JE Punch List —October 18, 2012
1. Clean Up - make as many barge runs as necessary
2. Equipment and Vehicles
- Sell equipment
- No machinery off the island unless approved
- Red Polaris Bike - Power Steering Module — due on site 10/22
- Lull — Quote received from AMEX had incorrect part U. Reviewing replacement parts/Numbers with another vendor
3. Five Palms
- Outside furniture — tie down cushions to resolved wind issues - COMPLETE
- Picture frame — on site, 86 x 70 -
to forward selected picture, will frame locally
- Mirrored siding — 3 more sections have fallen off, will continue to reglue if possible — new sections ordered
- Piano re-tuning — Patrick Baron 10/20
4. Grotto
- Mattress cover — completion expected 10/30
5. Berm/Top of Hill
- Hydroseed all top of hill/berm — COMPLETE - rain continues to wash away seed in areas
6. Triangle
- Must design triangle — awaiting JE direction
- Palms will be relocated on once Lull is repaired
7. Flagpole Pool Cabana
- Furniture — desk from Paris — JE selected fabric forwarded to
- Pace clock — unit rusted — ordered 2 new units - 1 for backup
- Auto closer on toilet door — on carpenter's scope of work
- Add some lights near steps — COMPLETE — JE to review when on site
8. Floating Dock
- Jet ski bumpers — complete — this installation has not resolved the issues of protecting the jet skis
- Sea-Do Jet Ski — will need to review how this unit will be secured at dock
- Dock box top — one final attempt to refinish — on carpenter's scope of work. Top and seat have been stripped &
resanded, working on undersurface
- Dock boxes — struts to be replaced — on carpenter's scope of work
- "Walk the plank" option — review material on this & floating dock — "rubberized material"
9. Chillax Room
— Requires furniture piece for electrical/media equipment.
forwarded a selection 9/28 & 10/1 —awaiting
direction
10. Chillax Bathroom
- blue rugs for bathroom & vanity area — please note attached photo showing existing rug which has softened &
flattened out since its installation. Would suggest review when on site before purchasing
11. Mechanical Building Transformer — on site, to be changed out 10/24
12. Boats
- Lady G — sell — will remain at Nanny Cay until sold
- Big N — repair at AYH dock in progress
13. AC - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees
14. Transient Surge Protection — on site 10/18
15. Landscaping — Peter's List
- High road trees - COMPLETE
- High road waterfall — rocks to be installed
- Line all roads with stones
- Pop's Garden — require deer protection — Larry will bring electric fencing on plane
- Shade cloth — adjustments made, have shade cloth to the ground, reviewing propagation of seeds which were
planted 10/16. Josephine on site 10/22
EFTA00584394
- Clean mess, cut grass; trim all vines, acacia — owner's drive, blue beach, gym — work in progress
- Peter to clean the sides of the road — work in progress
- Black Heli Under Pads — install at top of bike path at MC —1,206 sq. ft — Rich reviewing
- Review growth of sea grape - engineering area
- Hydroseed all pull box areas & engineering - COMPLETE
- Take down the ropes at the end of the month on the trees
16. Roads
- General re-grading of roads — ongoing — Peter
- Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to
review with JE when on site
17. Library
- AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor
18. New Employee Bathrooms
19. Gym
- New punching bag — installation of the speed bag - on carpenter's scope of work
- New front & back doors installation — on carpenter's scope of work
20. Beach Office
- complete electrical overall required
- waterproofing/sealing/painting/replace rotten wood — on carpenter's scope of work
21. LSJ Mooring — Darren spoke with Army Corp 10/17 — still working on environmental report, will forward ASAP
22. Hangar
- Fuel Containment Pad — via Cecile 10/17 the following steps required — accept Wilson Environmental Inc's EPS Spill
Plan. Complete Earth Change & Building Permit Applications, submit applications (3 copies), with 3 copies forwarded to
DPNR & submit copy of plan to VIPA. Drawing Package forwarded to Tom Melnick for a bid 10/18
23. Steel shed — Buck Steel drawings on site. JE requested that American Steel cost out the price for a new shed also
requesting cost of removal of existing bolt pattern & epoxy in new anchors
24. Equipment to be Purchased
- (1) Light generator, (2) arms with lights to be hard wired — purchased — awaiting delivery to Tropical
- (1) Skid steer forks, purchased — awaiting delivery to Tropical
- (1) John Deere box and blade — ordered — awaiting delivery to Tropical
- (1) man-lift — Rich reviewing offer
- (2) Golf cars — 2 seater — purchased — delivery to Tropical estimated by 10/19
- (1) dump truck — 2012 Ford F450 — on site
- (1) mini excavator — quote received from AMEX - $38,900 — reviewing other options
- (1) Jet Ski trailer — on site
25. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16
26. Containers — 2 off site 10/18, 3'd leaving LSJ 10/20. RO & Generators in remaining container
27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ
28. Part Time Employees — focus on finding housekeepers — have interviewed 6 more applicants, Anna has made
contact with 4 additional applicants, as of date no potential candidates. Anna has located a local placement company,
who can provide housekeepers, appointment scheduled 10/19.
29. Heli Pad - reinstall windsock to north side of helipad - wind sock for Heli pad on LSJ is ordered and will arrive next
week in Palm Beach
30. Cisterns — need to be cleaned/sealed. Vendor on site 1020 to review scope of work
31. Solar - lights installation COMPLETE - JE does not like the "white light", likes a "soft white" light — JE to review when
on site
- Solar quote reviewed with Rich, submitted to JE 9/17 — now researching line loss on cable, awaiting update
32. Master Bedroom — door sliders require waxing and alignment — on carpenter's scope of work
EFTA00584395
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00584394.pdf |
| File Size | 159.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 6,246 characters |
| Indexed | 2026-02-11T22:50:25.242455 |