FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
OLD PARIS APT.
STATUS
ITEM
COMMENT
+ NC
1. Change fat lady painting frame
i)
11/10 — Chaser sent to Jean for date.
+ Update
+ GM update
2. AC in master bedroom — JE says
thermostat is broken — a/c cuts
off after 30 mins
ii)
AC has been left on at the coldest temp. throughout apt
since JE left as a/c co. sd problem was because the a/c was
switched on and off.. AC Co. will test on Monday 14 Oct to
measure temp. and advise further.
+ NC
3. Rolling Cart
iii) 4 Oct - Has arrived at 71s' — will go on plane on next trip to
Paris
+ NC
4. Safe
iv) Pinto is purchasing and installing 4 Nov.
+ Update
+ GM update
5. Hang B/W pies - MBR loo &
boudoir loo
v)
Valdson has hung pictures. Can't email pies as card readers
malfunctioning. Pics expected Mon 14'h after computer
repaired
+ Update
+ GM update
6. Computer — New Card Readers
for JE computer / Update anti
virus
vi) Computer guy updating virus & installing readers on
Monday 14 Oct.
+ NC
7. Raise globe desk
vii) 11/10 - Chaser sent to Jean for date.
+ Update
8. Photos for Apt
viii) Two 8 x 10 — complete
ix) One 12 x 8 — complete
x)
Eleven 11 x 151/2 (h)— 3 complete
EFTA00577802
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
xi) Seven 11 x 151/2 (v) — 5 complete
xii) Nine 834 x 13 — not started
xiii) Three 71/4 x 101/4 - not started
+ NC — old apt
9. Metal door @ entrance - JE
wants a door code
xiv) Building to meet to discuss
+ NC
10.Paint Boudoir walls and loo +
change carpet
xv) Chaser sent to Jean
+ NC
11. Light Chinese tapestry
xvi) Chaser sent to Jean
+
12. First aid
xvii) This is to be found .....
+ NC
11.Broken glass door in Boudoir
xvii) 11/10 - Chaser sent to Jean for date.
+ NC
12.Add telephone book to car
xviii) 11/10
+ NC
13.4 sets of MBR sheets
xix) Purchased at 71st ready for next flight to Paris
NEW PARIS APT
STATUS
ITEM
COMMENT
4 NC
13.JE wants schedule for work — inc
layout, construction and
decoration
xviii) Proposal from Pinto expected 15 Nov
EFTA00577803
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
+ Update
14.Change Windows before Winter
xix) Serge advises bill for work due at Pinto's office Wed 16
Oct — Serge needs to approve first - windows will take 8
wks from approval
+ Update
15.5 x B/W pictures for Gym
xx)
Printed, framed at 65d' — ready next trip to Paris.
+ Update
16. True Bike Shock Absorbers
xxi) Ones that were purchased for Zorro will be sent to Paris
and new ones will be bought for Zorro.
PALM BEACH
STATUS
ITEM
COMMENT
+ NC
1. Automatic Hurricane Shutters
for Remaining Sections of
House
i)
Quote attached = $10,850.00.
All guest room shutters and small loo shutters are manual.
JE sd not to do anything at this time
+ Update
2. Wall
ii)
is currently ill and has started to paint the fence and
wall betty. staff house and kitchen. She will continue when
she is well again.
+ Plse advise
+ GM talk to
ETC/Nick what is
current story
3. Gates
iii) All gate/door intercoms currently connected to door
buzzers. NS suggests that this be changed to ring on staff
telephone line? JE plse ok if approved.
EFTA00577804
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
+ NC
4. Stone dock steps
iv) JE to advise
+ Update
5. Sale of Mercedes
v)
Ad still running — no offers.
+ Update
+ Talk to Rich
6. A/C
vi) Large fan arrived and other spare parts.
+ Update
7. First Aid
vii) Can be found in the cupboard in the downstairs powder
room. Defibrilator and additional first aid will arrive.....
+ Update
8. Pot plants
viii) GM Call Stopek
+ Update
9. Frame and hang picture in
Garden room + frame and hang
orher pic of Zorro
+ Update
10. Large plastic pots
ix)
+ Update
11. Kitchen door sticking
x)
+ Update
Order new stationery
xi)
+ Update
What is the status of switch board
for phones
xii)
EFTA00577805
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
457 MADISON
STATUS
ITEM
COMMENT
+ Update
1. Decorator for JE office
i) Bastion supplied JE with info on proposed concept, and JE is
considering proposal.
+ Update
1.Send out letters to get update of
directory info
i).
+ Update
1 Clean up Other areas of office and
buy new furniture
i).
301 EAST 66TH
STATUS
ITEM
COMMENT
+ Update
1.When do we get new apt — Size
i).
