BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
MAINTENANCE DOCUMENT
1/22/03
GM Assign each item to be completed by Specific Date.
MASTER
WEEK 1
VIP fire inspection document completed and faxed to Laurel, Gerardo and Gary.
Follow up any problem. Keep records.
Note: In case of inspection by the FDNY. E-mail the result of the inspection
Keep copy and follow any problem. Send original to Seemoy.
Exterminator - Pull and follow master instruction document.
Follow maintenances man document and review his work for the corresponding week.
Confirm tool area is clean and organized.
Have Maintenance E-mail ready (problems and questions).
Once a monthly only on the 1st Monday water your main plant on the stairwell.
Only pour small amounts of water around trunk of plant till base overflows then
drain base and do it again. You must soak all soil since you only do this 1 time a
month. Approximately 4 pitchers.
Have all waiters bring all table adjustment feet to "0" and rebalance.
Wipe down all Bar and chair legs, and table bases. Remove all gum from under Bar rail
and under regular chairs and tables. (porter)
Main Floor
Jazz Room
Vault Room
Have dishwasher soap supplier, test machine with test paper to be sure proper amounts
of chemical are being used. Too little --you won't pass BOH; too much --and you're
wasting money. Review and check this with service man at time of testing.
Have dishwasher decaled. They only need 1/6 of a gallon of chemical. 1 gal. = 6mos.
Have the Sanolite technician fill the preventive check off sheet for dish machine and
Follow any recommendations.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588193
As of 8103/06
Page 2 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Clean all espresso handles and regular coffee filters with baking soda - remove
strainers and clean baskets and holder of machine.
inspect and keep organized soda room.
Clean all white ice buckets inside and out with Ajax.
Have each manager on 3 different days go through
garbage with dishwasher
linen with busboy. Review findings with other managers and workers.
Check all large folding tables for any necessary repairs or painting.
Check plastic weave on café chairs for any rips or pieces of weave coming undone, can
cause harm to clothing as plastic is hard.
Evaluate any interior & exterior required painting.
Test surveillance equipment.
inspect and keep organized storage area in basement.
any problem inform the corresponding department, Maintenance or BOH.
COMMENTS:
MANAGER
DATE
MAINTENANCE PERSON
FAX ATTN: GERARDO AT 212-679-0996 BY SUNDAY W/E.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588194
As of 8/03/C
Page 3 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
WEEK 2
2nd Monday of month - exterminator - Pull and follow master
instruction sheets
(exterminator prep sheets).
Main Floor
Jazz Room
Vault
Room
Follow maintenances man document and review his work for the
corresponding week.
Confirm tool area is clean and organized.
Have Maintenance E-mail ready (problems and questions).
Check and record stock of Matches amt.
, amt.
Comment Cards amt.
and Amex Paper
amt.
Remove carefully glass shelf behind all banquettes. Replace bulbs,
dust and clean.
Replace glass carefully. _Main Room
Balcony
Jazz Room
At locker or change area gather up all work shoes and place in a
basket after two weeks
discard shoes left in basket.
Clean all espresso handles and regular coffee filters with baking
soda - remove
strainers and clean baskets and holder of machine.
padding.
ifs clean,
Clean all white ice buckets inside and out with Ajax.
Confirm beer lines were cleaned in last 4 weeks.
Inspect Clean and replace (if necessary) any white foam table
Inform maintenance.
Check Weather Gear
raincoats,
winter coat (heavy) and
porters coat,
gloves, _boots.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588195
As of 8/03/C
Page 4 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Confirm speakers are positioned correctly on main floor and
balcony.
Check conditions of all wicker linen baskets, replace as needed.
Pull out banquette seats, clean and reset glue traps and seal any
holes.
Inspect and keep organized storage area in basement.
any problem inform the corresponding department, Maintenance or
BOH.
Banquettes and furniture inspection.
Please inspect all your banquettes, look for rips, loose springs or if
it is wearing out. If you need your banquettes repaired take a floor
plan and mark the banquettes with damage and a small note
explaining the problem. Then fax it to LIC to Gary A. Then follow
up with an e-mail to Gary A. and Gerardo G. letting us know the
problems and that you faxed the floor plan. Within a couple of days
Gary should have a scheduled day for the repair.
Inspect every chair in the restaurant, pull out all chairs with stain or
rips. E-mail LIC
your request for chairs.
Inspect all back sleeve covers for chairs. Send your request to LIC.
COMMENTS:
MANAGER
DATE
O2005 B.R. Guest, Inc.
U:IfttaintenancelbwgIBWG- January.doc
EFTA00588196
As of 8/03/C
Page 5 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
MAINTENANCE PERSON
FAX ATTN: GERARDO AT 212-679-0996 BY SUNDAY W/E.
©2005 B.R. Guest. Inc.
U\Maintenancelbwg\BWG• January.doc
EFTA00588197
As of 8/03/C
Page 6 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
WEEK 3
Follow maintenances man document and review his work for the
corresponding week.
Confirm tool area is clean and organized.
Have Maintenance E-mail ready (problems and questions).
Clean out beer and wine in walk-in refrigerator completely. Clean
racks and rotate
stock.
Clean all espresso handles and regular coffee filters with baking
soda - remove
strainers and clean baskets and holder of machine.
Clean all white ice buckets inside and out with Ajax.
Check and test Alarm System once a month.
All Alarm buttons at--
a:
Host Stand
b:
Behind Bar Upstairs
c:
Bar Downstairs
d:
Waiters Hutch Downstairs
e:
Host Stand Downstairs
f:
In manager office.
Circuit board and key pad in manager office.
g:
3 Pendants
Check managers' and chefs' phone and beeper numbers are
correct.
Test surveillance equipment.
Check all coffee areas have a bang bar on a chain with metal cap.
Inspect and keep organized storage area in basement.
any problem inform the corresponding department, Maintenance or
BOH.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588198
As of 8/03/C
Page 7 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
COMMENTS:
MANAGER
DATE
MAINTENANCE PERSON
FAX ATTN: GERARDO AT 212-679-0996 BY SUNDAY W/E.
0,2005 B.R. Guest. Inc.
U\Maintenancelbwg\BWG• January.doc
EFTA00588199
As of 8/03/C
Page 8 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
WEEK 4
4th Monday of month - exterminator - Pull and follow master
instruction sheets
(exterminator prep sheets).
