EFTA00587280.pdf
PDF Source (No Download)
Extracted Text (OCR)
MALLORY LANDSCAPE AND DESIGN
Phoneme
Fax
PROPOSAL FOR ZORRO RANCH
March 27, 2013
DRIVE ENTRY AND PARKING COURT
MISCELLANEOUS WORK
Remove one ponderosa pine including root ball. Remove 5 grasses, 8 spirea, and 12 mahonia.
SOIL REMOVAL
Remove 12" of soil in planting beds totaling 389 square feet. Disburse on site.
NEW TOPSOIL
Install a total of 10 yards of topsoil in planting beds where soil was removed. The topsoil will be
harvested from the ranch and delivered in close proximity to the planting beds. Eight inches of
soil will be installed in each area.
SOIL PREPARATION
Prepare planting beds measuring 389 square feet to a depth of 12" with the addition of 2" of
Back to Earth mulch or similar and 2" of perlite. A mixture of Yum-Yum mix and Planters II
trace minerals will be mixed into the soil. The fertilizer will be added at a rate of 20 pounds per
100 square feet of planting bed.
PLANT MATERIAL
Install the following plant material : 10 Dark Night spirea, 7 mahonia, 3 four foot tall viburnum,
3 Broadmoor juniper, 9 miscanthus grass, 20 mahonia compacta, 2 eight foot tall pinons, and one
12-15' tall ponderosa pine.
DRIP IRRIGATION
Install drip irrigation to all newly installed plant material. The existing drip zone in this area will
be utilized.
PECAN SHELL MUCLH
Install pecan shell mulch in all planting beds measuring 1080 square feet.
COST BREAKDOWN
Miscellaneous Work
$ 455
Soil Removal
$ 350
New Topsoil
$ 350
Soil Preparation
$ 1,460
Plant Material
$ 7,310
Drip Irrigation
$ 185
Pecan Shell Mulch
$ 1.080
AREA TOTAL
$11,190
EFTA00587280
NORTH PERIMETER
MISCELLANEOUS WORK
Install two yards of topsoil in the stipa grass beds to raise the soil level. In the winter months,
install a bio-mat over the planting bed containing the lamiastrum to protect against freeze
damage.
SOIL REMOVAL
Remove 12" of soil in planting beds totaling 360 square feet. Disburse on site.
NEW TOPSOIL
Install a total of 6.5 yards of topsoil in planting beds where soil was removed. The topsoil will
be harvested from the ranch and delivered in close proximity to the planting beds. Eight inches
of soil will be installed in each area.
SOIL PREPARATION
Prepare planting beds measuring 360 square feet to a depth of 12" with the addition of 2" of
Back to Earth mulch or similar and 2" of perlite. A mixture of Yum-Yum mix and Planters II
trace minerals will be mixed into the soil. The fertilizer will be added at a rate of 20 pounds per
100 square feet of planting bed.
PLANT MATERIAL
Install the following plant material : 64 lamiastrum, 15 Kelseyi dogwood, and 1 Isanti dogwood.
DRIP IRRIGATION
Install drip irrigation to all newly installed plant material. The existing drip zone in this area will
be utilized.
PECAN SHELL MUCLH
Install pecan shell mulch in all planting beds measuring 620 square feet.
COST BREAKDOWN
Miscellaneous Work
Soil Removal
New Topsoil
Soil Preparation
Plant Material
Drip Irrigation
Pecan Shell Mulch
$ 350
$ 315
$ 230
$ 1,350
$ 1,985
$ 280
$ 620
AREA TOTAL
$ 5,130
EFTA00587281
NORTH GARDEN
MISCELLANEOUS WORK
Remove 57 grasses, 8 spirea, and 1 dogwood. Pot and hold 36 nepeta. Take all debris to
landfill.
SOIL REMOVAL
Remove 12" of soil in planting beds totaling 756 square feet. Disburse on site.
NEW TOPSOIL
Install a total of 19 yards of topsoil in planting beds where soil was removed. The topsoil will be
harvested from the ranch and delivered in close proximity to the planting beds. Eight inches of
soil will be installed in each area.
