IN THE SUPERIOR COURT OF THE VIRGIN ISLANDS
DISTRICT OF ST. THOMAS & ST. JOHN
**********************************
GREAT ST. JIM, LLC,
)
)
Plaintiff,
)
)
v.
)
)
DEPARTMENT OF PLANNING AND
)
NATURAL RESOURCES and DAWN HENRY )
In Her Official Capacity as Commissioner of the )
Department of Planning and Natural Resources, )
)
Defendants.
)
)
CIVIL NO.
12017
COMPLAINT
COMES NOW Plaintiff Great St. Jim, LLC, by and through its undersigned counsel,
ICELLERHALs FERGUSON KROBLIN PLLC, and for its Complaint against the Department of Planning
and Natural Resources and Commissioner Dawn Henry, states and alleges as follows:
PARTIES & JURISDICTION
1. Plaintiff Great St. Jim, LLC ("GSJ") is a limited liability company organized under the
laws of the U.S. Virgin Islands.
2. Upon information and belief, Defendant the Department of Planning and Natural
Resources ("DPNR") is an instrumentality of the Government of the U.S. Virgin
Islands.
3. Defendant Dawn Henry is the Commissioner of Defendant DPNR.
4. This action arises out of Defendants violations of DPNR's obligations to GSJ under a
settlement agreement with GSJ signed by the Director of Coastal Zone Management
("CZM") on August I, 2016 and Defendant Commissioner Henry on August 4, 2016
(the "Settlement Agreement").
EFTA00583158
GS!, LLC v. DPNR et al.
Civil No.
/ 2017
Complaint
Page 2
5. Defendants violated the Settlement Agreement when they imposed a Two Hundred Ten
Thousand Dollar ($210,000) assessment against GSJ based on legally and factually
deficient claims against GSJ purportedly for violations of the Coastal Zone
Management Act (the "Act") on the large private single-family residence known as
Great St. James. Such an assessment, of a magnitude never before imposed on a private
single-family residence of any size, is unprecedented in CZM's and DPNR's
enforcement history and well in excess of Defendants' contractual and legal authority.
6. Defendants refused to provide adequate notice of such legally and factually deficient
claims or a reasonable opportunity to cure the same, as required under the Settlement
Agreement. In fact, Defendants unilaterally and arbitrarily imposed only a ten (10) day
cure period, which included five (5) days of weekends and a legal federal and Virgin
Islands holiday.
7. All of this appears to have been a deliberate effort to ensure that it would be impossible
for GSJ to cure DPNR's list of inadequately described and improperly claimed
violations within the unreasonably short cure period imposed by Defendants in
violation of DPNR's obligations and GSJ's rights under the Settlement Agreement.
8. GSJ correctly challenged the unreasonably short cure period in violation of the
Settlement Agreement as being an insufficient period of time within which to first
obtain necessary clarity from DPNR as to precisely what was within the scope of
Defendants' legal authority to require GSJ to cure, and then, once adequately clarified,
to afford GSJ an opportunity to cure the same within even the minimum time period
within which GSJ could reasonably be expected to effectuate those cures.
9. Defendants ignored GSJ's repeated requests to establish a reasonable cure period,
providing only an insignificant and wholly inadequate extension of the unreasonably
EFTA00583159
GS!, LLC v. DPNR et al.
Civil No.
12017
Complaint
Page 3
short cure period initially imposed. Further, Defendants eliminated even the marginal
value of such extension by canceling a meeting between representatives of DPNR and
GSJ to discuss the deficiencies in what DPNR was demanding of GSJ. The meeting,
which was to take place prior to the expiration of the extended cure period, was
essential to GSJ's resolution of DPNR's deficient demands because DPNR refused to
engage in any discussion regarding its deficient demands outside of that meeting, and
the meeting was therefore the only avenue available to GSJ to obtain the clarity needed
by GSJ to timely implement any appropriate cures.
10. As more fully explained below, Defendants' legally and factually deficient claims,
arbitrary imposition of an unreasonably short cure period, and refusal to clarify or even
discuss the deficiencies of their claims prior to the expiration of that unreasonably short
cure period, including by canceling the one and only opportunity for the parties to meet
before the cure period expired, violated DPNR's obligations and GSJ's rights under the
Settlement Agreement.
II. Moreover, Defendants reliance on the remedy provisions of the very Settlement
Agreement they have violated in order to justify the imposition of the unprecedented
Two Hundred Ten Thousand Dollar assessment on GSJ is an unlawful act far outside
the scope of Defendants' authority.
