ESTATE PROGRESS REPORT — November 28, 2003
7151 STREET
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Schedule
Changes to Pinto's schedule: Mirrors are expected early Jan, not
early Dec.
51h Floor
1. Front Room
a. Front room to remain GM's office.
b. Metal table style & 2 arm chairs for GM office.
c. Carpets to be changed.
d. Current furniture to remain.
e. Pinto to specify paint color for trim & interior wall finish.
2. Back Room
a. Back room to eventually become children / nanny room. Pinto
has been informed.
b. Lynn & Jojo are to move into the basement as soon as
construction is complete.
c. Bathroom to stay as is for the time being.
Pinto - Jean
Pinto
Pinto
6'h Floor
Round table: is in the process of being restored. Expected
completion by Nov 28 — delay due to miscalculation of time frame.
J Burdine
11/28
Ceiling Speakers
No speaker in MBR. Speaker wire in cornices.
Dining Room
1. Table-top: Brian Kelly is storing new rectangular table-top in
his shop until after construction phase.
2. Lighting: JE approved three chandeliers instead of spotlights.
3. Carpet: JE approved green-striped carpet.
4. Speakers: on dining room ceilin..
Pinto - Jean
1
EFTA00577845
ESTATE PROGRESS REPORT — November 28, 2003
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Entry Hall
1. Entry hall door: not to be moved.
2. Entry hall marble floor: to remain.
3. Original chandelier to remain but be painted white.
4. JE wants silk banners to hang in front entry hall in front of
Japanese paintings. Pinto to source.
5. JE has samples to select exact shade of pink for the entry hall
walls.
Pinto
JE
Main Stair
1. To be re-carpeted — JE saw sample in Paris & did not approve.
Pinto's office said they fedex'd JE a sample to NY & have not
heard back whether it was approved or not. JE to advise.
2. Sconces to ship from Paris week of Nov 10 — delayed to Dec 8.
3. JE agreed to spotlights for tapestry.
4. Alberto to make shelves to place sculptures or china pot on by
tapestry.
JE
Alberto
Kitchen Service
Corridor
Kitchen & corridor painted white. Clark to provide prices on
limestone floor. Doug has samples for JE to choose from. Pinto to
send more samples.
Clark / Doug
/ Pinto
Speakers
Speakers from Zorro mended & are in basement of 71st.
Gym
1. To be painted by painters that are at 71st St now not French
painters. Pinto to advise paint scheme.
2. Sample carpet expected by Nov 26.
3. Yoga Room is to remain the same.
4. Gym Bath is to remain the same.
Pinto
2
EFTA00577846
ESTATE PROGRESS REPORT — November 28, 2003
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
MBath
1. MBath carpet: border of original carpet to be left & Jean to
provide new insert. JE chose blue & white carpet. Pinto has
selected carpet & is due to arrive in Feb 2004.
2. Ceiling: complete; scaffold to be removed week of Dec 1.
3. Bed & little table: Pinto to purchase. Pinto has been informed
to ensure that the bed is delivered prior to completion of the MBR
walls so as to make sure the bed fits.
4. Skylight bars - JE advised to dispose of bars. Skylight is being
mended.
5. Telephone unit has been changed in dressing room. JE to advise
if it is working properly.
Pinto — Jean
Pinto
JE
MBR
1. Windows: approved to be further sound-proofed. Installation to
begin after painting & hoisting of scaffold & carpet through
windows.
2. Sconces are at 7P' Street.
3. Wall paper is due end of Feb.
4. Painting & passageway to be painted to match Bedroom. Pinto
to confirm paint color.
5. Decorative painting in progress — completion in Dec.
6. Fax sent to Pinto Nov 24 inquiring when the MBR is to be
installed — no response yet.
Doug
Pinto
Pinto — Jean
Pinto
Mirrors
Second floor landing: Mirrors to be delivered to house Dec 8 —
delayed to Jan 8. Awaiting response from Pinto re: installation.
Pinto
Oriental Rug
Expected completion by Dec.
Costikyan
3
EFTA00577847
ESTATE PROGRESS REPORT — November 28, 2003
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Technology
1. Security: Surveillance Cameras (3rd Floor): wiring complete.
Cameras to be installed once construction near completion. PTV
camera outside building installed. Night vision camera installed &
tested. Installation is in progress.
2. Computer: Upgrade for Landis BMS — complete. Software has
been loaded on new computer, new graphics installed & complete.
Static IP address for offsite connection installed.
3. Computer Networking — WIFI entire house. Complete except
in areas under construction.
4. MBR A/C Upgrade: JE approved MBR fan & cooling tower
upgrade - revised total of $87,022.66 includes electrical, ABB
Drive, & engineering fees (with design plans for chiller). Awaiting
cost for adding a separate control panel for Landis to hook system
up to BMS — proposal expected by Nov 18 — delayed.