Main Floor
Jazz Room
Vault
Room
Follow maintenances man document and review his work for the
corresponding week.
Confirm tool area is clean and organized.
Have Maintenance E-mail ready (problems and questions).
See chefs maintenance notes:
U:ANGELMBWGIKITCHEMCLEANING
Clean all espresso handles and regular coffee filters with baking
soda - remove
strainers and clean baskets and holder of machine.
and
damage
Clean all white ice buckets inside and out with Ajax.
Discard old, torn, logo discolored & plastic inserts torn AMEX books
order new ones. The lead time is 4-6 weeks.
Curtains in Bank Vault Room (clean as needed). Over cleaning will
the curtains.
At locker or change area gather up all work shoes and place in
plastic crate. After 2
weeks discard shoes that are left.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588200
As of 8/03/C
Page 9 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Check all chairs and banquettes for rips, holes and burns
Main floor
Jazz room
Vault room
Test all thermostats are at 72° and confirm auto mode (on
thermostat) will call for heat
or cold as needed. If problem, contact Arista.
Check porters using drill bits on ovens to unclog jet holes.
Test all "Bug & Fly machines". Make sure they are in proper
working order.
Inspect and keep organized storage area in basement.
any problem inform the corresponding department, Maintenance or
BOH.
Confirm cleaning of all coils & drain lines in all refrigeration
compressors. Follow coil
cleaning document.
Check all carpet on balcony and in Vault Room. Clean, if
necessary. (Carpets should
be cleaned 4-6 times a year approximately).
Check if sidewalk area needs power washing.
Inspect every chair in the restaurant, pull out all chairs with stain or
rips. E-mail LIC
your request for chairs.
Inspect all back sleeve covers for chairs. Send your request to LIC.
Coordinate and schedule with the Maintenance Dept. or
Dishwasher (BF only) to clean
and sanitize ice bins for ice machines. Manager and chef must
inspect and confirm
they are clean before the unit is refilled with
ice.
Check all café chairs. Send any with broken weave to be repaired
at L.I.C.
O2005 B.R. Guest, Inc.
U:thlaIntenancelbwgIBWG- January.doe
EFTA00588201
As of 8/03/C
Page 10 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
COMMENTS:
MANAGER
DATE
MAINTENANCE PERSON
FAX ATTN: GERARDO AT 212-679-0996 BY SUNDAY W/E.
©2005 B.R. Guest. Inc.
U\Maintenancelbwg\BWG• January.doc
EFTA00588202
As of 8/03/C
Page 11 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
MAINTENANCE
(ALL ITEMS MUST BE CHECKED MY MANAGER)
WEEK 1
Vacuum blinds on 3 windows at staircase and blinds above arched
café doors.
Clean and level all photos:
_balcony
_Jazz room
Vault room
Dust sofits
_Jazz room ceiling
Clean and empty grease traps:
inside refrigerator room
by
building boiler room
on top of oil tank.
Windex mirror above sofit in vault room.
Inspect sump pumps are in good condition _in front of beer
walk-in box
in ejector room
in front of managers office _inside
basement by water
heater.
Check oil tank inside building basement for leaks and bugs.
Inspect cage area.
Clean and polish all wood floors:
Jazz
_Main
Check all walls and columns for painting. _Mezzanine _Main
floor _Jazz room
Vault room
Check all light fixtures outside _lamps in floor of café _front
door columns
_lights to flag above front door.
Check bathroom have in proper order
seat cover holders
O2005 B.R. Guest, Inc.
U:IfttaintenancelbwgIBWG- January.doc
EFTA00588203
As of 81031C
Page 12 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
_toilet paper dispensers
_soap dispensers
_paper towel machine
Tighten all rest room toilet seat covers. Have dishwasher clean
with a toothbrush the
brackets of all partitions in bathrooms.
Check all water filters are clean and water pressure is good.
_above in linen storage area
_at 4 ice machine
main kitchen steamers
_main kitchen coffee station
Replace filter if
necessary.
lower level coffee station.
Check screws, bolts and weather stripping on cafe doors and all
front doors and 3 front
windows. Fix all cafe doors not to slam shut. Adjust hinges and
stoppers.
Empty, clean and bleach 3 metal pans: 1 over piano in Jazz Room,
1 over steps to Jazz
Room Bar, 1 over Dishwasher room doorway. For each, open
access door. (Leak
from upstairs bar soda lines.)
Check hose connection in trap door (ceiling) across from Jazz
Room bread station.
Check upstairs balcony bathroom small exhaust fan is working.
Change or vacuum clean AC filters: Clean screen and inside filter
_at oyster bar A/C unit
_clean NC unit over beer
NC unit over front door
_butchers drop ceiling (see if
needs to be drained)
walk-in box
area
is clean and
Check and confirm mechanical room in alley way on platform area
organized.
Confirm freight elevator entrance area is clean.
O2005 B.R. Guest, Inc.
U:IfttaintenancelbwgIBWG- January.doc
EFTA00588204
As of 81031C
Page 13 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Clean inside elevator shaft, bleach and clean. Follow instructions
to open doors.
(See attached Doc.: U:ANGELA1BWMELEVATOR). Be careful.
Confirm sump
pump working. If any problems, alert manager to call Arrow
Elevator
(718) 387-7500. (To be done twice a week
Mon-Thurs in
addition to the daily
Porters work).
VIP: Vacuum ceiling panels in entire ceiling, especially over tables
65-67, 56-57, host
area and all NC vents.
Vacuum balcony ceiling in front of A/C only.
Pull out all banquette seats, clean & reset glue traps & seal any
holes. Booths 1, 2, 3,
50-57, 60-64, 65-67 -- clean seat and back corners and reseat
correctly.
Check and replace on non-skid tape on all stairs for F.O.H. and
B.O.H. steps.
back steps to main kitchen
steps to Jazz bar
steps up
to Jazz service bar
area.
Check carpet for any stains and clean.
On West end of café (near Union Square restaurant) clean 6" —
high vent (lift cover);
clean air curtain screen by back metal doors; clean 2 screens
above.
Make sure you have a backup hose for dishwasher table.
Clean all smoke eater cells in 4 units for Jazz room:
kitchen walk-in,
1 over beer walk-in
1 in main office.
2 over
Clean outside vents on platform roof. (Stairs next to back door).
_Makeup air — clean and replace filters
O2005 B.R. Guest, Inc.