KINNERTON STREET
STATUS
ITEM
COMMENT
+ NC
1. Painting of wall below trompe
l'oeil
i) Painter will try and fit in around other jobs — no date set.
EFTA00577806
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
65TH STREET
STATUS
ITEM
COMMENT
+ Update
1. Security Products installation
i) Installation will take place Tuesday I 5th October.
+ NC
2. Original broken Air-Conditioner
in Office
ii) Has been removed and vents will be installed in existing duct
to ventilate office — By end of Nov Rich will complete.
+ Update
3. Hang picture frames and mirrors iii) Installation will take place Tuesday 15th October.
+ NC
4. Canvas to replace Kline
iv) Delivery expected 25 Oct.
+ NC
5. Report on adding extension
v) Has been removed and vents will be installed in existing duct
to ventilate office — By end of Nov Rich will complete.
+ NC
6. Put blocks on my desk so that it
does not shut
vi)
EFTA00577807
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STAFF
STATUS
ITEM
COMMENT
+ Update
1. Michael Lifman
i) He will be traveling back from SA to NY with NS and ES on
the 5 Nov — JE wants to know where he will be living
+ Update
2. Wiwid & Purni
ii) Letter has been done inviting them to the States and we are
looking into flights for arrival in the States during the first
week of November.
+ Update
3. Patrick — Evelyn's boyfriend
iii) He will be flying from France to Miami on the 16 Oct with
provisional return date of 15 Nov. Evelyn will travel to West
Palm Beach on 16 Oct.
> Update
4. Rick Harrington
iv) NS showed Rick around 65th and 71st except for 3th & 4th JE
was in house) and he has Larry V's cellphone # & will
discuss plane security with him week of 15th Oct. Rick going
Zorro week of 15 Oct.
> u
I
5. Richard
v) Richard needs to travel to Zorro to do checks and
preventative maintenance at MH. NS advises that Richard
travels when JE leaves for LA and Hawaii.
EFTA00577808
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
71ST STREET
STATUS
ITEM
COMMENT
+ Update
1. Front Door
i)
The exterior & interior of door expected completion due
I8d' Oct — weather permitting.
+ Update
1. Safe Room Bolt
ii)
NS has consulted with Bob Oatman & Charles Miller & a
recommended company will be attending at 71st (early
week of 15th Oct) to view and then install further internal
turn bolt and locking devices - installation date to be
advised.
+ Update
2. Safe room keypad
iii) Installation expected week of 21 Oct.
+ Plse advise
+ JE sd no
3. Security DSL Line
iv) This is going to be hooked up 18th October - JE to advise
if Richard to be able to access survey cameras from his
home computer.
+ Update
4. True Bike Shock Absorbers
v)
These have been replaced
+ Update
5. Control Boards for Exhaust
System
vi) Purchased - will be installed by 16th October.
Update
6. Lighting
viii) NS is meeting with Charles, Bill Bigelow and David
Wilbourne (Rockwell Group) on 15th Oct to review and
revise lighting contract.
EFTA00577809
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
+ Update
7. Converting part of basement in
to staff quarters
DECORATING
+ NC
8. Coloured Boards for entryway
vii) No update from Pinto.
EFTA00577810
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
ZORRO RANCH
STATUS
ITEM
COMMENT
+ Update
1. Pew
i)
Delayed due to front gate - pews will start 8 Oct.
+ Update
2. Water Pump
ii)
Still awaiting delivery of pitless adaptor — expected
delivery 22 Oct.
+ Plse advise
3. Security Gate
iii)
iv)
Front entrance complete - Shannon is awaiting approval to
proceed with gate & cameras.
NS has requested Rick Harrington to look into the security
quote received when he is at Zorro.
+ NC
4. Entry Gate
v)
JE will decide when he gets to Zorro height of lights
+ NC
5. Fountain
vi)
3/10 - GM faxed Pascal to come up with new design.
+ Update
6. Map
vii) Revised rough draft by 28th Oct.
+ Update
7. T1 Lines
viii)
ix)
Voicelines working.
Delay in data lines to 29 Oct.
> Update
8. Medical Training
x)
Set up for November 9th as only date available in Oct
clashes with JE visit to ranch. Shannon's husband to give
medical training course for all staff prior to visit.
EFTA00577811
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
* Update
9. Survey
xi) All easements were resent to all families 10 Oct as Darren
made changes.
+ Update
10. Electricity Plumbing
xii) Miller Bonded have started the piping in the water pump
building — completion expected 15 Dec.
+ Update
11. Building for RO
xiii) Building is up and new door (to replace wrong door
previously sent) should arrive 15 Oct.
