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
Wilbourne (Rockwell Group) on 15th Oct to review and
revise lighting contract.
4 Update
10. Converting part of basment in to
staff quarters
vi) Purchased - will be installed by 16th October.
EFTA00577792
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
ZORRO RANCH
STATUS
ITEM
COMMENT
+ Update
1. Pew
i)
Delayed due to front gate - pews will start 8 Oct.
4 Update
2. Water Pump
ii)
Still awaiting delivery of pitless adaptor — expected
delivery 22 Oct.
4 Plse advise
3. Security Gate
iii)
iv)
Front entrance complete - Shannon is awaiting approval to
proceed with gate & cameras.
NS has requested Rick Harrington to look into the security
quote received when he is at Zorro.
4 NC
4. Entry Gate
v)
JE will decide when he gets to Zorro height of lights
+ NC
5. Fountain
vi) 3/10 - GM faxed Pascal to come up with new design.
+ Update
6. Map
vii) Revised rough draft by 28th Oct.
+ Update
7. T1 Lines
viii)
ix)
Voicelines working.
Delay in data lines to 29 Oct.
4 Update
8. Medical Training
x)
Set up for November 9th as only date available in Oct
clashes with JE visit to ranch.
husband to give
medical training course for all staff prior to visit.
EFTA00577793
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
+ Update
9. Survey
xi) All easements were resent to all families 10 Oct as Darren
made changes.
4 Update
10. Electricity Plumbing
xii) Miller Bonded have started the piping in the water pump
building — completion expected 15 Dec.
xiii)
+ Update
11. Building for RO
xiii) Building is up and new door (to replace wrong door
previously sent) should arrive 15 Oct.
4 Update
12. Guest vehicle for ranch
ix) Larry is investigating a Mercedes Sprinter as per JE request
and is awaiting Mercedes dealer to respond.
+ Plse advise
+ GM to call
13. MH Trees
x)
A few trees have died. Approx cost is $2000.00 (rental of
came labour to dig and replant) to transplant 5 pinons
(taken form ranch) to replace. JE sd yes to above — will
start JE wants price to transplant 50
)- Plse advise
14. 40 Ft Digital Screen
xi) NS contacted Larry Jacobson (President) of Theatre
Resource Group. JE advised NS that he would like
conference call betw. JE, NS & Larry J. Lesley to advise
NS when JE will be available for conference call.
► Plse advise
14. First aid kits
xi) Are located
1.
EFTA00577794
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
LITTLE ST. JEFFS
STATUS
ITEM
COMMENT
+ Plse advise
+ GM talk Miles
1. Yoga Deck
i)
JE sd fixed roof -.
+ NC
2. Floating Dock
ii) Floats and hardware on island. Fabrication to commence once
new dock complete — on hold woodshop concentrating on
new gym & heli hut.
+ NC
3. Lookout House (Blue) Retaining
Wall
iii) On hold — woodshop concentrating on new gym & heli hut.
+ NC
4. Build Side screen MBR & Move
Steps
iv) On hold — woodshop concentrating on new gym & heli hut
+ NC
5. Plexiglass Weave Experiment
v) On hold — woodshop concentrating on new gym & heli hut
+ Update
6. Telephone System
vi) Telephone company on strike and not doing any new work —
system to be digitized once strike is over.
+ Update
7. Bali Shipment
vii) Now expected delivery date is end-Oct.- Boat somewhere on
the ocean — no further up[date from co. available
+ Please advise
8. Bamboo Flagpoles
viii) JE sd to purchase material. Material ordered expected
delivery.
+ Update
9. Sea Life Paintings
x) Ongoing — Lady has been off island ill and will be returning
EFTA00577795
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
to LSJ Tuesday 15 Oct to continue.
+ NC
10.
Glass Garage Type Doors
xi) On hold — woodshop concentrating on new gym and heli hut.
+ Update
11. Sea Water Pump
xii) Catalogue not sent by supplier was requested to send ASAP.
xiii)Supplier proving to be unreliable & Miles requested
assistance from John Savage who will provide alternative
suppliers. No date given.
+ Please advise.
+ Cm to unerstand
12. Wind Generator / Large Beach
House
xiv)
Quote to supply electricity, distribution boards and
circuited for the beach house will cost $15,900.00 — see
attached "A*". JE to please advise.
> NC
13. Maintenance & Storage Shed
xiv) Shed is on order and delivery of building expected 1
Nov. Miles received no drawings yet. Paul Kelly has
promised Miles design — no date given.
xv)
.* NC
14.Poly Pavement Dust Prevention
xvi)Process on hold whilst gym is being erected. Miles continues
to spray roads with water to ease dust levels.
> Update
15.Music Systems / Electrical Cars
xvii)
Installation for Car # 2 complete.
xviii)
Awaiting spare parts from Ford to rework electrics on
Car # 3 —
backordered and expected on island 31 Oct.
Miles told to call regional head of Ford
+ Update
16. Car Seat Covers
xix)
Covers still not complete and new deadline of 31 Oct
EFTA00577796
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
given.
+ NC
17. Puppies
xx)
Puppies in Ohio until 18 Nov for house training.
+ NC
18. Parrot at Entrance
xxi)
On hold — woodshop concentrating on new gym & heli
hut.
+ Update
19. Shotgun
xxii)
Application submitted - expected 10 Nov.