12. This is a civil action arising out of such unlawful and unauthorized conduct by
Defendants for breach of contract, breach of the implied covenant of good faith and fair
dealing, declaratory judgment, and equitable relief over which this Court has
jurisdiction pursuant to 4 V.I.C. § 76.
EFTA00583160
GSI LLC v. DPNR et al.
Civil No.
/ 2017
Complaint
Page 4
13. Venue is proper in this Court pursuant to 4 V.I.C. § 78, as the District of St. Thomas &
St. John is the judicial division where the cause of action arose and where Defendants
may be served.
FACTS
The Settlement Agreement
14. GSJ is the owner of a private, single-family residence located within the U.S. Virgin
Islands and known as the island of Great St. James, which is the site of activity in issue.
15. In April of 2016, DPNR issued Notice of Violation identified as NOVA-04-16-STT
("Notice of Violation") to GSJ seeking an assessment of Two Hundred Eighty
Thousand Dollars ($280,000.00) for what DPNR alleged were violations of the Act
("CZM Violations") on Great St. James. [EXHIBIT A]
16. GSJ contested the alleged CZM Violations as unjustified and the assessment as an
unprecedented penalty on a private single-family residence, both well outside the scope
of DPNR's authority, and negotiations between the parties ensued.
17. On August 4, 2016, in an attempt to resolve the Notice of Violation, so that GSJ could
proceed with its plans for Great St. James, GSJ entered into a Settlement Agreement
with DPNR regarding the challenged violations and assessment asserted in the Notice
of Violation (the "Settlement Agreement"). [EXHIBIT BI
18. As part of the Settlement Agreement, GSJ agreed in sum to refrain from further
violations of the Act, to pay DPNR a fee in mitigation for the disputed CZM Violations
claimed by DPNR and to pay DPNR the balance of the initial Two Hundred Eighty
Thousand Dollar ($280,000.00) assessment, after deduction of the mitigation fee, in the
event of future violations of the Act which GSJ fails to cure after DPNR provides notice
of the same.
EFTA00583161
GSJ LLC v. DPNR et aL
Civil No.
12017
Complaint
Page 5
19. In order to address the prospect of additional legally and factually deficient
determinations by DPNR and further excesses in the exercise of DPNR's assessment
authority, GSJ insisted that the Settlement Agreement include notice and opportunity
to cure provisions with respect to all violations of the Act that might be asserted by
DPNR in the future.
20. Accordingly, the Settlement Agreement provides that in the event DPNR were to seek
to claim any such violations of the Act in the future as a violation of the Settlement
Agreement, GSJ could not be assessed for such violations with the balance of the
original assessment unless GSJ was first given prior notice and an opportunity to cure
any and all such claimed violations. See EXHIBIT B at Item 3(d).
21. In exchange for these necessary protections from future overreaching by DPNR, GSJ
agreed in the Settlement Agreement to pay and did pay a mitigation fee of Seventy
Thousand Dollars ($70,000.00), a fee much higher than that which previously ever was
ever paid for similarly alleged violations of the Act on any private, single-family
residence of any size.
22. The notice and the opportunity to cure provisions, therefore, were and are a material
component of the Settlement Agreement expressly bargained and paid for by GSJ.
23. As is explained below, GSJ's concerns regarding the need for protection from DPNR
overreaching were well founded.
The Unlawful Entry and Search
24. On October 28, 2016, three (3) DPNR representatives, including an armed enforcement
officer, Officer Mercer, Jean-Pierre Oriol, Director of CZM, and Attorney Michele
Baker, DPNR Legal Counsel, entered upon Great St. James without prior notice to or
EFTA00583162
GSI LLC v. DPNR et al.
Civil No.
12017
Complaint
Page 6
permission from GSJ, any statutory right, or any other legal grentidsground to do so,
and in effect conducted an unlawful entry and search of Great St. James.
25. DPNR previously issued a minor CZM permit to GSJ in connection with development
relating to a certain cistern project (the "Cistern Project") situated at a discrete location
on Great St. James. The express conditions of that permit (the "Cistern Permit") limit
the times during which DPNR may request access to Great St. James, as well as the
scope and location of such access. Section V, paragraph 8 of the Cistern Permit
provides, in relevant part:
The Commissioner or his authorized agents or representatives shall have the
power to enter at reasonable time during projects work hours upon any
lands or waters for which a Coastal Zone Permit has been issued. The
Permittee shall permit such entry for the purpose of inspection and
ascertaining compliance with the terms and conditions of said Coastal Zone
Management permit.
See EXHIBIT C at Section V, paragraph 8 on page 2.