U:IfttaintenancelbwgIBWG- January.doc
EFTA00588205
As of 8103/C
Page 14 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
_AC fresh air supply at far end
_Check all timers for makeup air for kitchen hoods
Clean motors behind convection ovens in lower kitchen.
Oil, water pump and heaters in basement.
Oil with WD 40 all door locks for doors and pad locks for walk-in
box.
Check all gaskets on all refrigerators and freezers (BOH).
Check all refrigerator door gaskets in kitchen and on all walk-in box
Check large folding party tables for any necessary repairs or
Remove panel on glass wall in vault room and dust off back and
Check all electric dimmers have cover plates and marked for
correct light levels.
painting
doors
front of wall.
Check dimmer control zone charts are posted and all zones are
marked correctly to
zone chart. Don't change sitting without asking management first.
Then adjust
cloth.
necessary document. All zone changes 5-7 minutes except for AM
Clean and dust top pink ceiling in Jazz Room. Use lightly damp
Dust and check lights on top level and lights on second level.
Confirm all soda gun holder have its proper drain.
Check NuCo2 alarms are 100%. Press and hold test button. You
will hear and see the
alarm light go on.
Clean and empty grease traps:
inside compressor room,
O2005 B.R. Guest, Inc.
U:IfttaintenancelbwgIBWG- January.doc
EFTA00588206
As of 81031C
Page 15 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
by building boiler room on top of oil tank with help form the PM
porters.
COMMENTS:
MANAGER
DATE
MAINTENANCE PERSON
FAX ATTN: GERARDO AT 212-679-0996 BY SUNDAY W/E.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588207
As of 8/03/C
Page 16 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
MAINTENANCE
(ALL ITEMS MUST BE CHECKED MY MANAGER)
WEEK 2
Clean and level all photos: _Balcony
Jazz room
Vault
Remove carefully glass light shelf behind all banquettes. Replace
bulbs, dust and
clean. Replace bulbs, dust and clean. Replace glass carefully.
_balcony Mezzanine
under stairs
Windex mirror above sofit in vault room.
Inspect sump pumps are in good condition _in front of beer
walk-in box
_ejector room _in front of managers office _inside
basement by water heater.
Check oil tank inside building basement for leaks and bugs.
Inspect cage area.
Clean and polish all wood floors:
Jazz
_Main
Clean stainless steel tank in front of managers office. Confirm
pumps are working.
Check all walls and columns for painting. _Mezzanine _Main
floor _Jazz room
Vault room
Check all light fixtures outside
lamps in floor of café _front
door columns
_lights to flag above front door.
Check bathroom have in proper order
seat cover holders
_toilet paper dispensers
_soap dispensers
_paper towel machine
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588208
As of 81031C
Page 17 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Tighten all rest room toilet seat covers. Have dishwasher clean
with a toothbrush the
brackets of all partitions in bathrooms.
Check all water filters are clean and water pressure is good.
_above in linen storage area
_at 4 ice machines
main kitchen steamers
_main kitchen coffee station
Replace filter if
necessary.
lower level coffee station.
Check screws, bolts and weather stripping on cafe doors and all
front doors and 3 front
windows. Fix all cafe doors not to slam shut. Adjust hinges and
stoppers.
Check hose connection in trap door (ceiling) across from Jazz
Room bread station.
Check upstairs balcony bathroom small exhaust fan is working.
Change or vacuum clean AC filters: Clean screen and inside filter
_at oyster bar NC unit
_clean NC unit over beer
_NC unit over front door
_butchers drop ceiling (see if
needs to be drained)
walk-in box
area
is clean and
Check and confirm mechanical room in alley way on platform area
organized.
Confirm freight elevator entrance area is clean.
Clean inside elevator shaft, bleach and clean. Follow instructions
to open doors.
(See attached Doc.: WP51BWMELEVATOR). Be careful.
Confirm sump pump is
working. If any problems, alert manager to call Arrow Elevator
(718) 387-7500.
(To be done twice a week — Mon-Thurs in addition to the daily
Porters work).
O2005 B.R. Guest, Inc.
U:1MaintenancelbwgIBWG- January.doc
EFTA00588209
As of 81031C
Page 18 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Pull out all banquette seats, clean & reset glue traps & seal any
holes. Booths 1, 2, 3,
50-57, 60-64, 65-67 -- clean seat and back corners and reseat
correctly.
Check and replace on non-skid tape on all stairs for F.O.H. and
B.O.H. steps.
back steps to main kitchen
steps to Jazz bar _steps up to
Jazz service bar area.
Check carpet for any stains and clean.
Clean coils of all compressors:
in compressor room
above
beer walk-in box
_stairs in platform area
NC for vault room. Blow out all
drain lines for any
type of compressors.
Clean both kitchen coils for _salad crisper
freezer
runners refrigerator
in Main kitchen _refrigerator next to steamers in Main kitchen.
Check NC Sprinkler system located in back alley to see if it needs
to be drained.
Check all faucets at all prep area sinks, all bathrooms (including
employee bathroom),
dishwasher area, pot washers and plumbing area in good order.
Check floor drain covers in kitchen (under coffee area, dishwasher
line, prep area, ice
room bakery).
Clean and polish all wood floors:
Main Floor.
Check on both floors all sinks have drain cover screens and are
screwed down at
_at bar sinks
_pantry area sink
_pot sink
in dish room
dish area sink
_all oyster bar sinks
Test all "Bug and Fly Machines". Make sure they are in proper
working order.
O2005 B.R. Guest, Inc.
U:IfttaintenancelbwgIBWG- January.doc
EFTA00588210
As of 81031C
Page 19 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Check all smoke detectors are in working order:
_coat check room
_dry goods area
sofit above lockers
prep kitchen.
porters.
COMMENTS:
by locker area
storage above
Confirm all soda gun holder have its proper drain.
Clean and empty grease traps:
inside compressor room,
by building boiler room on top of oil tank with help form the PM
MANAGER
DATE
MAINTENANCE PERSON
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588211
As of 8/03/C
Page 20 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
FAX ATTN: GERARDO AT 212-679-0996 BY SUNDAY W/E.
©2005 B.R. Guest. Inc.
U\Maintenancelbwg\BWG• January.doc
EFTA00588212
As of 81031C
Page 21 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
MAINTENANCE
(ALL ITEMS MUST BE CHECKED MY MANAGER)
WEEK 3
café doors.
