Punch List — per JE directives as of December 24, 2011
1. Chillax room
— Motion detector switch — should only have one light switch — Gary Moses
- Red and blue rug to be tried — the pillows may be the source of the smell
2. Flagpole pool
- Take the pool cleaners out
- Scuppers are either rusted or broken — please send photo to Bart
- Rug
3. Banquette — two tree lights near banquette
4. Gym
- Gutter is leaking in the front
- Gym gutter corner
5. Flagpole bath and cabana — refrigerator 24" wide, 23" deep, stainless steel, and door swing on right - Brice
ordered - robe hook outside shower -pool pump insulation for domestic fresh water distribution pump on
order — walkway gates schedule — Bill
6. Electrify Info center
7. Five Palms — JE approved height — Tom — two high windows
8. Grotto
- Greenhart wood — steps to Grotto
9. Heli wall
10. Big wind doors lighting - 2 recessed ceiling lights centered on each side of the doors — set on sconce timer
11. St. John terrace lights — change lights
12. Hangar —floor sanding in progress — 40'X50' area for slab, 3 foot wall around it — containment for ISO fuel
tank — bathroom and room divider
13. Plants bought from Italian woman
14. Steel shed for the new workshop area
15. Triangle
16. Entry tree lights
17. Pebble beach - Solar fridge, light, fan for pebble beach
18. Humidifiers — Atlanta Refrigeration speaking to Trane — date?
19. Yellow flowering Alamandra up Old Mill wall and Flagpole hill
20. Beach 3 — containers into back of hill — Peter to grade out
21. Solutions for generators — no provisions for sound dampening — design fault — Maguire contract will be
emailed to Gary, Tom, Darren, Brice for research into the matter — Brice adjusted shutter
22. Fire system — not working, Brice creating fire charts for the island
23. Too of hill — CLEAN UP - place garbage in circle — build up 10 feet — new helipad
24. Pool — tile — Bart — JE selected — LSJ orders — Brice to find out Bart's schedule
25. Library windows
— K&S researching stainless steel alternatives, or could fabricate 2 windows — hinge open, bolt latch, weather
stripped
- Library windows resealed
26. Nursery
- Clean
- Open pull box
- Use only for flower production for the rooms
27. Five Palms
- Floor
- Doors location
28. St. John terrace - lights
EFTA00583649
29. Pool
- Equipment and insulation
- Redo
- Heater rooms
30. Tree transplants
31. Guestroom - door knobs
32. Tiki
— Shields and kitchen
— Stainless cabinets installed
- Back garden
33. Sunken garden berm
34. Concrete roads at flagpole
35. Concrete triangle
36. Compass
37. Bench placements
38. Cabana 1- roof
39. Master bedroom — replace roof screws
40. Master landscaping—jasmine path
41. Engineering
- Cleaned
- New steel building
42. New vehicles
43. Paint ballet and yoga room
44. Shower doors
45. Lighting-adjust landscape lights at night
EFTA00583650
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00583649.pdf |
| File Size | 82.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,921 characters |
| Indexed | 2026-02-11T22:50:17.575213 |