26. Thus, by the express terms of the Cistern Permit, DPNR was authorized to seek access
only at a reasonable time and only during the working hours of the Cistern Project.
Moreover, DPNR could request access only for the limited purpose of inspecting the
specific site of the Cistern Project and only in order to ascertain compliance at that site
with the terms of the Cistern Permit. By the express terms of the Cistern Permit, GSJ
is only required to permit such access during those limited times, at that limited site
and for that limited purpose. DPNR's recourse in the event access is denied is to issue
a cease and desist order or to commence proceedings to revoke the Cistern Permit in
the event it can show that the Permittee violated the conditions of the Cistern Permit
(which had not occurred in this case). DPNR is not authorized to disregard the terms
of the Cistern Permit or the directives of GSJ's representatives and trespass on private
property and is statutorily limited by the provisions of Title 12, section 913.
EFTA00583163
LLC v. DPNR et al.
Civil No.
/ 2017
Complaint
Page 7
27. DPNR sought access to Great St. James on October 28, 2016 at a time when there was
no work taking place at the Cistern Project and which was therefore outside of the
project's working hours. Furthermore, the time of the access was unreasonable in that
it was sought without prior notice when neither the owner nor anyone with knowledge
of the Cistern Permit was then available to accompany DPNR to the site of the Cistern
Project, it disrupted the schedules of GSJ personnel, and it interfered with the conduct
of their assigned duties.
28. DPNR's representatives were met at the only dock on Great St. James, which
effectively serves as the owner's front door, by GSJ personnel, who, having been forced
to disrupt their schedules and disregard their assigned duties to receive the DPNR
representatives, specifically advised the DPNR representatives that the owner was not
on the island and that the GSJ personnel present had no authority to grant access to the
island, and directed DPNR to GSJ's office in Red Hook.
29. Nevertheless, over the protests of GSJ personnel, and lacking any legal grettedsground
or right whatsoever, DPNR illegally entered onto the premises of Great St. James.
Moreover, despite that fact that the express terms of the Cistern Permit limited the
location and scope of any permissible access on Great St James exclusively to the site
of the Cistern Project for the narrow purpose of ascertaining compliance with the
Cistern Permit at that specific site, DPNR traversed the entire island without
restrietiettwith self declared impunity, claiming to be authorized to conduct an
"inspection" of the entirety of Great St. James, but in fact conducting an unlawful
search on Great St. James.
30. This unlawful entry and search was particularly egregious in this case because it was
conducted with the approval and participation of DPNR's legal counsel. DPNR's
EFTA00583164
GS!, LLC v. DPNR et al.
Civil No.
12017
Complaint
Page S
Counsel is ethically prohibited from communicating with another party or its
representatives without the prior permission of that party's attorney when, as here,
DPNR's Counsel knows that party to be represented by legal counsel. Counsel for
DPNR made no attempt whatsoever to contact the undersigned legal counsel for prior
approval or to notify GSJ before the unauthorized entry on Great St. James r the,
Counsel for DPNR engaged in communication with GSJ personnel without permission,
in violation of ethical obligations, and in furtherance of the unlawful search.
31. By refusing to comply with the conditions of the permit and conducting an
unauthorized search throughout the entirety of Great St. James without prior notice to
GSJ or its legal counsel at an unreasonable time when neither the owner nor
knowledgeable GSJ representatives could be present, DPNR eliminated any
opportunity for clarification or discussion at the site giving rise to a series factual and
legal errors (more fully described below) by DPNR underlying the instant action.
32. During its unlawful entry and search on October 28, 2016, DPNR verbally instructed
workers to cease and desist from further activity anywhere on Great St. James. That
verbal instruction was confirmed by a written cease and desist order, M02-16-STT,
dated October 28, 2016, that was to be served on counsel for GSJ via email and was
delivered to GSJ's Red Hook office on October 31, 2016 (the "Cease and Desist
Order"). [EXHIBIT D]
Erroneous Notice to Cure & the Arbitrary and Unreasonable Cure Period
33. On Friday, November 4, 2016, based on inaccurate observations, unfounded
assumptions, and erroneous conclusions of fact and law made during DPNR's unlawful
EFTA00583165
GS!, LLC v. DPNR et al.
Civil No.
12017
Complaint
Page 9
entry and search of Great St. James on October 28, 2016, Defendants issued a Notice
to Cure Breach of Settlement Agreement (the "Notice to Cure") [EXHIBIT E].