Vault
Vacuum blinds on 3 windows at staircase and blinds above arched
Clean and level all photos: _Balcony
_Jazz room
Dust sofits
_Jazz room ceiling
Clean and empty grease traps:
inside refrigerator room
by
building boiler room
on top of oil tank.
Windex mirror above sofit in vault room.
Inspect sump pumps are in good condition _in front of beer
walk-in box
by water heater
in ejector
in front of managers office _inside basement
Check oil tank inside building basement for leaks and bugs.
Inspect cage area.
Clean and polish all wood floors:
Jazz
_Main
Check all walls and columns for painting. _Mezzanine _Main
floor _Jazz room
Vault room
Check all light fixtures outside _lamps in floor of café _front
door columns
_lights to flag above front door.
Check all electric dimmers have cover plates and marked for
correct light levels.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588213
As of 81031C
Page 22 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Check bathroom have in proper order
seat cover holders
_toilet paper dispensers
_soap dispensers
_paper towel machine
Tighten all rest room toilet seat covers. Have dish washer clean
with a toothbrush the
brackets of all partitions in bathrooms.
Check all water filters are clean and water pressure is good.
above in linen storage area
_at 4 ice machines
main
kitchen steamers
_main kitchen coffee station
lower level coffee station.
Replace filter if
necessary.
Check screws, bolts and weather stripping on cafe doors and all
front doors and 3 front
windows. Fix all cafe doors not to slam shut. Adjust hinges and
stoppers.
Empty, clean and bleach 3 metal pans: 1 over piano in Jazz Room,
1 over steps to Jazz
Room Bar, 1 over Dishwasher room doorway. For each, open
access door. (Leak
from upstairs bar soda lines.)
Check hose connection in trap door (ceiling) across from Jazz
Room bread station.
Check upstairs balcony bathroom small exhaust fan is working.
Change or vacuum clean AC filters: Clean screen and inside filter
_at oyster bar A/C unit
_clean NC unit over beer
NC unit over front door
_butchers drop ceiling (see if
needs to be drained)
walk-in box
area
is clean and
Check and confirm mechanical room in alley way on platform area
organized.
Confirm freight elevator entrance area is clean.
O2005 B.R. Guest, Inc.
U:IfttaintenancelbwgIBWG- January.doc
EFTA00588214
As of 8/03/C
Page 23 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Clean inside elevator shaft, bleach and clean. Follow instructions
to open doors.
(See attached Doc.: U:ANGELA1BWMELEVATOR). Be careful.
Confirm sump
pump is working. If any problems, alert manager to call Arrow
Elevator
(718) 387-7500. (To be done twice a week
Mon-Thurs in
addition to the daily
Porters work).
VIP: Vacuum ceiling panels in entire ceiling, especially over tables
65-67, 56-57, host
area and all NC vents.
Vacuum balcony ceiling in front of A/C only.
Pull out all banquette seats, clean & reset glue traps & seal any
holes. Booths 1, 2, 3,
50-57, 60-64, 65-67 -- clean seat and back corners and reseat
correctly.
Check and replace on non-skid tape on all stairs for F.O.H. and
B.O.H. steps.
back steps to main kitchen
steps to Jazz bar
steps up
to Jazz service bar
area.
Check carpet for any stains and clean.
Clean and dust stereo units in all areas. (Use can of compressed
air). Spray all NCR
computers
_Jazz room
_Main host stand
Bank vault
Main stereo unit off coat check room.
Oil, water pump for water heaters in basement.
Downstairs
Check all exit lights and emergency lights are working (8 total)
Upstairs:
_door to back alley
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588215
As of 8/03/C
Page 24 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
door to main entrance
between tables #22 and #23 over café doors
at base of stairs outside coat check area
over entrance to Jazz room
over exit to Jazz kitchen by bread station
outside dish room (hallway)
base of back stairs to upstairs kitchen
Change oil in power sprayer. Use 30 weight non-detergent oil.
Blow out:
_all bar sinks
(in basement)
_service ice bin in both
_oyster bar
above fish walk-in)
_both kitchen floors
_cappuccino drain
_pantry sink drain
areas.
steam tables
_slop sink
bars
_all 4 NC unit drain lines:
above beer walk-in
2
blow out walk-in compressor drain
main and balcony bathroom sinks
inside of line refrigerators
Check hinges on all doors at host stand and at all waiter service
Look at oyster bar glass. Replace sections as needed.
Confirm all soda gun holder have its proper drain.
Paint large outdoor garbage area gate doors with black gloss paint.
Clean and empty grease traps:
inside compressor room,
_by building boiler room on top of oil tank with help form the PM
porters.
Check NuCo2 alarms are 100%. Press and hold test button. You
will hear and see the
alarm light go on.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588216
As of 81031C
Page 25 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Check with maintenance man all electric clock timers are all on
correct times.
Follow Master Doc.
_exhaust main kitchen
_makeup main kitchen
(Located by staircase inside black cage on main floor).
_exhaust prep kitchen
_makeup air prep kitchen
(Located on the south wall above traulsen refrigerator in prep
kitchen).
timer.
each refrigerator compressor in the ejector room has its own
Check belts and grease bearings on exhaust and make up air.
prep kitchen and
main kitchen.
Check you have backup fuses for main service and plastic fuse
puller inside main panel.
Make sure you have a backup hose for dishwasher table.
Confirm you have back up NC filters. If you need more ask
manager to
Order them from LIC.
Confirm you have back up water filters. If you need more ask
manager to
Order them from LIC.
doors.
Confirm you have backup of all types of light bulbs.
Confirm you have the back up motor for the kitchen exhaust.
Check you have backup belts _exhaust
_makeup air.
Check bathrooms exhaust fans are working.
Check all gaskets on all refrigerators and freezers (B.O.H.).
Check all refrigerator door gaskets in kitchen and all walk-in box
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588217
As of 8/03/C
Page 26 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Confirm dish machine exhaust is working properly.
COMMENTS:
MANAGER
DATE
MAINTENANCE PERSON
FAX ATTN: GERARDO AT 212-679-0996 BY SUNDAY W/E.
O2005 B.R. Guest, Inc.
U:IrtiaintenancelbwgIBWG- January.doc
EFTA00588218
As of 81031C
Page 27 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
MAINTENANCE
(ALL ITEMS MUST BE CHECKED MY MANAGER)
WEEK 4
Clean and level all photos: _Balcony
Vault Room
confirm all mirrors are level in jazz room.
