ESTATE PROGRESS REPORT — September 26, 2003 71" STREET LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Jean Jean to be at 7P' St Oct 1 at 2PM & spend remainder of day there. 51h Floor 1. GM study to be redecorated. GM would like a very simple white room — GM asked Jean to come up with a simple scheme. 2. JE wants 56 floor staff room to be repainted. Doug has been informed. 3. Lynn & Jojo are to move into the basement — JE to advise if 5th floor is to become guest rooms, if it is to be decorated by Pinto & if the old carpets (bathroom etc) are to be used for that area? JE to see room & advise on return to NY. Pinto - Jean JE 6'h Floor Round table: is in the process of being restored. Expected completion by Oct 10. J Burdine 10/10 Ceiling Speakers Speakers to be installed in MBR & MBR Sitting Room. Doug has organized to have speaker wire installed. Doug Dining Room 1. Table-top: Brian Kelly is storing new rectangular table-top in his shop until after construction phase. 2. Lighting: JE approved two chandeliers instead of spotlights. 3. Carpet: JE approved green-striped carpet. Pinto - Jean Entry Hall 1. Entry hall door: door location to be changed. (Doug has been reminded of electric and security.) 2. Entry hall marble floor: JE advised to keep marble floor. Dou to meet with 3 floor contractors for ricin . Doug EFTA00578147 ESTATE PROGRESS REPORT — September 26, 2003 LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Kitchen Service Corridor The floor should be changed as it is peeling & the walls repainted. Jean to advise color on next visit to NY. Pinto - Jean MBath 1. MBath carpet: border of original carpet to be left & Jean to provide new insert. JE chose blue & white carpet. 2. Ceiling: men minus their parts approved. Scheduled to begin beginning of Oct. 3. JE approved a bed, & little table: Pinto to purchase. Pinto — Jean Pinto - Jean Pinto MBR Windows: to be further sound-proofed. Acoustical co. selected. Doug Mirrors Second floor landing: The tapestry is being kept in storage as it could not be kept under the mirrors because the mirrors would not stick to it. Oriental Rug Doug met with Costikyan & they have settled how & where to cut rug. Expected completion by Dec. Costikyan Schedule Finalized schedule to be available after Jean's next visit to NY. Technology 1. Security: Surveillance Cameras (3rd Floor): wiring complete. Cameras to be installed once construction near completion. 2. Computer: Upgrade for Landis BMS to be scheduled to coincide with upgrade of 3rd floor a/c system. Installation to start Oct 6. 3. Antenna: 7 Nextel phones purchased & are charging at the house. Sawyers checked - house signal ok. 2 EFTA00578148 ESTATE PROGRESS REPORT — September 26, 2003 LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE 4. Computer Networking — WIFI entire house. Complete except in areas under construction. 5. MBR A/C Upgrade: Sequence of investigation determined in Sept 4 meeting. To start with New Air Balancing Report. Awaiting confirmation. 7 l st St is currently on 9- zone fan — it will have a separate MBR fan. Quote for pricing of fan, possible chiller & cooling tower upgrade expected by Oct 3. Sawyers Terrace Jean to make recommendations re: terrace on next visit to NY Oct 1. Pinto - Jean Bio Gear Dupont to ship the 3 bio suits on Sept 23 — delay due to co. running out of materials. Dupont Blackout Update Since Black Out the following Emergency Systems have been checked or tested to assure proper operation in the event of a power failure. The following list contains the results of these tests. 1. The Emergency generator has been tested and serviced by cummings metro power, they found & repaired an oil leak & suggest that the cooling radiator be cleaned & flushed. To be done week of Sept 29. 2. Battery lighting inverter - battery racks & all 48 batteries have been ordered. 3. Otis to complete tests on elevator emergency control system & wiring week of Sept 29. Exhaust fan has been changed. Otis 3 EFTA00578149 ESTATE PROGRESS REPORT — September 26, 2003 457 MADISON LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Office Dividers GM viewed sample dividers at H Miller showroom. GM selected free-standing units that require no structural work to the office in two woods, dark brown cherry (standard) & mahogany dark (special- order, more expensive). If JE approves, a rep to visit office to measure & price. Color samples at 457 for JE to view. JE Office Computers 1. Upgrade / change computers, new programs. a. Approved: 21 computers to be re-vamped - 10 new computers have been ordered; 11 remaining to be upgraded as needed. b. 13 monitors to be replaced with LCD's. 18" black LCD's have been installed. All are replaced. 2. New system: Consultants' report fed ex'd to JE in LSJ. 4 EFTA00578150 ESTATE PROGRESS REPORT — September 26, 2003 PALM BEACH LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Rennovations 1. Pascal due in PB end of Oct to review work that needs to be done. Pascal thinks construction will be ready to start in early Dec. JE advised constr to commence in Feb 2004 as planned. 