+ Update
12. Guest vehicle for ranch
ix)
Larry is investigating a Mercedes Sprinter as per JE request
and is awaiting Mercedes dealer to respond.
+ Plse advise
4
13. Transplant pinon trees
x)
A few trees have died. Approx cost is $2000.00 (rental of
came labour to dig and replant) to transplant 5 pinons
(taken form ranch) to replace. JE sd yes to above — JE
wants price to transplant 50 The cost to transplant 50 7-8
foot pinons: $25,200 plus tax Trees can be moved up until
March. Since the irrigation is cut down this time of year we
will have enough water this fall to irrigate the new trees.
Once the new well is up and running we will not have a
problem in the summer time. Plse advise
> Plse advise
14. 40 Ft Digital Screen
xi) NS contacted Larry Jacobson (President) of Theatre
Resource Group. JE advised NS that he would like
conference call betw. JE, NS & Larry J. Lesley to advise
NS when JE will be available for conference call.
EFTA00577812
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
+ Plse advise
15. First aid kits
xi) Are located
LITTLE ST. JEFFS
STATUS
ITEM
COMMENT
+ Plse advise
+ GM talk Miles
1. Yoga Deck
i) JE sd fixed roof -.
+ NC
2. Floating Dock
ii) Floats and hardware on island. Fabrication to commence once
new dock complete — on hold woodshop concentrating on new
gym & heli hut.
+ NC
3. Lookout House (Blue)
Retaining Wall
iii) On hold — woodshop concentrating on new gym & heli hut.
+ NC
4. Build Side screen MBR &
Move Steps
iv) On hold — woodshop concentrating on new gym & heli hut
+ NC
5. Plexiglass Weave Experiment
v) On hold — woodshop concentrating on new gym & heli hut
+ Update
6. Telephone System
vi) Telephone company on strike and not doing any new work —
EFTA00577813
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
system to be digitized once strike is over.
+ Update
7. Bali Shipment
vii) Now expected delivery date is end-Oct.- Boat somewhere on
the ocean — no further update from co. available
+ Please advise
8. Bamboo Flagpoles
viii) JE sd to purchase material. Material ordered expected
delivery.
+ Update
9. Sea Life Paintings
ix) Ongoing — Lady has been off island ill and will be returning
to LSJ Tuesday 15 Oct to continue.
+ NC
10. Glass Garage Type Doors
x)
On hold — woodshop concentrating on new gym and heli hut.
+ Update
11. Sea Water Pump
xi) Catalogue not sent by supplier - was requested to send
ASAP.
xii) Supplier proving to be unreliable & Miles requested
assistance from John Savage who will provide alternative
suppliers. No date given.
+ Please advise.
+ CM to
understand
12. Wind Generator / Large Beach
House
xiii) Quote to supply electricity, distribution boards and circuited
for the beach house will cost $15,900.00 - see attached
"A*". JE to please advise.
+ NC
13. Maintenance & Storage Shed
xiv) Shed is on order and delivery of building expected 1 Nov.
Miles received no drawings yet. Paul Kelly has promised
Miles design — no date given.
EFTA00577814
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
.* NC
14. Poly Pavement Dust Prevention
xv) Process on hold whilst gym is being erected. Miles continues
to spray roads with water to ease dust levels.
+ Update
15. Car Seat Covers
xvi) Covers still not complete and new deadline of 31 Oct given.
+ Update
16. Music Systems / Electrical Cars
xvii) Installation for Car # 2 complete.
xviii) Awaiting spare parts from Ford to rework electrics on Car #
3 — backordered and expected on island 31 Oct.
xix) Miles told to call regional head of Ford
+ NC
17. Puppies
xx)
Puppies in Ohio until 18 Nov for house training.
+ NC
18. Parrot at Entrance
xxi) On hold — woodshop concentrating on new gym & heli hut.
+ Update
19. Shotgun
xxii) Application submitted - expected 10 Nov.
+ Update
20. Mosquitoes / Sandflies
xxiii) Dan Ariaz will be traveling to LSJ 15th — 18th Oct — will
submit proposal post visit.
+ Update
21. Boat
xxiv) 48 Foot high speed catamaran that Larry dealing with has
been sold.
+ Update
22. Helicopter Shelter
xxv) Stoning
work
continues,
interior
tiling
complete.
EFTA00577815
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
Construction of roof commenced — pictures attached.
+ Update
23. New House Building Site
xxvi) Architects have visited the site & will put proposal forward
for permitting etc — no date.