Remove carefully glass light shelf behind all banquettes. Replace
bulbs, dust and
clean. Replace glass carefully. _balcony Mezzanine _under
stairs
Windex mirror above sofit in vault room.
Inspect sump pumps are in good condition
walk-in box
_ejector room _in front of managers office _inside
basement by water heater.
in front of beer
Check oil tank inside building basement for leaks and bugs.
Inspect cage area.
Clean and polish all wood floors:
Jazz room.
Clean stainless steel tank in front of managers office. Confirm
pumps are working.
Check all walls and columns for painting. _Mezzanine _Main
floor _Jazz room
Vault room
Check all light fixtures outside
lamps in floor of café _front
door columns
_lights to flag above front door.
Check bathroom have in proper order
seat cover holders
_toilet paper dispensers
_soap dispensers
_paper towel machine
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588219
As of 81031C
Page 28 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Tighten all rest room toilet seat covers. Have dishwasher clean
with a toothbrush the
brackets of all partitions in bathrooms.
Check all water filters are clean and water pressure is good.
_above in linen storage area
_at 4 ice machines
main kitchen steamers
_main kitchen coffee station
Replace filter if
necessary.
lower level coffee station.
Check screws, bolts and weather stripping on cafe doors and all
front doors and 3 front
windows. Fix all cafe doors not to slam shut. Adjust hinges and
stoppers.
Check hose connection in trap door (ceiling) across from Jazz
Room bread station.
Check upstairs balcony bathroom small exhaust fan is working.
Change or vacuum clean AC filters: Clean screen and inside filter
_at oyster bar NC unit
_clean NC unit over beer
_NC unit over front door
_butchers drop ceiling (see if
needs to be drained)
walk-in box
area
is clean and
Check and confirm mechanical room in alley way on platform area
organized.
Confirm freight elevator entrance area is clean.
Clean inside elevator shaft, bleach and clean. Follow instructions
to open doors.
(See attached Doc.: U:ANGELA1BWMELEVATOR). Be careful.
Confirm sump
pump is working. If any problems, alert manager to call Arrow
Elevator
(718) 387-7500. (To be done twice a week
Mon-Thurs in
addition to the daily
Porters work).
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588220
As of 8/03/C
Page 29 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Pull out all banquette seats, clean & reset glue traps & seal any
holes. Booths 1, 2, 3,
50-57, 60-64, 65-67 -- clean seat and back corners and reseat
correctly.
Check and replace on non-skid tape on all stairs for F.O.H. and
B.O.H. steps.
back steps to main kitchen
steps to Jazz bar
steps up
to Jazz service bar
area.
Check carpet for any stains and clean.
Check all strainers are in place on all floor and sink drains.
Check bus station stands:
rubber feet
cloth band not
frayed.
Check bottoms of all chairs and bar stools to be sure all plastic
pegs are in place.
Reset nails.
Check pole and top of stairs holding up balcony is clean or if it
needs to be repainted.
Check molding and doors of linen cabinet under stairs to see if it
needs painting.
Wipe down all speaker wires on balcony. Remove all dust.
Confirm all soda gun holder have its proper drain.
Spray for bugs around
all motor and compressors
_cappuccino machine (and
water pumps) _compressors on all refrigerators that have self-
contained compressors
_glass freezers at bar area _dish machine, remove cover and
spray around motors.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588221
As of 81031C
Page 30 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Windex all windows.
Clean all wall sconces and chandeliers. DO NOT SPIN. BE VERY
CAREFUL.
Confirm backup of all types of light bulbs.
Confirm all CO2 and Nitrogen tanks are chained up.
Reverse Jazz Room curtains (e.g. Curtain B). The following month
change to new curtain (e.g. Curtain A). Dry clean old curtain
(Curtain B).
Have office give information, for example cost.
Advise office of any problems that may arise.
Clean and empty grease traps:
inside compressor room,
by building boiler room on top of oil tank with help form the PM
porters.
Coordinate and schedule with the Maintenance Dept. or
Dishwasher (BF only) to clean
and sanitize ice bins for ice machines. Manager and chef must
inspect and confirm
they are clean before the unit is refilled with
ice.
COMMENTS:
MANAGER
DATE
MAINTENANCE PERSON
FAX ATTN: GERARDO AT 212-679-0996 BY SUNDAY W/E.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588222
As of 8/03/C
Page 31 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
PORTER
WEEK 1
Clean and dust walls in Jan Room basement dining room area
and bar and use
large ladder so you can reach the top. Take a clean regular size
broom and wrap a
damp (clean) apron or tablecloth around it. Lightly brush off the top
of walls. Each area
should take no more than 20 minutes to complete. Each night you
are required to do
one area. They are as follows:
MONDAY:
service area wall.
entrance, door
sides of ducts by host
first floor.
areas to bar.
Clean and polish wood walls in hallway to
bathroom around pay phones and doors to
Jazz Room.
Clean and polish wood walls at North wall to
Marble wall, column, window frames, front door
frames, A/C unit on top of door and top and
stand.
TUESDAY:
Clean marble steps and walls from bathroom to
service bus station
Clean & polish wood walls at North & South
Clean and polish wood paneling -- all areas:
Balcony - west walls, bathroom areas,
Main floor - west wall at oyster bar,
kitchen entrance,
paneling behind table 56.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588223
As of 81031C
Page 32 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
WEDNESDAY:
South and Southwest walls between tables 25
to 67. Go up to
balcony and clean all windows and window
shades inside and out.
and out all window
cloth.
damp cloth.
around bar and back bar.
South wall between tables 1 to 2. Clean inside
shades.
Wipe down all columns with a lightly damp
Wipe down wall at stair area with a lightly
Clean and polish wood walls and marble
South and Southwest walls between tables 25
to 67. Go up to balcony and clean all windows
and window shades inside and out.
Clean blinds on balcony.
Dust and check lights behind stage.
South wall between tables 1 to 2. Clean inside
and out all window blinds.
Clean blinds on balcony.
THURSDAY:
Clean and polish wood walls in hallway to
bathroom and doors to
Jazz Room.
Use citrus oil on this downstairs paneling —
All wood paneling around entire restaurant.
■ Balcony - west walls, bathroom areas,
service bus station
■ Main floor - west wall at oyster bar, kitchen
entrance, paneling behind table 56.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588224
As of 81031C
Page 33 of 54
light fixtures
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Polish brass supports for sneeze guard and
on Oyster Bar.