34. The Notice to Cure was and is deficient because, among other deficiencies, it
improperly attributed violations to Plaintiff where none had occurred and as to matters
for which it was readily apparent that GSJ bore absolutely no responsibility, failed to
adequately specify the basis and nature of the violations claimed or to provide any
reasonable description of allowable cures that DPNR required, and provided an
arbitrary and unreasonably short cure period, all in clear violation of DPNR's
obligations and GSJ's rights under the Settlement Agreement.
35. Emblematic, though not an exhaustive list, of alleged violations DPNR improperly
asserted against GSJ in the Notice to Cure were the following:
a. An alleged violation against GSJ with respect to four (4) moorings in waters off
the shores of Great St. James which for decades or more prior to GSJ's
acquisition have served as a popular public recreation spot for boaters. These
moorings were affixed to submerged land which is not part of Great St. James,
and were neither installed nor maintained by GSJ, and as such, GSJ could in no
way be held responsible for them. This indisputable fact was acknowledged
by DPNR at a November 22, 2016 meeting, but only after GSJ was forced to
expend resources and remove the moorings prior to the expiration of DPNR's
unreasonable cure deadline.
b. An alleged violation with respect to what DPNR claimed was the excavation of
approximately three thousand five hundred (3500) square feet to four thousand
(4000) square feet of land, which DPNR inaccurately asserted was being
prepared for future development. In fact, that site had not been excavated. As
EFTA00583166
GS-1, LLC v. DPNR et at
Civil No.
/ 2017
Complaint
Page 10
is well known by DPNR representatives who had visited Great St. James
previously, the area in question was an existing garbage dump site created by
the prior owner. As subsequently acknowledged by DPNR's representatives at
the November 22, 2016 meeting, this site presented no violations to be cured
by GSJ. However. DPNR refused to provide any such acknowledgement prior
to the expiration of DPNR's unreasonable cure deadline. Without guidance
from DPNR as to what violation was presented by this site and what cure DPNR
expected with respect to the same, GSJ was forced to expend substantial
resources on equipment, transporation and personnel in an attempt to respond
to DPNR's ambiguous demands for a "cure."
c. An alleged violation against GSJ with respect to a non-permanent, movable
covered picnic table of which DPNR representatives specifically had been made
aware during a prior visit to Great St. James, and had correctly not found it to
constitute any violation. Under the circumstances, GSJ was unable to determine
what violation this non-permanent, readily moveable structure could possibly
present or what cure DPNR expected of GSJ with respect to it.
36. The Notice to Cure unreasonably and arbitrarily demanded that Plaintiff cure the mix
of non-existent, inadequately described, and improperly assessed violations alleged in
the Notice to Cure within ten (10) calendars days of its receipt, which included five (5)
days of weekends and holidays that fell during that ten (10) day cure period, and
unilaterally imposed a cure deadline of November 14, 2016 with which it was
impossible for GSJ to comply.
37. On Monday, November 7, 2016, Plaintiff notified Defendants in writing of the
deficiencies in the Notice to Cure, including the arbitrary and unreasonably short ten
EFTA00583167
GS!, LLC v. DPNR et al.
Civil No.
/ 2017
Complaint
Page 1 I
(10) day cure period, which writing was followed by an email communication on
November 11, 2016 [EXHIBITS F &
38. Despite the extremely short cure period imposed by DPNR, no response to GSJ's
communications was received from DPNR until Friday, November 11, 2016, a federal
and Virgin Islands holiday on which businesses in the Virgin Islands were closed for
the weekend.
39. By email on that date, DPNR, acting outside of the scope of its obligations under the
Settlement Agreement, unreasonably refused to grant any extension of time, leaving
GSJ without an opportunity to review with DPNR the erroneous claims and determine
jointly with DPNR a proper course and reasonable timeline in which to proceed.
[EXHIBIT HI
40. Although it was a local and federal holiday, counsel for GSJ responded on that same
date with additional valid reasons to support an extension. [EXHIBIT I]
41. Only after the holiday weekend had passed and the cure deadline was upon them,
DPNR finally responded to GSJ and advised GSJ that, solely to account for DPNR's
delay in responding, DPNR would extend its cure period by a mere four (4) days to
November 18, 2016.
42. As a result of DPNR's insignificant and wholly inadequate extension, the cure deadline
would fall only two (2) days after the previously scheduled date of an informal meeting
between GSJ and DPNR that was supposed to occur on November 16, 2016. DPNR
Counsel proposed the informal meeting on that date in response to GSJ's request for
an opportunity to review and discuss the numerous deficiencies in the Notice to Cure.