2. Pascal has provided a modified plan for enlarging the breakfast room. Construction co. needed plans to apply for permit. JE advised Pascal to have constr co. choose the architect. Pinto - Pascal Air Conditioning Cassidy has completed project. Complete Computer Networking / WirelessNetwork Upgrade 1. SL Powers has completed re-wiring. 2. PC Paramedics have ordered 8 access points, expected week of Sept 22 — delayed. To be installed once received. PC Paramed Complete Curtains Falling curtains in several rooms to be re-hung temporarily so that they will last until renovations start. Ray Dicrosta to re-hang week of Sept 29 Ray Dicrosta Mercedes Guard car is complete. Car in NY. Complete Painting Small areas within house have been re-touched. Additional areas to be added (MRB corridor — Part of Pink corridor, Kitchen ceiling 5 EFTA00578151 ESTATE PROGRESS REPORT — September 26, 2003 PARIS LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Boudoir Carpet has been installed. Complete JE to view Gym Room JE discussed with Pinto on site & decided on wall sconces & double doors. Pinto - Jean JE office Horseshoe table /Ash tray is expected in December. Pinto - Jean Kitchen A/C to be fixed in conjunction with construction. New A/C co to be sourced & scheduled. No update form Pinto office Pinto 6 EFTA00578152 ESTATE PROGRESS REPORT — September 26, 2003 LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Living Room Separation to be added to round end of living room & new section to be converted into MBR sitting room. Jean to buy 2 screens. Pinto — Jean Shower Pump Pressure Pressure to be re-adjusted. New plumber to be sourced & scheduled. No update Pinto office Pinto PARIS - NEW APARTMENT LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Change Windows before Winter Double window to be changed to single window. 7 EFTA00578153 ESTATE PROGRESS REPORT - September 26, 2003 Construction Demolition has commenced. Expected completion in April 2004. Pinto - Jean New A/C & plumbing co's to be contracted will delay the schedule and the receipt of the schedule, as nothing can be confirmed until the new co's are on board. PLANES LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE 727 Boeing 1. Larry M awaiting fabric selection for office chair. JE to advise. 2. "C" Check / MSG3 heavy maintenance - expected completion by Oct 25 provided there are no problems or glitches. JE 10/25 EFTA00578154 ESTATE PROGRESS REPORT — September 26, 2003 LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE 3. Pacific Gas Turbines of San Diego contracted for No. 2 engine heavy maintenance at "C" Check. Engine to be shipped & returned before completion of "C" Check, no rental engine required. 4. JE working directly with designer for scheme. JE advised to keep titanium, add red stripes, & maybe extend stripes. More renderings expected. 5. Shower Installation — in progress. (Cabinets in Savannah, Engineering in Dallas, Mechanicals in Waco.) JE selected beige UltraLeather for headliner & toilet seat/lid to match the beige in the carpet. Larry M has ordered material. 6. Eric has notified insurance co that 727 will be down for "C" check. They will refund 30% of the premium once the plane exceeds 45 days down. Bell Helicopter 1. Larry V is confirmed for Bell maintenance course Dec 1-12. 2. Helicopter is operational. 3. When should the helicopter be flown to St T?. JE Gulfstrcam No. 2 engine is disassembled and awaiting inspection at Dallas Airmotive, Millville. Expected re-installation by Oct 31. 10/24 10/31 Pilots Dave completed GS recurrent training Sept 19. Dave is in Flight Engineering Sept 24-26. 9 EFTA00578155 ESTATE PROGRESS REPORT — September 26, 2003 STAFF LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Construction Manager and Estate Manager Still looking for candidate. Zorro Maint. GM / & Brice working with agencies & looking locally to GM / I0 EFTA00578156 ESTATE PROGRESS REPORT — September 26, 2003 LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Person source new staff. & Brice Rick Harrington Is there any further action to be taken? JE & Brice & Brice sent reminder to GM to discuss their contract. JE They would like to clear their contract issues. JE sd he would think about it and let me know — reminder they are anxous to make their plans and book flights Vacation Requests 1. Larry M requests holiday from Jan 1 through Jan 7 — he has family arriving in FL. JE to advise. 2. Floyd & Deidre request vacation Nov 5 through Nov 11. JE to advise. FYI: 5 vaca days taken year to date. JE JE MISCELLANEOUS LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Directories 40 directories sent to the binder Sept 23 — they will take 3 weeks to bind. Samples of each of the 3 covers ready by Oct 1. Metal binders have been ordered, expected by Oct 24. 10/17 II EFTA00578157 ESTATE PROGRESS REPORT — September 26, 2003 Tea Pots Hand-blown / hand-painted tea pots & French tea pots from Monaco have been ordered. All expected by Oct 3. 10/3 Christmas Gifts JE to advise who to send gifts to this Christmas. Please see attached list of last year's recipients. *A-1 JE 12 EFTA00578158

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00578147.pdf
File Size 575.0 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 10,624 characters
Indexed 2026-02-11T22:48:37.050903
Ask the Files