Polish all brass corner angles.
FRIDAY:
platform from host
Dust all 12 wall lamp
Room.
Clean and polish paneling along entire
stand to oyster bar and front of bar.
Dust. Be careful. Be sure hands are clean.
shades and 3 booth lamp shades in Jazz
Windex bus station across for table 202.
Windex Jazz Room host stand.
Have PM Porter clean with mild detergent and scrub with a brush
the 5 awnings on
16th Street and the 2 awnings on Broadway. Then rinse them out
with the water hose. Be careful with the doors. Don't use too much
water. It can get in the restaurant and damage the floors.
basement
in jazz room.
COMMENTS:
Clean grease traps. Clean inside large tank with ejector pumps in
compressor room with maintenances man.
Manually scrub all base board in man room and ladies room.
Polish and clean base board of all 3 hutches in main floor and one
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588225
As of 8/03/C
Page 34 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
MANAGER
DATE
MAINTENANCE PERSON
FAX ATTN: GERARDO AT 212-679-0996 BY SUNDAY W/E.
, 2005 B.R. Guest, Inc.
UaMaintenancethwgIBWG. January.doc
EFTA00588226
As of 81031C
Page 35 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
PORTER
WEEK 2
Clean and dust walls in Jan Room basement dining room area
and bar and use
large ladder so you can reach the top. Take a clean regular size
broom and wrap a
damp (clean) apron or tablecloth around it. Lightly brush off the top
of walls. Each area
should take no more than 20 minutes to complete. Each night you
are required to do
one area. They are as follows:
MONDAY:
service area wall.
entrance, door
sides of ducts by host
first floor.
areas to bar.
Clean and polish wood walls in hallway to
bathroom around pay phones and doors to
Jazz Room.
Clean and polish wood walls at North wall to
Marble wall, column, window frames, front door
frames, A/C unit on top of door and top and
stand.
TUESDAY:
Clean marble steps and walls from bathroom to
service bus station
Clean & polish wood walls at North & South
Clean and polish wood paneling -- all areas:
Balcony - west walls, bathroom areas,
Main floor - west wall at oyster bar,
kitchen entrance,
paneling behind table 56.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588227
As of 81031C
Page 36 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
WEDNESDAY:
South and Southwest walls between tables 25
to 67. Go up to
balcony and clean all windows and window
shades inside and out.
and out all window
cloth.
damp cloth.
around bar and back bar.
South wall between tables 1 to 2. Clean inside
shades.
Wipe down all columns with a lightly damp
Wipe down wall at stair area with a lightly
Clean and polish wood walls and marble
South and Southwest walls between tables 25
to 67. Go up to balcony and clean all windows
and window shades inside and out.
Clean blinds on balcony.
Dust and check lights behind stage.
South wall between tables 1 to 2. Clean inside
and out all window blinds.
Clean blinds on balcony.
THURSDAY:
Clean and polish wood walls in hallway to
bathroom and doors to
Jazz Room.
Use citrus oil on this downstairs paneling —
All wood paneling around entire restaurant.
■ Balcony - west walls, bathroom areas,
service bus station
■ Main floor - west wall at oyster bar, kitchen
entrance, paneling behind table 56.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588228
As of 81031C
Page 37 of 54
light fixtures
from host
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Polish brass supports for sneeze guard and
on Oyster Bar.
Polish all brass corner angles.
FRIDAY:
Dust all 12 wall lamp
Room.
Clean and polish paneling along entire platform
stand to oyster bar and front of bar.
Dust. Be careful. Be sure hands are clean.
shades and 3 booth lamp shades in Jazz
Windex bus station across for table 202.
Windex Jazz Room host stand.
Have PM Porter clean with mild detergent and scrub with a brush
the 5 awnings on
16th Street and the 2 awnings on Broadway. Then rinse them out
with the water hose. Be careful with the doors. Don't use too much
water. It can get in the restaurant and damage the floors.
basement
in jazz room.
COMMENTS:
Clean grease traps. Clean inside large tank with ejector pumps in
compressor room with maintenances man.
Manually scrub all base board in man room and ladies room.
Polish and clean base board of all 3 hutches in main floor and one
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588229
As of 8/03/C
Page 38 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
MANAGER
DATE
MAINTENANCE PERSON
FAX ATTN: GERARDO AT 718-706-9827 BY SUNDAY W/E
©2005 B.R. Guest. Inc.
U\Maintenancelbwg\BWG• January.doc
EFTA00588230
As of 81031C
Page 39 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
PORTER
WEEK 3
Clean and dust walls in Jan Room basement dining room area
and bar and use
large ladder so you can reach the top. Take a clean regular size
broom and wrap a
damp (clean) apron or tablecloth around it. Lightly brush off the top
of walls. Each area
should take no more than 20 minutes to complete. Each night you
are required to do
one area. They are as follows:
MONDAY:
service area wall.
entrance, door
sides of ducts by host
first floor.
areas to bar.
Clean and polish wood walls in hallway to
bathroom around pay phones and doors to
Jazz Room.
Clean and polish wood walls at North wall to
Marble wall, column, window frames, front door
frames, A/C unit on top of door and top and
stand.
TUESDAY:
Clean marble steps and walls from bathroom to
service bus station
Clean & polish wood walls at North & South
Clean and polish wood paneling -- all areas:
Balcony - west walls, bathroom areas,
Main floor - west wall at oyster bar,
kitchen entrance,
paneling behind table 56.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588231
As of 8/03/C
Page 40 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
WEDNESDAY:
South and Southwest walls between tables 25
to 67. Go up to
balcony and clean all windows and window
shades inside and out.
and out all window
cloth.
damp cloth.
around bar and back bar.
South wall between tables 1 to 2. Clean inside
shades.
Wipe down all columns with a lightly damp
Wipe down wall at stair area with a lightly
Clean and polish wood walls and marble
South and Southwest walls between tables 25
to 67. Go up to balcony and clean all windows
and window shades inside and out.
Clean blinds on balcony.
Dust and check lights behind stage.
South wall between tables 1 to 2. Clean inside
and out all window blinds.
Clean blinds on balcony.
THURSDAY:
Clean and polish wood walls in hallway to
bathroom and doors to
Jazz Room.
Use citrus oil on this downstairs paneling —
All wood paneling around entire restaurant.