[EXHIBIT J]
EFTA00583168
GV, LLC v. DPNR et al.
Civil No.
/ 2017
Complaint
Page 12
43. The meeting was essential to GSJ's proper resolution of the legally and factually
deficient demands in DPNR's Notice to Cure because DPNR refused to engage in any
discussion regarding its deficient demands outside of that meeting. It was therefore the
only avenue available to GSJ prior to the expiration of DPNR's unreasonably short cure
period to obtain the clarity GSJ reasonably required to timely implement any
appropriate cures.
44. The scheduling of the meeting on November 16, 2016, which was to take place only
after the initial ten (10) day cure period would have expired, was one of many factors
making DPNR's initial ten (10) day cure period patently unreasonable. Even with the
slight extension, the cure period spanned only fourteen (14) days, from November 5,
2016 to November 18, 2016, leaving only nine (9) working days for GSJ to work
through the mix of non-existent, inadequately described, and improperly assessed
violations in the Notice to Cure and timely cure any that may be appropriate.
45. Once DPNR grudgingly agreed to this minimal extension of the cure deadline, GSJ
would have had theailitythe ability during its informal meeting with DPNR on
November 16, 2016 to obtain the clarification that GSJ reasonably required in order to
implement any appropriate cures in the two (2) days of the extended cure period
remaining after that meeting.
46. However, Defendants deprived GSJ of any clarity before the expiration of the cure
period by summarily canceling the informal meeting on November 15, 2016, the day
before it was supposed to occur. By canceling that meeting and refusing to reschedule
it until November 22 or 23, 2016, a date well after the extended cure deadline,
Defendants made it impossible for GSJ to timely implement the cure of any legitimate
items during even that unreasonably short two (2) day cure window.
EFTA00583169
GS!, LLC v. DPNR et al.
Civil No.
/ 2017
Complaint
Page 13
47. Upon information and belief, Defendants' conduct in issuing a legally and factually
deficient Notice to Cure, arbitrarily imposing an unreasonably short cure period, and
refusing to clarify or even discuss the deficiencies in the Notice to Cure prior to the
expiration of that unreasonably short cure period, including by canceling the one and
only opportunity for the parties to meet before the cure period expired, was calculated
to ensure that GSJ would be unable to comply with the Notice to Cure, which
Defendants believed would justify the imposition on GSJ of a Two Hundred Ten
Thousand Dollar ($210,000) assessment pursuant to the terms of the Settlement
Agreement.
GSJ's Cures and Efforts to Mollify DPNR's Unreasonable Demands
48. Prior to the November 18, 2016 cure deadline, in correspondence dated November 17,
2016, counsel for GSJ advised DPNR of the steps that had been taken to timely cure
those of the claimed violations that were less confusingly described in the Notice to
Cure, albeit without any clarification from DPNR. [EXHIBIT KI
49. GSJ further advised DPNR that the other claimed violations could not and should not
be addressed without clarification or input from DPNR, which up to this point DPNR
had been unwilling to provide.
50. During the November 22, 2016 meeting, so as to avoid further discord with DPNR, and
to cause DPNR to lift its cease and desist order and continue to review GSJ's permits
and the requests of GSJ for additional work on Great St. James, which DPNR refused
to do while the Notice to Cure remained outstanding, GSJ:
a. Advised DPNR of the significant remedial steps taken by GSJ prior to the meeting
with regard to claimed violations, even though disputed;
EFTA00583170
GS!, LLC v. DPNR et al.
Civil No.
/ 2017
Complaint
Page 14
b. Resolved with DPNR inaccurately asserted violations and DPNR's improperly
demanded cures; and
c. Developed a plan and a reasonable timeframe within which to timely address areas
of continuing concern to DPNR, whether or not GSJ agreed that such matters were
within the scope of DNPR's authority.
51. During that meeting, as pan of the plan of action jointly developed by GSJ and DPNR,
the parties also specifically agreed on a deadline by which GSJ was to address the only
two remaining items of concern to DPNR: (1) the transport of a non-permanent,
movable covered picnic table away from its then current location on Great St. James to
a remote staging area on Great St. James; and (2) the removal of a stretch of hand-laid
stone from a pre-existing driveway on Great St. James.
52. Both the moveable covered picnic table and the hand-laid stone were removed by the
agreed upon deadline of December 1, 2016, which date was less than thirty (30) days
after GSJ's receipt of the original Notice to Cure. GSJ's cure by that date undoubtedly
was accomplished within a reasonable cure period.
