Back to Results

EFTA00586313.pdf

Source: DOJ_DS9  •  email/partial  •  Size: 46.7 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

Memorandum To: Jeffrey Epstein From: Emad Hanna Date: 07-18-05 Re: LSJ Project # 27 Landscape Lights Paul Gandy mentioned the original survey called for a little over 1 mile of pathway lighting only would be around $ 100,000, which he admitted that he made a mistake on and it is his fault. He stated in an e-mail dated 7-14 (see attached copy) that his estimate is about $ 200,000 higher than originally anticipated. Upon receiving the new site plan based on the specs given to Miles, which included the following: 1) Increase the total pathway length to nearly 4 miles 2) Utility conduits and duct banks for future facilities 3) Irrigation water 4) Communication lines It was determined to have all utilities in a common trench. Gandy estimates the lighting project only to take about 4 months at a cost of $ 430,000 and the lighting and duct bank to take about 9 months at a cost of $ 1,000,000. Thank you, Emad EFTA00586313

Document Preview

Extracted Information

People Mentioned

Dates

Document Details

Filename EFTA00586313.pdf
File Size 46.7 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 949 characters
Indexed 2026-02-11T22:50:41.417129

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files