JE Punch List — October 30, 2012 1. Clean Up - make as many barge runs as necessary 2. Equipment and Vehicles - Sell equipment - No machinery off the island unless approved - Red Polaris Bike - Power Steering Module Installation - COMPLETE - Lull — replacement parts — due at Tropical 11/1, unable to sail until 11/7 due to value over $2,500 3. Five Palms - Picture frame — on site, 86 x 70 - to forward selected picture, will frame locally - Mirrored siding — will continue to reglue as sections fall off - 17 new sections/glue — ETA on LSJ 11/2 4. Grotto - Mattress cover — completion delayed due to owner travelling to northeast — family issues, will update ASAP 5. Berm/Too of Hill - Hydroseed all top of hill/berm — COMPLETE — Brice investigating a different material 6. Triangle - Must design triangle - awaiting JE direction - Palms will be relocated once Lull is repaired 7. Flagpole Pool Cabana - Furniture — desk left Paris, awaiting ETA to STT - Pace clock — ordered 2 new units -1 for backup — due on site 11/8 - Auto closer on toilet door — David (carpenter) - COMPLETE - Add some lights near steps — COMPLETE — JE to review when on site 8. Floating Dock - Jet ski bumpers — COMPLETE — this installation has not resolved the issues of protecting the jet skis - Sea-Do Jet Ski — will need to review how this unit will be secured at dock - Dock box top & seat — one final attempt to refinish — David (carpenter) — COMPLETE will reinstall 11/2 - Dock boxes — struts to be replaced — David (carpenter) — box lids keep breaking down/rotten wood when struts installed — will review when JE on site - Dock & Floating Jet Ski Dock Carpet - due to leave Tropical 11/31 — David (carpenter) will install 9. Chillax Room — Requires furniture piece for electrical/media equipment - forwarded a selection 9/28, 10/1 & 10/30 —awaiting direction 10. Chillax Bathroom - walls in vanity area to be painted — JE to select color 11. Mechanical Building Transformer — changed out - COMPLETE 12. Boats - Lady G — sell — will remain at Nanny Cay until sold - Big N — repair at AYH dock in progress —hydraulic hoses due Tropical 10/31, boxes to be installed 10/30, painting to be begin 10/29, electrical refurbishment 80% complete. Cylinders to be installed on LSJ — will discuss timing when JE 13. AC - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees 14. Transient Surge Protection —Tropical shipped to Nassau in error - EDA on STT by 11/6 15. Landscaping — Peter's List - High road waterfall — rocks to be installed - Line all roads with stones - Pop's Garden — require deer protection —Electric Fencing due at Tropical 11/31 - Shade cloth — reviewing propagation of seeds which were planted 10/16. Suggest raised planter beds, using tables from nursery - Peter to clean the sides of the road — work in progress - Black Heli Under Pads — install at top of bike path at MC — ETA on LSJ 11/2 - Review growth of sea grape - engineering area — transplanting has not worked — review purchasing small plants EFTA00584498 - Take down the ropes at the end of the month on the trees — COMPLETE 16. Roads - General re-grading of roads — ongoing — Peter - Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Researching porous concrete option, water drains thru surface, used on St John & St Thomas 17. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, ETA 11/16 18. New Employee Bathrooms 19. Gym - New punching bag — installation of the speed bag - David (carpenter) — old unit removed awaiting direction from JE - New front & back doors installation — David (carpenter) — COMPLETE 20. Beach Office - complete electrical overall required - waterproofing/sealing/painting/replace rotten wood — David (carpenter) — will begin 10/28 21. LSJ Mooring — Darren spoke with Army Corp 10/17 — still working on environmental report, will forward ASAP 22. Hangar - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered. Removal of existing bolts patterns & installation of new - David (carpenter) 24. Equipment Purchased - (3) Terex RL-4000 6kW Light Tower systems — due to arrive at Tropical 10/31 - (1) Skid steer forks — due to arrive at Tropical 10/31 - (1) 2012 John Deere 5101E tractor with 553 loader and 8' blade — delivered to Tropical 10/25 — will sail as soon as space is available - (1) 2003 Genie Z60/34 Boom lift — ETA Tropical 11/9 - (2) 2013 S4-Express electric golf cars — ETA on LSJ 11/2 - (1) 2012 JCB 8035Z Mini Excavator purchased - $39,455 — at Tropical. Awaiting bucket from UK, expected ETA STT 11/10 25. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production — ETA STT 11/12 26. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as time permits 28. Part Time Employees — focus on finding housekeepers — have a potential candidate, working the next week. Employment Company Anna found was unable to provide anyone. Advertising 29. Heli Pad - wind sock for Heli pad on site. New wind sock assembly ordered by Larry awaiting ETA 30. Cisterns — need to be cleaned /sealed. Vendor on site 10/20 to review scope of work — quoted expected 11/1 31. Solar - installation COMPLETE - JE does not like the white light", prefers soft white light — JE to review when on site - Revised proposal from Pure Logic submitted to JE via email 10/22 32. Master Bedroom — door sliders require waxing and alignment — David (carpenter) - COMPLETE EFTA00584499

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA00584498.pdf
File Size 157.1 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 5,970 characters
Indexed 2026-02-11T22:50:26.662959
Ask the Files