53. Despite GSJ's cures on such short notice and its substantial and successful efforts to
satisfy DPNR's vague, unjustified, and unreasonable demands, on December 15, 2016,
DPNR caused a Notice of Failure to Cure Breach of Settlement Agreement &
Enforcement (the "Notice of Failure to Cure") to be served on GSJ. [EXHIBIT LI
54. None of the items asserted in the original Notice to Cure were included in the Notice of
Failure to Cure with the exception of the non-permanent, moveable covered picnic table
and the hand-laid stone in the pre-existing driveway, both of which were fully
addressed or "cured" before the Notice of Failure to Cure was issued.
EFTA00583171
GSJ LLC v. DPNR et aL
Civil No.
/ 2017
Complaint
Page 15
55. These two (2) items, which were timely cured, in the manner and within the timeframe
jointly established by GSJ and DPNR at their November 22, 2016 meeting, provided
the sole basis for DPNR's Notice of Failure to Cure.
56. Defendants violated DPNR's obligations and GSJ's rights under the Settlement
Agreement by providing a factually and legally deficient Notice to Cure, unilaterally
and arbitrarily imposing unreasonable cure deadlines, refusing to meet with GSJ or to
even discuss the deficiencies in the Notice to Cure with GSJ prior to the expiration of
the unreasonable cure deadlines, and, in the end asserting as failures to cure items
which in fact had been timely cured.
57. Defendants then improperly invoked the remedy provisions of the very Settlement
Agreement they violated in order to justify the unprecedented assessment of Two
Hundred Ten Thousand Dollars ($210,000.00) provided in the Notice of Failure to
Cure, which itself is a violation of the Settlement Agreement.'
COUNT I: BREACH OF CONTRACT
58. Plaintiff repeats and re-alleges the foregoing paragraphs of the Complaint as if fully set
forth herein.
59. The parties negotiated and entered into the Settlement Agreement, a binding and valid
contract, wherein Defendants agreed to provide written notice and a cure period in the
event Defendants believed Plaintiff was not complying with the terms of the Settlement
Agreement.
60. As the Settlement Agreement does not specify the content of the contractually required
notice or a duration for the contractually required cure period, the Settlement
On January 17, 2017, GSJ appealed the Notice of Failure to the Board of Land Use Appeals. This-aetienThe present
Complaint however, raises entirely separate causes of action derived from the breach of the contractually agreed to
Settlement Agreentent-previsieftsAgreemen.
EFTA00583172
GSI LLC v. DPNR et al.
Civil No.
12017
Complaint
Page 16
Agreement must be retisentiblr interpreted to require a cure period of a reasonable
duration after proper and adequate notice of any alleged violation to be cured.
61. The mix of non-existent, inadequately described, and improperly assessed violations
asserted by Defendants in the Notice to Cure is legally and factually deficient and does
not provide adequate notice of any of the violations asserted therein.
62. The ten (10) day cure period, including five (5) days of weekend days and one federal
and U.S. Virgin Islands holiday, unilaterally and arbitrarily imposed by Defendants in
the Notice to Cure was impossible to comply with and patently unreasonable under the
circumstances.
63. Defendants' four (4) day extension of the cure period was of negligible benefit in that
it did not confer upon GSJ a reasonable period of time within which to implement any
cures of the inadequately noticed violations, particularly in light of Defendants'
deliberate refusal prior to the expiration of the extended cure period to discuss with
GSJ the legal and factual deficiencies in the Notice to Cure and Defendants'
cancellation of the one and only meeting prior to the expiration of the cure period
during which any necessary clarification with respect to the inadequately noticed
violations might have been provided.
64. Defendants breached the Settlement Agreement by failing to provide both proper and
adequate notice of alleged violations and appropriate cures and a reasonable cure
period, as required by the Settlement Agreement.
65. Defendant further breached the Settlement Agreement by imposing on GSJ the Two
Hundred Ten Thousand Dollar ($210,000) assessment without providing such adequate
and proper notice and a reasonable cure period.
EFTA00583173
GSI LLC v. DPNR et al.
Civil No.
12017
Complaint
Page 17
66. The two violations asserted by Defendants in the Notice of Failure to Cure were in fact
timely cured by GSJ by the December I, 2016 date mutually agreed upon by GSJ and
Defendants during their November 22, 2016 meeting, and Defendants' imposition of
said assessment in the Notice of Failure to Cure based solely on those two asserted
violations constitutes a further breach of the Settlement Agreement.
