EFTA00583834.pdf
Extracted Text (OCR)
L.S.J., LLC
6100 Red Hook Quarter
Suite B-3
St Thomas, USVI 00802
340-775-8100
FOR SETTLEMENT PURPOSES ONLY
January _,2012
Mr. Rex Wolterman
Mr. Bart Wolterman
Virgin Islands Gunite Pools
25 America-Anchorage Condos
St. Thomas, USVI 00802
Dear Messrs. Wolterman
This is to confirm and constitute the agreement by and between Virgin
Islands Gunite Pools ("VIGP") and L.S.J., LLC ("LSJ") regarding the installation of tile
and related work to resolve disputes between the parties about the existing pool on
the main compound at Little St. James Island (the "Main Pool"), the completion of
work to resolve issues between the parties about the pool at the Flagpole area
located on Little St James Island (the "Flagpole Pool"), both of which have been
constructed by VIGP, the completion of work to address issues between the parties
relating to the operation and improper location of the heaters for the Main Pool and
the Flagpole Pool, and the completion of work to correct of any other currently
known warranty items in respect of the Main Pool and/or the Flagpole Pool
(collectively, the "Work"). With respect to the Work, VIGP and LSJ have agreed as
follows:
1.
VIGP will perform the Work, details of which are provided in the Scope of
Work attached as Scheduled A hereto (the "Scope of Work"), including, without
limitation, by providing all labor, equipment and tools necessary to perform and
complete the Work in accordance with the provisions contained in this letter
agreement
2.
VIGP will supply all materials necessary to perform and complete the Work
in accordance with the provisions contained in this letter agreement, except that LSJ
shall provide at its cost the following materials to enable VIGP to perform and
complete the tiling of the Main Pool:
•
100sq. ft. Waterline tile
EFTA00583834
•
3000 sq. ft. interior tile
•
90 bags thin set (gray)
• 10 gallons bonder
•
5 bags lime
•
12 bags common cement
•
30 bags sanded grout - color is up to you
•
Sand
In addition, LSJ will provide at its cost the additional items which it is expressly
stated to provide on the Scope of Work.
3.
VIGP shall perform the Work generally in accordance the schedule specified
on the Scope of Work
4.
LSJ shall pay VIGP a total sum of $60,000 to perform the Work in accordance
with the provisions contained in this Agreement (the "Resolution Payment"). LSJ
shall pay VIGP the Resolution Payment in 4 equal installments of $15,000, as and
when provided below:
•
$15,000 shall be paid upon execution of this letter agreement by both VIGP
and LSJ and prior to the commencement by VIGP of any Work under this
letter agreement
•
$15,000 shall be paid upon the completion of: (1) items 1 through 12
relating to the Flagpole Pool in the Scope of Work, and (2) items 1 through 4
relating to the Main Pool in the Scope of Work
•
$15,000 shall be paid upon completion of items 5 and 6 relating to the Main
Pool in the Scope of Work
•
$15,000 shall be paid within thirty (30) days after completion of all items
contained in the Scope of Work
It is agreed that payment of the Resolution Payment in accordance with the above
schedule is in satisfaction of any outstanding balances claimed to be due and
payable by LSJ to VIGP under any and all prior agreements between them in respect
of the Main Pool or the Flagpole Pool (the "Pool Agreements"). It is further agreed
that the provisions of this letter agreement are intended to resolve all current
outstanding disputes between VIGP and LSJ with respect to the work and
outstanding balances claimed to be due on the Main Pool and the Flagpole Pool.
5.
All work performed in connection with this Agreement shall be performed
and completed in a professional and workmanlike manner in accordance applicable
industry standards. In addition, re-plastering work on the Flagpole Pool will
conform to Southern Grouts and Mortars specifications on color variations. In the
event of any disagreement as to whether any item on Scope of Work has been
completed, such disagreement shall be resolved by reference to the foregoing
standards and specifications.
EFTA00583835
6.
The parties agree that completion of the items contained in the Scope of
Work will resolve all currently known warranty items under the Pool Agreements.
Subject to the previous sentence, and except as otherwise modified by the express
provisions contained in this letter agreement, the provisions of the Pool
Agreements, including, but not limited to, the warranty provisions contained in
paragraph 4 of the Pool Agreements, shall remain in full force and effect.
7.
This Agreement may only be changed, modified or amended by an agreement
in writing, signed by the parties hereto.
8.
This Agreement may be executed in counterparts, each of which shall be
deemed an original, but both of which together shall constitute one and the same
instrument
9.
This Agreement shall be governed by, and construed in accordance with, the
laws of the United States Virgin Islands, applicable to contracts executed and to be
fully performed therein, without giving effect to its principles of conflicts of law.
If the foregoing correctly sets forth our mutual understanding and agreement
with respect to the Work, please so signify by signing this letter in the space
provided below, whereupon this letter shall become a valid and binding agreement
between us.
Sincerely,
L.S.J., LLC
By:
Authorized Representative
AGREED AND ACCEPTED BY:
VIRGIN ISLANDS GUNITE POOLS
By:
Bart Wolterman
EFTA00583836
SCHEDULE A
SCOPE OF WORK
FLAGPOLE POOL
1. The plaster pumping operation shall be performed from road south side of pool
over a protected surface.
2. All walls, tile, deck and finish surfaces at the pool area shall be covered and
protected during construction.
3. Pool is to be drained by 1/16
4 Complete all pool preparation to enable pool to receive new plaster. This is to
include all necessary chipping, grinding, cuffing and patching, replacement of
damaged water line tile (LSJ shall provide replacement tiles currently on site, if
necessary), cleaning, priming, etc. Work anticipated to take place 1/17 - 1/25 ,
5 Properly adjust light fixtures in the pool.
6 . Plaster delivery anticipated approx 1/24
7
Repair scupper support plate including cope stone tile replacement above
scupper support plate, if necessary.
8 Relocation of heat pumps to outside slab beginning 1/17 This shall include saw
cutting of existing slab, demolition, installation of new water supply and return
lines, electric rough-in and service to new location on new slab. New concrete slab
to be provided by LSJ
9 Re-plaster pool. Anticipated to take place 1/26 - 1/28
10 Refill pool. Water to be supplied by LSJ. Anticipated to take place 1/29
11 Chemical balancing for 30 days after filling pool.
12 Clean up of work areas to dumpster
MAIN POOL
1. Drain pool by 1/27
2. All walls, tile, deck and finish surfaces at the pool area shall be covered and
protected during construction.
3. Relocation of heat pumps to outside slab beginning 1/27 This shall include saw
cutting of existing slab, demolition, installation of new water supply and return
lines, electric rough-in and service to new location on new slab. New concrete slab
to be provided by LSJ
4. Remove waterline tile, prep pool to receive new tile, which includes all necessary
chipping , grinding, cutting and patching, cleaning, priming, etc.
5. Install new waterline tile (approx delivery 1/27)
6. Install new pool tile (approx delivery date 2/6)
7. Grout all tile
8. Detail all interior pool work prior to filling
EFTA00583837
9. Refill pool. Water to be supplied by LSJ. Anticipated to occur approximately (
2/27)
10. Chemical balancing for 2 wks after filling.
11. Clean up to island dumpster
For both of the above projects, LSJ will provide port-o-let, equipment assistance
with unloading plaster, dumpster at hill top , and 1 1/2 " pump and hose to empty
pools.
EFTA00583838
Document Preview
Extracted Information
Phone Numbers
Document Details
| Filename | EFTA00583834.pdf |
| File Size | 266.5 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 8,068 characters |
| Indexed | 2026-02-11T22:50:18.947869 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.