SOIL PREPARATION
Prepare planting beds measuring 756 square feet to a depth of 12" with the addition of 2" of
Back to Earth mulch or similar and 2" of perlite. A mixture of Yum-Yum mix and Planters II
trace minerals will be mixed into the soil. The fertilizer will be added at a rate of 20 pounds per
100 square feet of planting bed.
PLANT MATERIAL
Install the following plant material : 27 nepeta, 8 Dark Night spirea, 18 blue avena grass, 80
geranium, 19 horizontal cotoneaster, and 1 red twig dogwood.
DRIP IRRIGATION
Install drip irrigation to all newly installed plant material. The existing drip zone in this area will
be utilized.
PECAN SHELL MUCLH
Install pecan shell mulch in all planting beds measuring 1564 square feet.
COST BREAKDOWN
Miscellaneous Work
Soil Removal
New Topsoil
Soil Preparation
Plant Material
Drip Irrigation
Pecan Shell Mulch
$ 455
$ 770
$ 665
$ 2,835
$ 4,020
$ 535
$ 1,565
AREA TOTAL
$10,845
EFTA00587282
EAST TERRACES
MISCELLANEOUS WORK
Remove 3 junipers with root balls, transplant 3 hawthornes, and transplant 50 perennials. Take
all debris to landfill.
SOIL REMOVAL
Remove 12" of soil in planting beds totaling 2015 square feet. Disburse on site.
NEW TOPSOIL
Install a total of 50 yards of topsoil in planting beds where soil was removed. The topsoil will be
harvested from the ranch and delivered in close proximity to the planting beds. Eight inches of
soil will be installed in each area.
SOIL PREPARATION
Prepare planting beds measuring 867 square feet to a depth of 12" with the addition of 2" of
Back to Earth mulch or similar and 2" of perlite. A mixture of Yum-Yum mix and Planters II
trace minerals will be mixed into the soil. The fertilizer will be added at a rate of 20 pounds per
100 square feet of planting bed.
PLANT MATERIAL
Install the following plant material : 780 lavender and 44 moonlight broom.
DRIP IRRIGATION
Install drip irrigation to all newly installed plant material. The existing drip zone in this area will
be utilized.
PECAN SHELL MUCLH
Install pecan shell mulch in all planting beds measuring square feet.
COST BREAKDOWN
Miscellaneous Work
$ 1,830
Soil Removal
$ 1,470
New Topsoil
$ 1,750
Soil Preparation
$ 7,555
Plant Material
$17,445
Drip Irrigation
$ 2,890
Pecan Shell Mulch
$ 2,015
AREA TOTAL
$34,955
EFTA00587283
BOWL GARDEN
SOIL PREPARATION
Prepare planting beds measuring 1010 square feet to a depth of 12" with the addition of 2" of
Back to Earth mulch or similar and 2" of perlite. A mixture of Yum-Yum mix and Planters II
trace minerals will be mixed into the soil. The fertilizer will be added at a rate of 20 pounds per
100 square feet of planting bed.
PLANT MATERIAL
Install the following plant material : 15 stipa grass, 60 veronica liwanensis, 150 penstemon
pinifolius, 60 penstemon strictus, 90 penstemon eatonii, 225 veronica pectinata, and 90
delosperma nubigium.
This plant material will be watered by an existing sprinkler system. Therefore there is no charge
for drip irrigation in this area.
Soil Preparation
Plant Material
COST BREAKDOWN
$ 3,790
$ 4,415
AREA TOTAL
$ 8,205
EFTA00587284
SOUTHEAST SIDE
MISCELLANEOUS WORK
Remove one juniper with root ball. Pot and hold 46 columbine and 9 nepeta. Take debris to
landfill.
SOIL REMOVAL
Remove 12" of soil in planting beds totaling 867 square feet. Disburse on site.
NEW TOPSOIL
Install a total of 22 yards of topsoil in planting beds where soil was removed. The topsoil will be
harvested from the ranch and delivered in close proximity to the planting beds. Eight inches of
soil will be installed in each area.