Complete
Terrace
Jean to come up with new suggestion.
Pinto - Jean
Bio Gear
2 medium, 1 large biosuits ordered. IL at 65'h St, to be sent to 71st
St. The 2M are backordered until Jan 21. Steve Joslin, who
ordered the suits, not able as of Nov 21 to source other suppliers
for earlier delivery.
Dupont
delay
Blackout Update
Since the Black Out the following Emergency Systems have been
checked or tested to assure proper operation in the event of a power
failure. The following list contains the results of these tests.
4
EFTA00577848
ESTATE PROGRESS REPORT — November 28, 2003
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
1. Emergency Generator: cooling radiator to be cleaned & flushed.
To be done on next maintenance check — not urgent.
2. Battery Lighting Inverter - battery racks & all 48 batteries are
still on order.
3. Otis: Inspection of the elevator is complete.
FYI: In an
emergency / electrical problem, the lift automatically goes to the
ground floor & the doors stay open.
A regular phone line needs to be installed in the lift — Rich to
organize.
Cummings
Metro Power
Rich
Massage Room
Ceiling
Ceiling to be painted with clouds by the same painters being used
for the MBR woodwork. To be scheduled with painters when Jean
on site Dec 5.
Living Room
Fire Screen: Jean was told to order one.
Pinto - Jean
Nextel phones
The problem when JE was trying to ring Lynn was that Lynn had
forgotten her phone in the bathroom. JE to advise if any further
problems with this system exist.
JE
5
EFTA00577849
ESTATE PROGRESS REPORT — November 28, 2003
457 MADISON
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Office Dividers
Estimate & floor plan without new desks is in. Estimate & plan with
new desks expected by Nov 12 — delayed due to H Miller
accommodating changes & awaiting window tint selection. JE to
advise on window samples which were taken to LSJ on Nov 21 trip.
H Miller / JE
Office Computers 1. Upgrade / change computers, new programs.
Approved: 20 computers to be re-vamped.
a. LSJ & Z computers ordered & expected by Nov 21 — not arrived
yet.
b. 6 new computers — not ordered yet because these are not needed to
run Project. To be ordered when the server is up & running.
c. 10 computers remaining to be upgraded as needed.
JE to advise fate of replaced computers: Should they go to 301?
2. Approved Microsoft Project & hardware upgrades. Solomon
accounting system was rejected.
a. Marc is assembling an on-line training book to familiarize project
managers with the new system by Dec 5. Training will take 2 days
& Marc suggests for trainer to go to NY & LSJ. JE to advise if Sally
& Michael are to be trained & if Brice & Karen are to go to NY or to
LSJ.
b. New servers are being installed on Dec 1.
JE
Marc / Eric
JE
Conference Room Jeff Schantz's room to be turned into a conference room.
1. 8 Lucite chairs have been ordered — expected by Dec 12.
2. Rich to order collapsible table Nov 26. GM to have table covered
with cloth.
Kartell
Rich / GM
12/12
6
EFTA00577850
ESTATE PROGRESS REPORT — November 28, 2003
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
3. Cabinets to be removed from room by Dec 12.
Lauren
Blackberry's
GM recommends that all key personnel,
Larry V, Larry M,
JE
Dave Rodgers have Blackberry's — email, phone, sms paging system
that operates worldwide. JE to advise.
Reminder
JE to decide on office closures for the Holidays.
JE
7
EFTA00577851
ESTATE PROGRESS REPORT — November 28, 2003
PALM BEACH
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Renovations
1. Doug, Pascal, & Marsh met in PB.
Doug to interview 4
construction company candidates on Dec 1 in PB.
Construction to commence in Feb 2004 as planned.
2. Doug has received the plans for enlarging the breakfast room
from Pascal. Pascal told Project Solutions to contact Boffi kitchens
to design kitchen in PB.
3. JE is considering putting up wooden shutters with in the house.
4. FYI: No proposals have been put forth for the Cabana. Pascal
says he did not know JE wanted to renovate the Cabana. JE to
advise how to proceed.
5. JE to advise if a house is to be rented in PB. If so, JE to advise
how to proceed.
Doug
JE
JE
Air Conditioning Approved - Cassidy proposal to remove pink room from main
house unit & put on a separate unit so that each guest room has
their own unit. To be done during construction phase.
Cassidy has replaced the air ventilator grills in MBR to reduce
excess noise.
Cassidy
Complete
Painting
Dock
Approved - Dock has been sanded & varnished on Nov 21, dry by
Nov 23.