67. Plaintiff has been harmed by Defendants' breaches of contract in that as a result of said
breaches, Plaintiff has been improperly and wrongfully assessed by Defendants in the
amount of Two Hundred Ten Thousand Dollars ($210,000.00), and has suffered other
harmful consequences, including DPNR's refusal to process or even consider any
applications for permits submitted by GSJ5-in-a-tetel-emeent-te-be-pcoveri-et-Ifild- The
failure to process applications based the improper actions of Defendants has caused
Plaintiff the loss of use of the island which damages are significant and accruing on a
daily basis.'- Furthermore, Plaintiff was damaged by having to remove moorings which
it had no obligation to remove and undertake other acts which should not have been
required of it. Defendants acts also caused Plaintiff to incur significant professional
fees to assist with the resolution of Defendants improper claims. The significant and
continuing damages to Plaintiff will be proven at trial.
COUNT II: VIOLATION OF GOOD FAITH AND FAIR DEALING COVENANT
68. Plaintiff repeats and re-alleges the foregoing paragraphs of the Complaint as if fully set
forth herein.
2 As a point of reference. nearby Guana island in the British Virgin Islands rents for 520.000 per day. Although
Plaintiff does not intend to rent Great St. James. Plaintiff has suffered a comparable loss per day given that the
island cannot be put to the use for which it is intended until the issues with the DPNR re resolved.
EFTA00583174
GSI LLC v. DPNR et al.
Civil No.
/ 2017
Complaint
Page 18
69. Every contract imposes upon each party a duty of good faith and fair dealing in its
performance and its enforcement.
70. Defendants breached DPNR's duty of good faith and fair dealing by providing a legally
and factually deficient Notice to Cure, unilaterally imposing an arbitrary and
unreasonably short cure period on GSJ within which Defendants knew or reasonably
should have known it would have been impossible for GSJ to cure the inadequately
noticed violations asserted in the Notice to Cure, refusing to review, discuss and clarify
with GSJ the deficiencies in the Notice to Cure before the expiration of that improper
cure period, including by cancelling a meeting with GSJ scheduled to take place prior
to the expiration of that cure period, imposing an unjustified and unprecedented Two
Hundred Ten Thousand Dollar ($210,000.00) penalty on GSJ in the Notice of Failure
to Cure for alleged violations set forth therein that Defendants knew GSJ already had
cured timely, and refusing to process or even consider applications for permits
submitted by GSJ.
7-1,Plehttiff-has-been-harmed-brDefertdarttsLbreeehtf-LIFNR2s-thitr eigeed-faith-and-fair
dealing-iri-an-ameunt-te-kie-shown-atal,
71. Plaintiff has been harmed by Defendants' breach of DPNR's duty of good faith and fair
dealing in that as a result of said breach, Plaintiff has been improperly and wrongfully
assessed by Defendants in the amount of Two Hundred Ten Thousand Dollars
($210,000.001. and has suffered other harmful consequences, including DPNR's
refusal to process or even consider any applications for permits submitted by GSJ. The
failure to process applications based the improper actions of Defendants has caused
Plaintiff the loss of use of the island which damages are significant and accruing on a
daily basis. Furthermore, Plaintiff was damaged by having to remove moorings which
EFTA00583175
GSI LLC v. DPNR et al.
Civil No.
/ 2017
Complaint
Page 19
it had no obligation to remove and undertake other acts which should not have been
required of it. Defendants acts also caused Plaintiff to incur significant professional
fees to assist with the resolution of Defendants improper claims. The significant and
continuing damages to Plaintiff will be proven at trial.
COUNT III: ACTION FOR DECLARATORY JUDGMENT
72. Plaintiff repeats and re-alleges the foregoing paragraphs of the Complaint as if fully set
forth herein.
73. The parties negotiated and entered into the Settlement Agreement, a binding and valid
contract, wherein Defendants agreed to provide written notice and a cure period in the
event Defendants believed Plaintiff was not complying with the terms of the Settlement
Agreement.
74. As the Settlement Agreement does not specify the content of the contractually required
notice or a duration for the contractually required cure period, the Settlement
Agreement must be interpreted to require a cure period of a reasonable duration after
proper and adequate notice of any alleged violation to be cured.
75. The mix of non-existent, inadequately described, and improperly assessed violations
asserted by Defendants in the Notice to Cure is legally and factually deficient and does
not provide adequate notice of any of the violations asserted therein.
76. The ten (10) day cure period, including five (5) days of weekend days and one federal
and U.S. Virgin Islands holiday, unilaterally and arbitrarily imposed by Defendants in
the Notice to Cure was impossible to comply with and patently unreasonable under the
circumstances.
EFTA00583176
GS!, LLC v. DPNR et al.