+ Update
20. Mosquitoes / Sandflies
xxiii)
Dan Ariaz will be traveling to LSJ 15th — 18'h Oct — will
submit proposal post visit.
+ Please advise
21. Dock
xxiv)
Old dock has been demolished & work has started on
setting out new dock.
xxv)
Decking material with Florida suppliers — expected 23
Oct
xxvi)
Fenders — Miles supplied manufacturer with specs per
plans.
xxvii) Quote - "Fend Off Fenders" has submitted quote for 540
linear feet (stock in hand) with exception of fender
corners (out of stock) but should not take too long to
make up. Have white & black colour not UV protected
and the black leaves marks. Grey is UV protected and
mark free which is advised colour. Arrives pre-drilled
with stainless steel fittings. Approx Cost = $14,500.00.
JE to plse confirm if in order. In two wks company
attending at Fort Lauderdale boat show and stock in
hand may be sold out.
EFTA00577797
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
+ Update
22. Boat
xxvii) 48 Foot high speed catamaran that Larry dealing with has
been sold.
+ Update
23. Helicopter Shelter
xxviii) Stoning work continues, interior tiling complete.
Construction of roof commenced — pictures attached.
+ Update
24. New House Building Site
xxix)
Architects have visited the site & will put proposal
forward for permitting etc — no date.
+ NC
25. Cart Paths reduce grades
xxx)
Project to start once earthmoving machinery on island -
dependent on permits.
+ NC
26.
Poolhouse
xxxi)
Construction to commence in new year
+ Update
27. Plant Planters
xxxii) Supplier in Puerto Rico has pots = 42 inches high. Miles
requested sample for JE approval — expected 25 Oct.
+ Update &
Complete
28. Master Bedroom Urinal
xxxiii) Removed - wall & plumbing made good.
+ NC
29. Main House Maintenance
xxxiv) Ongoing — one carpenter assigned all MH tasks.
+ Please advise
30. Stuart Fallbright
xxxv)
50% complete — continuing work. No completion date.
xxxvi) New plants from Florida — 50% been planted. No
completion date.
xxxvii) JE sd Stuart can stay as long as he likes _ He will stay
Until
EFTA00577798
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
+ Please advise
32.New Gym
xxxviii) Slab poured, block work commenced — see pictures
attached.
xxxix) Special order for doors / windows in hand — expected
delivery 1 Nov.
xl)
Electrical upgrade = $7,500.00 — "A**"
AC Unit & Installation = $11,295.00 — "B"
Quotes attached — JE to please confirm if in order.
xli)
Miles received new roof line and permit updates from
Kevin today (11/10) but has not had time to review them.
+ Update
33. Main House Outside Lights
xlii) Diagrams & pictures supplied to GM who has progressed
to requesting Miles come up with fastened cover to prevent
water from entering receptacle, copy also given to Richard.
* Update
34. Steam Room
xliii) Stand alone electric generator = $12,000.00
Upgrade LSJ power sources & run new cables =
$110,000.00 —
attached quote "C"
xliv) 1/10 — Miles submitted website for pre-fabricated unit to
JE.
Website: steamandsauna.com NS spoke with Charles &
Charles will come up with suggestions.
> Update
35. Items to Purchase
xlv) First Aid/Ambulance — expected delivery 18 Oct
xlvi) Gardening Equipment — arrived at LSJ 11 Oct
EFTA00577799
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
+ Update &
Complete
36. MBR Curtain Rod
xlvii) 7 ft curtain rod installed 10 ft from floor on inner wall.
+ Please advise
37. Replace AC Units in Guest
Rooms
xlviii) Quotes to replace all guest AC units (3) = $6,585.00 — see
attached "D" - JE to please confirm if in order
+ Update
38. Irrigation
xlix) Report received — sent to Charles & forwarded to Madison
Cox, copied to JE & NS. Quoted = $930,000.00
+ Update
40. Pond Clear / Algae Eater
1)
Company Miles was dealing with has gone bankrupt —
investigating alternate company. ES sent Miles alternative
& Miles will contact. NS also contacted Alan Stopec for his
advice.
+ Update
41. Dock Light
li)
Ed Tuttle was not consulted on dock light and Charles has
now sent memo to Tuttle requesting manufacturer details.
+ NC
42. Permits
Iii)
No progress to report — ongoing.
+ Update
43. New Development
liii)
Generator for new building — Paul Gandy sourcing correct
generators.
liv)
Paul Gandy drawing up bubble diagram of site utilities &
building - submitting to Ed Tuttle to design.
Iv)
11/10 - Letter of credit sent and received by Pirelli.
lvi)
Cable ready for factory testing betw. 30 Oct and 8 Nov. NS
will speak to Charles re having somebody attend the
EFTA00577800
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
testing.
lvii) Conference call held 7 Oct betw. Darren, Paul Gandy &
others w.r.t. conflicting information — Paul Gandy was
supposed to have memo sent to Darren w.r.t what was
excluded and what needs to be included in the cable
installation proposal. Due to be received by Darren today
(11/10) and on second conference call today 11/10 betw
NS, Darren & Paul Gandy, Paul advised he had
misunderstood and assured us that he would send the memo
to Darren on Monday 14 Oct.
********************
EFTA00577801
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA00577780.pdf |
| File Size | 982.5 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 17,937 characters |
| Indexed | 2026-02-11T22:48:34.552794 |