Complete
JE to view
8
EFTA00577852
ESTATE PROGRESS REPORT — November 28, 2003
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
1999 Merc 5600
5600 mechanical work is complete. Currently being worked on
cosmetically (dent removal & repainting) - expected completion by
Nov 24 — delayed to Nov 26.
11/24
11/26
1997 Merc
Stereo was malfunctioning & was replaced Nov 25. C.D. unit to be
replaced as well since this unit is not compatible with the new
stereo — to be done week of Dec 1.
Red Jeep
Jeep is in shop for repairs — expected completion by Dec 5.
12/5
Landscaping
Approved - Stopek has planted aromatic flowers (hedychium) by
the pink gate.
Complete
JE to view
Outside Table
Section of frosted table top is eroded — replacement panel has been
ordered from Italy & is due in PB by Dec 12.
12/12
9
EFTA00577853
ESTATE PROGRESS REPORT — November 28, 2003
PARIS
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
JE office
Horseshoe table /Ash tray is still expected in December.
Pinto - Jean
Kitchen
A/C to be fixed in conjunction with construction. Work has
commenced - 3 weeks to completion.
Pinto
12/16
Living Room
Separation to be added to round end of living room & new section
to be converted into MBR sitting room. Jean met with cabinet
maker & decided on custom made light Italian metal covered in
fabric. FYI: it will take 6 months to make.
Pinto — Jean
Shower Pump
Pressure
3 valves & 3 shower heads have been installed & according to
Valsdon, there is a "positive improvement."
Complete
10
EFTA00577854
ESTATE PROGRESS REPORT — November 28, 2003
PARIS - NEW APARTMENT
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Construction
Demolition has commenced. Expected completion in April 2004.
Original plumber retained. Updated schedule expected by Dec 5 —
Serge said there will be delay in construction due to JE's
adjustments for the bathroom.
Pinto - Jean
Gym Room
JE discussed with Pinto on site & decided on wall sconces &
double doors.
Pinto - Jean
Bath
JE agreed to new plan for Bath: more cabinets & drawers & a
decorative paint scheme on screen.
II
EFTA00577855
ESTATE PROGRESS REPORT — November 28, 2003
PLANES
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
727 Boeing
1. Larry M awaiting fabric selection for office chair. JE to advise. JE
2. Shower water heater & control has removed & is being repaired
To be reinstalled while stripe change is being made week on Dec
1.
3. JE requested painted stripe on the exterior to be modified — to
be done (except for full length stripe) week of Dec 1 in PB in
conjunction with shower reassembly & other minor maintenance
tasks — approx 3 day down.
a. The top 1/4" beige to become a 1/2" red touching the top
blue stripe full length.
b. The blue stripes to be lengthened at the leading edge by 1/2".
c. The white stripes to become red.
d. Changes to fuselage stripe will be duplicated on the tail.
Bell
1. Larry V is confirmed for Bell maintenance course Dec 1-12.
Helicopter
2. Larry V needs Pilot training for helicopter no later than end of Larry
Jan. Larry to advise re: dates during his maint course training.
3. Recurrent training: Gary & Maria have completed course.
Nicholas is scheduled for Dec 8-9.
4. a. Nicholas will be off island Dec 5-9 & Dec 26 — Jan 3.
b. Maria will be available Dec 1 — 26.
c. Gary will be available Dec 1— 30.
12
EFTA00577856
ESTATE PROGRESS REPORT — November 28, 2003
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Gulfstream
No. 2 GIIB engine has been installed. JE advised for Gulfstream
to be picked up after Thanksgiving.
13
EFTA00577857
ESTATE PROGRESS REPORT — November 28, 2003
STAFF
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Rick Harrington
JE to advise if there is any further action to be taken?
JE
Personal
Requests
Nicholas would like to use the Dive Boat that is for sale from
Dec 26 — Jan 3 to take his family to Anagada for New Year's. GM
recommends no. JE to advise.
JE
Vacation
Requests
requests holiday Dec 23 — Dec 29. FYI: On Oct 21 Jeff JE
Schantz had approved
request for holiday Dec 22 — Jan 2.
JE to advise.
14
EFTA00577858
ESTATE PROGRESS REPORT — November 28, 2003
MISCELLANEOUS
LOCATION
COMMENT
NEXT
ACTION BY
DATE
BY
REVISED
DATE
Directories
Personalized directories for the houses have been completed.
JE has revised sample metal binder. JE to confirm approval.
4 weeks to completion.
JE
NetJets / Flight
Options
As of Nov 24, Kocher & other parties are still working on this
matter.
Kocher
Suburban
2004 Suburban for NY has been ordered. Expected by Dec 1.
12/1
15
EFTA00577859
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00577845.pdf |
| File Size | 751.9 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 14,340 characters |
| Indexed | 2026-02-11T22:48:34.759138 |