EFTA00583500.pdf
PDF Source (No Download)
Extracted Text (OCR)
JE Punch List —June 13, 2012
1. Five Palms —TOP PRIORITY
- Exterior Door Shutters — removable option
- Painting - outside to be completed after visit
- Furniture — Sofa — leather samples JE will review while on site
- Piano - needs tuner
- Lights - add two more lights to front of Five Palms in trees
- palm tree lights, change dimmer, solar
- Mirrored siding — Panels on STT 6/12
- Glue on site
- Tapestry Molding for Ceiling — Ion
- Transformer building — Building 5/31, 5/25 — final electrical hookup 6/8 — temporarily powered by generator
- Flooring
- Fire pit — gas unit needs to be returned and reordered
- Books — books on site will relocate over the week of 6/4
- Benches — one bench to west north of fire pit
- Road grading
- Piano — at Tropical FL 6/8 — scheduled to sail 6/13, EDA on STT 6/16
2. Grotto —
- Floor resin
- Genset wiring — scheduling to be determined
3. Berm/Top of Hill
- dirt and rock needs on top of hill needs to go ASAP
- hydroseed top of hill
— 4 large planter boxes with small planter inside require construction — size to be determined by JE
- cleanup and excavate — continues
- remove rock screener — completed
- run power to berm center from pull box
4. Engineering/Maintenance Yard
- Steel Shed — foundation in progress
- Metal Sheets - on old building will be replaced week of 6/4
5. Triangle — landscaping direction required from JE
6. Flagpole Pool Cabana -
- Recovering of sofa/chairs
- Furniture — needs new desk — Sarah
7. Entry Tree Lights — installation complete
8. Solutions for Generators — Sound proofing solution forwarded to JE, require direction, wall built
9. Tiki — Darren is contacting the vendor regarding the shields
10. Dock —
- Decking — replace all damaged boards and carpet - complete
- Floating Dock —
- Jet ski Docking - review
- Table/Dock Box — Bill starting 6/4
11. Kite House — review of wooden outside furniture - Sarah
12. Chillax Room — requires furniture piece for electrical/media equipment — Sarah
13. Chillax Bathroom - requires blue rugs for bathroom & vanity area — Sarah
14. Mechanical Building
- Replacement Transformer — estimated date to be shipped from factory (Illinois) 8/21
EFTA00583500
15. Boats
- Midnight Express — purchase Yamaha 300 motors, install by Offshore Marine
- PRD— sell
- Lady G — sell
- Big N - sell
- Calypso — refurbish
16. Gym Road - road grading after Five Palms — continues
17. Timers — review installing timers on air conditioners, irrigation water systems, and lights
18. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond
and beach
19. Pergolas— construct 3 pergolas for benches at the top of the hill —continues
20. Main entrance/gravel/grade - complete
21. Wind Door — wind door on kitchen side needs adjusting
- wind door stops
22. Landscaping— gardenias
23. Solar lights
24. Roads— grade all roads — Wednesday 6/6 — Tom - please review all roads so you can pitch, drain, with Jules
25. Library — lights on bookshelves need attention
- temperature?
26. Main hill — asphalt path
27. Master Suite -
- Large master bed planting
- Door in dressing area — the heavy mirrored door between the bed and bath is beginning to drag on the floor
- Add door handles to shutters on master bedroom door to be able to close from inside
28. Phones-
- Library terrace — phone does not work — repaired 6/11
- Flagpole— phone in cabana has all the wrong numbers as compared to the list on speed dial — label replaced
29. Media — sign up for Blockbuster — does not provide service outside of the US
- VUDU — problem with the BluRay player - Jermaine has call in to tech support 6/11
- HULU — account established and active
EFTA00583501
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA00583500.pdf |
| File Size | 112.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,757 characters |
| Indexed | 2026-02-11T22:50:13.940429 |