JE Punch List — November 4, 2012
1. Clean Up - make as many barge runs as necessary
2. Equipment and Vehicles
- Sell equipment
- No machinery off the island unless approved
- Lull — replacement parts — delivery to Tropical 11/1— sail 11/7, EDA on STT 11/10
3. Five Palms
- Picture frame — on site, 86 x 70 — Sarah to forward selected picture, will frame locally
- Mirrored siding — will continue to reglue as sections fall off - 17 new sections/glue — EDA on LS1 11/5
4. Grotto
- Mattress cover — completion delayed due to owner travelling to northeast — completion expected 11/14
5. Berm/Top of Hill
— Brice investigating a wood/paper combination material for hydro-seeding. The company that made LSJ hydro-seeder
is no longer in business
- Pergola construction for high road benches — David (carpenter) — require design details from JE
6. Triangle
- Must design triangle — awaiting JE direction
- Palms will be relocated once Lull is repaired
- Installation of lights — Danny will review 11/5
7. Flagpole Pool Cabana
- Furniture — desk left Paris, awaiting ETA to STT
- Pace clock — ordered 2 new units -1 for backup — due on site 11/8
8. Floating Dock
- Sea-Do Jet Ski — will need to review how this unit will be secured at dock
- Dock box top & seat —refinished — David (carpenter) will reinstall 11/5
- Dock boxes — the mechanisms for closing the boxes need to be replaced — box lids keep breaking down/rotten wood
when struts installed —JE to speak to David directly
- Dock & Floating Jet Ski Dock Carpet — on STT 11/5 — David (carpenter) will install
9. Chillax Room
— Requires furniture piece for electrical/media equipment - Sarah forwarded a selection 9/28, 10/1 & 10/30 —awaiting
direction
10. Chillax Bathroom
- Walls in vanity area to be painted —JE to select color
11. Boats
- Lady G — sell — will remain at Nanny Cay until sold
- Big N — repair at AYH dock in progress —hydraulic hoses shipped to STT 11/2, boxes to be installed 11/5, painting 90%
complete, electrical refurbishment 90% complete. Cylinders to be taken to AYH 11/5 and installed there
12. AC - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees
13. Transient Surge Protection, Blue Storage Bins & Safety Glasses — Tropical shipped to Nassau in error, customer who
received goods is refusing to return items. Will submit a claim to Tropical STT — EDA to be determined
Per JE direction have reordered items from Grainger — 11/4
14. Landscaping — Peter's List
- Flowers — Brice has purchased wide variety of cutting flower seeds which will review with JE
- Master Planter — JE to speak with Peter when he is back on duty
- High road waterfall — rocks to be installed
- Line all roads with rocks, which are being sourced from the far salt pond beach area
- Pop's Garden — require deer protection — LV will bring Electric Fencing down on plane
- Shade cloth — reviewing propagation of seeds which were planted 10/16. Suggest raised planter beds, using tables
from nursery
- Peter to clean the sides of the road — work in progress
EFTA00583106
- Black Heli Under Pads — install at top of bike path at MC — EDA on LS1 11/5
- Review growth of sea grape - engineering area — transplanting has not worked — review purchasing small plants 11/6
15. Roads
- General re-grading of roads — ongoing — Peter
- Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,500, Concrete - $103,600. Researching
porous concrete option, water drains thru surface, used on St John & St Thomas
- Contact Tom Melnick about concrete road construction 11/5
16. Library
- AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will
answer concerns & develop control designs, EDA 11/16
17. New Employee Bathrooms
18. aym
- New punching bag — installation of the speed bag - David (carpenter) — requires JE direction
- Ballet Room Windows — require direction from JE
- Ceiling Fan — Danny to review 11/5
19. Beach Office
- complete electrical overall required
- waterproofing/sealing/painting/replace rotten wood — David (carpenter) — began 10/28
20. 1.51 Mooring — Darren spoke with Army Corp 10/17 — still working on environmental report, will forward ASAP
21. Hangar
- Fuel Containment Pad — via Cecile 10/25 —there is an issue with the site possibly being in a flood zone. Reviewing
with Jaredian Design Group (John Woods).
22. Steel shed — Buck Steel drawings on site. Shed ordered. EDA to Tropical 12/4, booked to sail 12/7
- Removal of existing bolts patterns & installation of new - David (carpenter)
23. Equipment Purchase and Delivery
- (3) Terex RL-4000 6kW Light Tower systems — EDA on STT 11/3
- (1) Skid steer forks — EDA on STT 11/6
- (1) 2012 John Deere 5101E tractor with 553 loader and 8' blade — EDA on STT 11/3
- (1) 2003 Genie Z60/34 Boom lift— EDA Tropical by 11/9
- (2) 2013 54-Express electric golf cars — EDA on LSJ 11/S
- (1) 2012 JCB 8035Z Mini Excavator purchased - $39,455 — awaiting buckets from UK before delivery to Tropical
24. LS1 Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production — EDA STT 11/23
25. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired
26. Stone Walls — Repair work to replace missing loose stones — Gerry & T1 working as time permits
27. Part Time Employees —focus on finding housekeepers — have a potential candidate, working the next week.
28. Heli Pad - wind sock for Heli pad on site. New wind sock assembly ordered — Larry will bring down on next flight
29. Cisterns — need to be cleaned /sealed. Vendor on site 10/20 to review scope of work — quoted expected 11/5
30. Solar - JE does not like the white light", prefers soft white light — JE to review when on site
- Revised proposal from Pure Logic submitted to JE via email 10/22
31. Mr. Wind Statue - installation of light - Danny will review 11/5
32. Gorilla — needs to be relocated - require JE direction
33. Kite House — Repainting of outside eves of deck
- Repair of Deck — David (carpenter)
34. Movie Screen — Danny to investigate a new motor 11/5
35. Master Bathroom - Top and Bottom of Steam Room Shower Door - need to review
EFTA00583107
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00583106.pdf |
| File Size | 165.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 6,302 characters |
| Indexed | 2026-02-11T22:50:11.013875 |