■ Balcony - west walls, bathroom areas,
service bus station
■ Main floor - west wall at oyster bar, kitchen
entrance, paneling behind table 56.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588232
As of 8103/C
Page 41 of 54
light fixtures
from host
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Polish brass supports for sneeze guard and
on Oyster Bar.
Polish all brass corner angles.
FRIDAY:
Dust all 12 wall lamp
Room.
Clean and polish paneling along entire platform
stand to oyster bar and front of bar.
Dust. Be careful. Be sure hands are clean.
shades and 3 booth lamp shades in Jazz
Windex bus station across for table 202.
Windex Jazz Room host stand.
Have PM Porter clean with mild detergent and scrub with a brush
the 5 awnings on
16th Street and the 2 awnings on Broadway. Then rinse them out
with the water hose. Be careful with the doors. Don't use too much
water. It can get in the restaurant and damage the floors.
basement
in jazz room.
COMMENTS:
Clean grease traps. Clean inside large tank with ejector pumps in
compressor room with maintenances man.
Manually scrub all base board in man room and ladies room.
Polish and clean base board of all 3 hutches in main floor and one
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588233
As of 8/03/C
Page 42 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
MANAGER
DATE
MAINTENANCE PERSON
FAX ATTN: GERARDO AT 212-679-0996 BY SUNDAY W/E.
©2005 B.R. Guest. Inc.
U\Maintenancelbwg\BWG• January.doc
EFTA00588234
As of 8103/C
Page 43 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
PORTER
WEEK 4
Clean and dust walls in Jan Room basement dining room area
and bar and use
large ladder so you can reach the top. Take a clean regular size
broom and wrap a
damp (clean) apron or tablecloth around it. Lightly brush off the top
of walls. Each area
should take no more than 20 minutes to complete. Each night you
are required to do
one area. They are as follows:
MONDAY:
service area wall.
entrance, door
sides of ducts by host
first floor.
areas to bar.
Clean and polish wood walls in hallway to
bathroom around pay phones and doors to
Jazz Room.
Clean and polish wood walls at North wall to
Marble wall, column, window frames, front door
frames, A/C unit on top of door and top and
stand.
TUESDAY:
Clean marble steps and walls from bathroom to
service bus station
Clean & polish wood walls at North & South
Clean and polish wood paneling -- all areas:
Balcony - west walls, bathroom areas,
Main floor - west wall at oyster bar,
kitchen entrance,
paneling behind table 56.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588235
As of 8/03/C
Page 44 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
WEDNESDAY:
South and Southwest walls between tables 25
to 67. Go up to
balcony and clean all windows and window
shades inside and out.
and out all window
cloth.
damp cloth.
around bar and back bar.
South wall between tables 1 to 2. Clean inside
shades.
Wipe down all columns with a lightly damp
Wipe down wall at stair area with a lightly
Clean and polish wood walls and marble
South and Southwest walls between tables 25
to 67. Go up to balcony and clean all windows
and window shades inside and out.
Clean blinds on balcony.
Dust and check lights behind stage.
South wall between tables 1 to 2. Clean inside
and out all window blinds.
Clean blinds on balcony.
THURSDAY:
Clean and polish wood walls in hallway to
bathroom and doors to
Jazz Room.
Use citrus oil on this downstairs paneling —
All wood paneling around entire restaurant.
■ Balcony - west walls, bathroom areas,
service bus station
■ Main floor - west wall at oyster bar, kitchen
entrance, paneling behind table 56.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588236
As of 8/03/C
Page 45 of 54
light fixtures
from host
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Polish brass supports for sneeze guard and
on Oyster Bar.
Polish all brass corner angles.
FRIDAY:
Dust all 12 wall lamp
Room.
Clean and polish paneling along entire platform
stand to oyster bar and front of bar.
Dust. Be careful. Be sure hands are clean.
shades and 3 booth lamp shades in Jazz
Windex bus station across for table 202.
Windex Jazz Room host stand.
Have PM Porter clean with mild detergent and scrub with a brush
the 5 awnings on
16th Street and the 2 awnings on Broadway. Then rinse them out
with the water hose. Be careful with the doors. Don't use too much
water. It can get in the restaurant and damage the floors.
basement
in jazz room.
COMMENTS:
Clean grease traps. Clean inside large tank with ejector pumps in
compressor room with maintenances man.
Manually scrub all base board in man room and ladies room.
Polish and clean base board of all 3 hutches in main floor and one
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588237
As of 8/03/C
Page 46 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
MANAGER
DATE
MAINTENANCE
PERSON
FAX ATTN: GERARDO AT 212-679-0996 BY SUNDAY W/E.
FIRE INSPECTION DOCUMENT
This report most be completed and fax it to the Maintenance department
office the first week of each month.
Note; Manager with the help of the maintenance man completed the inspection
sheet.
©2005 B.R. Guest. Inc.
U:Waintenancelbwg1BWG- January.doc
EFTA00588238
As of 8/03/C
Page 47 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Date of inspection on the line.
Fire extinguisher check off list. Confirm with maintenance all fire
extinguishers
are in correct order and back of tag signed (follow check of sheet).
Inspection suppression systems (Ansul system) "TAG" is up to date.
Confirm Ansul pipes are in position and have caps.
Confirm the Deep fry has a divider panel at least 16" high.
Confirm we have at list one extinguisher class K in each kitchen.
Confirm instructions how to operated Ansul system are posted in
kitchens.
Confirm duct diagram is posted next to Ansul system. FIRE DEPT.
(MO)
K 151 floor
K 3rd floor
K Banquets
K Green room
Confirm Certificate of inspection for your Ansul system is on file could
be Sentinel or Ideal.
Exhaust hood sticker is updated and posted to each hood (cleaning
service tag)
Inspect hood filters confirm that there is not one missing.
Inspection and test of emergency lights and exit lights.
Confirm all exit doors are clear (adequate egress)
Confirm you have a copy of PA plans on file.
Confirm you have in file and updated inspection log of sprinkler,
standpipe and
fire alarm if apply.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588239
As of 81031C
Page 48 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Inspection and test of smoke detector in storage area if apply.
Nuco2
Confirm tank is chain to the wall.
Certificate of fitness for the driver is posted at the tank
Affidavit of installation (must have a copy in manager's office)
Log sheet posted on the tank, date for service, pressure test and
driver number.
5 yr pressure test on file in office.
Sings posted (Warning CO2, Caution Carbon Dioxide sticker and
Certificate
of approval sticker on tank)
Air Conditioning confirms.