SOIL PREPARATION
Prepare planting beds measuring 867 square feet to a depth of 12" with the addition of 2" of
Back to Earth mulch or similar and 2" of perlite. A mixture of Yum-Yum mix and Planters II
trace minerals will be mixed into the soil. The fertilizer will be added at a rate of 20 pounds per
100 square feet of planting bed.
PLANT MATERIAL
Install the following plant material : 247 lavender, 65 columbine, and 2 trumpet vine.
DRIP IRRIGATION
Install drip irrigation to all newly installed plant material. The existing drip zone in this area will
be utilized.
PECAN SHELL MUCLH
Install pecan shell mulch in all planting beds measuring 867 square feet.
COST BREAKDOWN
Miscellaneous Work
Soil Removal
New Topsoil
Soil Preparation
Plant Material
Drip Irrigation
Pecan Shell Mulch
$ 560
$ 700
$ 770
$ 3,250
$ 5,495
$ 1,100
$ 865
AREA TOTAL
$12,740
EFTA00587285
SERVICE COURT
MISCELLANEOUS WORK
Pot and hold 25 stipa grass. Remove 1 oak tree with root ball. Take debris to landfill.
SOIL REMOVAL
Remove 12" of soil in planting beds totaling 1091 square feet. Disburse on site.
NEW TOPSOIL
Install a total of 28 yards of topsoil in planting beds where soil was removed. The topsoil will be
harvested from the ranch and delivered in close proximity to the planting beds. Eight inches of
soil will be installed in each area.
SOIL PREPARATION
Prepare planting beds measuring 1091 square feet to a depth of 12" with the addition of 2" of
Back to Earth mulch or similar and 2" of perlite. A mixture of Yum-Yum mix and Planters II
trace minerals will be mixed into the soil. The fertilizer will be added at a rate of 20 pounds per
100 square feet of planting bed.
PLANT MATERIAL
Install the following plant material : 58 stipa grass and 23 Broadmoor juniper.
DRIP IRRIGATION
Install drip irrigation to all newly installed plant material. The existing drip zone in this area will
be utilized.
PECAN SHELL MUCLH
Install pecan shell mulch in all planting beds measuring 1091 square feet.
OPTIONAL TREE REMOVAL
Remove two additional oak trees with root balls along wall.
COST BREAKDOWN
Miscellaneous Work
$ 350
Soil Removal
$ 490
New Topsoil
$ 980
Soil Preparation
$ 4,090
Plant Material
$ 1,975
Drip Irrigation
$ 285
Pecan Shell Mulch
$ 1,090
Optional Tree Removal
$ 420
AREA TOTAL
$ 9,680
EFTA00587286
PROJECT SUMMARY
DRIVE ENTRY AND PARKING COURT
$11,190
NORTH PERIMETER
$ 5,130
NORTH GARDEN
$10,845
EAST TERRACES
$34,955
BOWL GARDEN
$ 8,205
SOUTHEAST SIDE
$12,740
SERVICE COURT
$ 9,680
PROJECT SUBTOTAL
$92,745
Travel Charge*
$13.910
PROJECT GRAND TOTAL
$106,655
*Due to the distance of travel required to reach the jobsite, a travel charge is being added to the
project total. Two hours per day will be required to drive to and from Zorro Ranch. It is our
intention to work nine hour days during this project so we will have seven actual hours on site.
To account for the shortened work day and wear and tear on equipment and vehicles, an
additional charge of 15% is being added to the total.
Prices do not include county gross receipts tax.
For a period of one (I) year after planting, all plant material is guaranteed against death from
causes other than accidental, weather related, or animals and provided proper care is given them
by owner. Any plant material that dies during this period will be replaced once free of charge
with similar plants of equal value.
Irrigation work fully warranted for one year from date of completion.
EFTA00587287
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA00587280.pdf |
| File Size | 449.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 10,775 characters |
| Indexed | 2026-02-11T22:50:51.450222 |