Civil No.
/ 2017
Complaint
Page 20
77. Defendants' four (4) day extension of the cure period was of negligible benefit in that
it did not confer upon GSJ a reasonable period of time within which to implement any
cures of the inadequately noticed violations, particularly in light of Defendants'
deliberate refusal prior to the expiration of the extended cure period to discuss with
GSJ the legal and factual deficiencies in the Notice to Cure and Defendants'
cancellation of the one and only meeting prior to the expiration of the cure period
during which any necessary clarification with respect to the inadequately noticed
violations might have been provided.
78. Defendants breached the Settlement Agreement by failing to provide both proper and
adequate notice of alleged violations and appropriate cures and a reasonable cure
period, as required by the Settlement Agreement.
79. Defendant further breached the Settlement Agreement by imposing on GSJ the Two
Hundred Ten Thousand Dollar ($210,000) assessment without providing such adequate
and proper notice and a reasonable cure period.
80. The two violations asserted by Defendants in the Notice of Failure to Cure were in fact
timely cured by GSJ by the December I, 2016 date mutually agreed upon by GSJ and
Defendants during their November 22, 2016 meeting, and Defendants' imposition of
said assessment based solely on those two asserted violations constitutes a further
breach of the Settlement Agreement.
81. Plaintiff has been harmed by Defendants' breaches of contract in that as a result of said
breaches, Plaintiff has been improperly and wrongfully assessed by Defendants in the
amount of Two Hundred Ten Thousand Dollars ($210,000.00).
EFTA00583177
GSI LLC v. DPNR et al.
Civil No.
12017
Complaint
Page 21
82. Furthermore, DPNR's refusal to process or even consider any applications for permits
submitted by GSJ is causing GSJ further damages by indefinitely delaying the progress
of construction and improvements on Great St. James.
83. Accordingly, pursuant to V.I. CODE ANN. tit. 5, §§ 1261-1272, Plaintiff seeks a
judgment declaring that Plaintiff is entitled under the Settlement Agreement to
adequate notice of any violations asserted by DPNR and a reasonable period of time
within which to cure the same after receiving such notice, that Defendants provided
neither adequate notice of asserted violations under the Settlement Agreement nor a
reasonable period of time within which to cure the asserted violations, and that, as a
result of the same, Defendants violated the Settlement Agreement.
84. Additionally, Plaintiff further seeks a judgment declaring that the Notice of Failure to
Cure, being based upon and itself constituting a breach of the Settlement Agreement
by Defendants, is outside the scope of and an unlawful exercise of Defendants'
authority, as is the demand thereunder for GSJ to make payment of the Two Hundred
Ten Thousand Dollar ($210,000.00) penalty improperly imposed therein.
85. Additionally, Plaintiff further seeks a judgment declaring that DPNR's refusal to
process or even consider any applications for permits submitted by GSJ, asserted by
Defendants as being justified based on the unresolved Notice of Failure to Cure and
non-payment of the Two Hundred Ten Thousand Dollar ($210,000.00) assessment
imposed therein, is also outside the scope of and an unlawful exercise of Defendants'
authority, and directing DPNR to consider and process GSJ's applications for permits.
86. Lastly, Plaintiff seeks declaratory judgment finding that DPNR unlawfully trespassed
on to Plaintiff's property and clarifying to rights and scope of powers of the DPNR to
EFTA00583178
LLC v. DPNR et aL
Complaint
Civil No.
/ 2017
Page 22
enter Plaintiff's property in the future, including when entry may be made, for what
purpose, and under what conditions (including reasonable notice provisions).
WHEREFORE, Plaintiff seeks all damages to which it is entitled, including contractual,
compensatory, punitive and equitable damages, and declaratory relief, as well as an award of its
costs and reasonable attorneys' fees, and any pre and post judgment interest to which it is entitled.
Respectfully,
Dated: March 4422, 2017-
ERIKA A. KELLERHALS, ESQ.
CHRISTOPHER ALLEN KROBLIN, ESQ.
MARJORIE WHALEN, ESQ.
V.I. Bar Nos. 849, 966 & R2019
KELLERHALS FERGUSON KROBLIN PLLC
Royal Palms Professional Building
9053 Estate Thomas, Suite 101
St. Thomas, V.I. 00802
Telephone: (340) 779-2564
Facsimile: (888) 316-9269
Email:
EFTA00583179
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Phone Numbers
Document Details
| Filename | EFTA00583158.pdf |
| File Size | 1353.9 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 39,868 characters |
| Indexed | 2026-02-11T22:50:11.427356 |