EFTA00578669.pdf
Extracted Text (OCR)
From:
To:
"<a
Cc:
Subject: Re: Aircraft Status 04/12/02
Date: Mon, 16 Dec 2002 15:21:36 +0000
Hi Edwina:
The following is the status for this week. I know it's early, but I may be flying or out of
computer contact Thursday. This info was faxed to JE this AM per
. I don't see any
major changes by your report time. If any changes I will call you. Any questions please
call me.
Regards: Larry M.
8727
Office Chair:
JE working with foam test cushions
Office Stereo: Consulting with Sound Experience to utilize equip. adding only
simplfied CD player.
Shower:
Awaiting quote, Pro Aircraft Interiors checking on mechanicals.
Shades in
Stateroom fi
Office:
Quote ready Thurs. Dec. 19
Office Desk:
JE requested 2" sides installed temporarily (trying to have ready
prior to Dec. 17)
Aft Lay. Sink: Replacement sink being installed and completed evening of Dec. 16
GIIB
LOA for GIIB RVSM / MNPS:
Unchanged, will be received by Dec 31.
Stage III: Presented JE with a letter containing my viewpoints, otherwise no
change.
**New** JE approved installation of Iridium blending to AirCell on the GIIB,
Requested formal quote from JA, ordered parts to retain 30% savings.
Install date T.B.D.
Sincerely: Larry M.
EFTA00578669
Document Preview
Extracted Information
Dates
Document Details
| Filename | EFTA00578669.pdf |
| File Size | 40.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,245 characters |
| Indexed | 2026-02-11T22:48:43.904272 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.