+ NC
24. Poolhouse
xxvii) Construction to commence in new year
+ Please advise
25. Dock
xxviii) Old dock has been demolished & work has started on
setting out new dock.
xxix)
Decking material with Florida suppliers — expected 23
Oct
xxx)
Fenders — Miles supplied manufacturer with specs per
plans.
xxxi)
Quote - "Fend Off Fenders" has submitted quote for 540
linear feet (stock in hand) with exception of fender
corners (out of stock) but should not take too long to
make up. Have white & black colour not UV protected
and the black leaves marks. Grey is UV protected and
mark free which is advised colour. Arrives pre-drilled
with stainless steel fittings. Approx Cost = $14,500.00.
JE to plse confirm if in order. In two wks company
attending at Fort Lauderdale boat show and stock in hand
may be sold out.
EFTA00577816
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
+ NC
26. Cart Paths reduce grades
xxxii)
Project to start once earthmoving machinery on island —
dependent on permits.
+ Update
27. Plant Planters
xxxiii) Supplier in Puerto Rico has pots = 42 inches high. Miles
requested sample for JE approval — expected 25 Oct.
+ Update &
Complete
28. Master Bedroom Urinal
xxxiv) Removed - wall & plumbing made good.
+ NC
29. Main House Maintenance
xxxv)
Ongoing — one carpenter assigned all MH tasks.
+ Please advise
30. Stuart Fallbright
xxxvi) 50% complete — continuing work. No completion date.
xxxvii) New plants from Florida — 50% been planted. No
completion date.
xxxviii) JE sd Stuart can stay as long as he likes - He will stay
Until
+ Please advise
31.New Gym
xxxix) Slab poured, block work commenced — see pictures
attached.
xl)
Special order for doors / windows in hand — expected
delivery 1 Nov.
xli)
Electrical upgrade = $7,500.00 — "An"
EFTA00577817
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
AC Unit & Installation = $11,295.00 — "B"
Quotes attached - JE to please confirm if in order.
xlii)
Miles received new roof line and permit updates from
Kevin today (11/10) but has not had time to review them.
+ Update
32. Main House Outside Lights
xliii) Diagrams & pictures supplied to GM who has progressed
to requesting Miles come up with fastened cover to prevent
water from entering receptacle, copy also given to Richard.
* Update
33. Steam Room
xliv) Stand alone electric generator = $12,000.00
Upgrade LSJ power sources & run new cables =
$110,000.00 - attached quote "C"
xlv) 1/10 — Miles submitted website for pre-fabricated unit to
JE.
Website: steamandsauna.com NS spoke with Charles &
Charles will come up with suggestions.
Update
34. Items to Purchase
xlvi) First Aid/Ambulance — expected delivery 18 Oct
xlvii) Gardening Equipment — arrived at LSJ 11 Oct
+ Update &
Complete
35. MBR Curtain Rod
xlviii) 7 ft curtain rod installed 10 ft from floor on inner wall.
EFTA00577818
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
Please advise
36. Replace AC Units in Guest
Rooms
xlix) Quotes to replace all guest AC units (3) = $6,585.00 — see
attached "D" - JE to please confirm if in order
+ Update
37. Irrigation
I)
Report received — sent to Charles & forwarded to Madison
Cox, copied to JE & NS. Quoted = $930,000.00
4 Update
38. New Development
li)
Generator for new building — Paul Gandy sourcing correct
generators.
lii)
Paul Gandy drawing up bubble diagram of site utilities &
building - submitting to Ed Tuttle to design.
liii)
11/10 - Letter of credit sent and received by Pirelli.
liv)
Cable ready for factory testing betw. 30 Oct and 8 Nov. NS
will speak to Charles re having somebody attend the
testing.
Iv)
Conference call held 7 Oct betw. Darren, Paul Gandy &
others w.r.t. conflicting information — Paul Gandy was
supposed to have memo sent to Darren w.r.t what was
excluded and what needs to be included in the cable
installation proposal. Due to be received by Darren today
(11/10) and on second conference call today 11/10 betw
NS, Darren & Paul Gandy, Paul advised he had
misunderstood and assured us that he would send the memo
EFTA00577819
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS
ITEM
COMMENT
to Darren on Monday 14 Oct.
+ Update
39. Pond Clear / Algae Eater
lvi)
Company Miles was dealing with has gone bankrupt —
investigating alternate company. ES sent Miles alternative
& Miles will contact. NS also contacted Alan Stopec for his
advice.
+ Update
40. Dock Light
lvii) Ed Tuttle was not consulted on dock light and Charles has
now sent memo to Tuttle requesting manufacturer details.
+ NC
41. Permits
lviii) No progress to report — ongoing.
********************
EFTA00577820
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA00577802.pdf |
| File Size | 991.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 18,175 characters |
| Indexed | 2026-02-11T22:48:34.612437 |