Permits and specifications for each unit.
OTHERS
Open flame permits on file and update.
Flame retarded permits for curtain, ceiling fabrics and furniture covers
on file and update.
Neon permits on file and update "if apply".
Comments and notes:
O2005 B.R. Guest, Inc.
U:IMaintenancelbwg03WG- January.doc
EFTA00588240
As of 8/03/C
Page 49 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
Fax this report to 212- 679-0996.
©2005 B.R. Guest. Inc.
U:1Maintenancelbwg\BWG• January.doc
EFTA00588241
As of 8103/C
Page 50 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
DISH MACHINE INSPECTION DOC.
RESTAURANT
DATE.
VIP- HAND INSPECTION DOCUMENT TO SANOLITE TECH
MANAGER: FOLLOW UP ANY PROBLEM AND CONFIRMED IT GET
RESOLVED, WRITE NOTE OR COMMENTS BEFORE YOU FAX IT.
MINIMUM TEMPERATURES BY THE BOH.
WASHE TEMPERATURE 160°. RINSE TEMPERATURE 180°.
WASH
. RINSE.
PROBLEMS
CHEMICAL DISPENSER OPERATING PROPERLY
YES
, NOT
,PROBLEM
WASH AND RINSE ARMS INSPECTION.
WASH
, RINSE
,PROBLEM
WASH ASSEMBLY.
RINSE PRESSURE
CHECK GAGE CONDITIONS.
INCOMING WATER
RINSE
MOTORS CONDITIONS AND SEALS.
WASH MOTOR
SEAL.
RINSE MOTOR
SEAL.
CONVEYORS DRIVE
RINSE DRAIN CLEAR.
CURTAINS CONDITION BETWEEN TANKS.
DO YOU SEE ANY LEAK
? WHERE.
TEST LEVELS OF •.
IN THE MACHINE.
CHEMICAL EXPLICATION CHARD POSTED
OTHER CHEMICAL DISPENSERS.
DISPENSER POT SINK WASHES.
DISPENSER FOR PRESOAKING SILVERWARE.
CHEMICAL FOR GREASE TRAPS.
MACHINE NEED TO BE DESCALED YES
. NO
COMMENTS AND ACTIONS TAKE IT.
FAX TO GERARDO G. (212) 679-0996
©2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588242
As of 81031C
Page 51 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
TECH NAME
. MANAGERS
FIRE EXTINGUISHER CHECK OFF LIST
DATE:
RESTAURANT:
After this report has been filled out, please fax to LIC operations at 718-706-
9827.
LIC. Operations will follow any issue or schedule with the fire preventive
company.
Check all fire extinguishers have proper fire inspection tags on them and are not
expired. Initial and date the back of the tag under "Monthly Inspection
Record". Follow "Fire Extinguisher Check Off List" to confirm
extinguisher are in assigned places. When sending fire extinguishers out
for service, you must put the stores name on the bottom in black magic
marker.
AREA
QTY.
ID
LOCATION
TYPE
MISSING
TAG
NEED REFILL UNIT
MISSING
C
@2005 B.R. Guest, Inc.
UAlaintenancelbwolBWG- January.doc
EFTA00588243
As of 8/03/C
Page 52 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
REFRIGERATION COILS CLEANING PROCEDURES
Coils must be clean and maintained in proper order monthly. This will
assure the proper functionality of the refrigeration equipment, reducing
costly repairs and also reduce energy consume.
Maintenances man needs to have the following items. Plastic brush, coil
cleaner, spray bottle.
INSTRUCTIONS:
1. In the spray bottle mix water and 4 oz. of coil cleaner.
2. Turn OFF the compressor.
3. Once the compressor is OFF spray the formula on the coil and let it
work for at list 5 minutes, repeat spraying, once the grease is loose
clean the front of the coil from the top to the bottom with the plastic
brush. Repeat this operation until the coil is totally clean.
4. When you finish make sure to turn ON the compressor.
NOTE: Each compressor takes about 15 to 20 minutes to clean.
All compressors need to be clean, including the refrigeration units that
do not have cooling coil. (Water cooling units, self contain or remote
compressors).
VIP Report any problem with compressor to managers. Be specific.
Refrigeration unit
Num#
Unit description
System type Compressors
location
O2005 B.R. Guest, Inc.
U:1Maintenancelbwg\BWG• January.doc
EFTA00588244
As of 81031C
Page 53 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
HOST REFERRAL
If you cannot accommodate a party at their desired time, and they are not
flexible in time, then you must refer them to another BRG restaurant. "U
sorry, but we are fully committed at that time, if you're time is not flexible
perhaps I can recommend another of our restaurants who might be able to
accommodate you." You will receive a list from your manager as to what
restaurants you should push the business to. Think of yourself as the
guest. You should guide them to similar cuisine, location and price when
possible. Be sure to let the guest know you are only making a suggestion,
not guaranteeing them that the restaurant you recommend will have the
availability they desire.
HOST HOLIDAY REFERAL
When you arrive for your shift check for the e-mail that is posted telling
you which BRGuest restaurants have availability, for what size tables and
what times. If you do not see the list posted ask a manager to print one for
you. You should have a copy of this list in front of you for your entire shift.
Use the list to guide your guests to other BRGuest restaurants as noted
above.
MANAGERS HOLIDAY REFERAL
Depending on the holiday restaurants will book up at different speeds.
When you see that you are booked for a certain seating or group of time
slots you must advise on the 1010is conference call. The assigned office
assistant will compile a list of all restaurant availability. As you book
additional seating or groups of timeslots continue to update. You must
review the updated information on the 1010am conference call. The
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588245
As of 8/03/C
Page 54 of 54
BLUE WATER GRILL
MONTHLY MANAGER PLANNING SCHEDULE
JANUARY
assistant will e-mail all managers the updated list everyday, starting the
day after the first restaurant has booked a seating or group of timeslots.
OFFICE ASSISTANT HOLIDAY REFERAL
You will send out a list of each stores holiday availability starting as soon
as you receive word that the first store no longer has full availability. The
list must be e-mailed to all managers and all DO's by11.30am everyday
until the day of the holiday in question.
O2005 B.R. Guest, Inc.
U:IMaintenancelbwgIBWG- January.doc
EFTA00588246
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA00588193.pdf |
| File Size | 2334.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 56,065 characters |
| Indexed | 2026-02-11T22:50:58.116980 |