Gulfstream
PRODUCT SUPPORT
PROPOSAL
Prepared for
Presented by
Gulfstream GIV Serial Number 1085
JEGE, LLC
Mr. Larry Visoslri
Rusty Cramer
Regional Sales Manager, Gulfstream Aerospace
Gulfstream Proposal #
RO1
03 February 2016
EFTA00589859
TABLE OF CONTENTS
PART I. Workscope Description
3
A. Interior Refurbishment
3
B. Avionics Cabin Electronics
3
C. Mechanical
5
D. Paint
7
PART II. Contingencies and Assumptions of Proposal Offer
8
A. Estimated Leadtime
8
B. Estimated Downtime
8
C. Pricing And Scheduling Terms
8
D. General Contingencies
9
E. Addendum To Proposal And Work Authorization Terms And Conditions
10
PART III. Payment Terms and Remittance Instructions
11
PART IV. Executive Summary and Proposal Acceptance
12
EFTA00589860
ID #
RO1
03 February 2016
Gulfstream GN Serial Number 1085
JEGE. LLC
PART I. Workscope Description
A. INTERIOR REFURBISHMENT
AIM
Not Requested
B. AVIONICS / CABIN ELECTRONICS
1. Avionics
1.1 ASC 477 NZ 2010 V6.1 - TRIPLE
$168,250
This Aircraft Service Change upgrades the existing NZ-2000 Flight Management Systems (FMS), via installation of
version 6.1 software, to an NZ-2010 system with SBAS/LPV GPS upgrade.
New Components:
Two (2) Honeywell WAAS Capable GPS Receivers (Part Number (PN) HG2021KB01)
Two (2) WAAS Capable GPS Antennas (PN S67-1575-137)
One (1) ASC 477 Kit, NZ-2000 Flight Management System (FMS) 6.1 Upgrade.
Modified Components:
Three (3) each Honeywell NZ-2000 Navigation Computers (PN 7018879-030xx to 7018879-03036)
Two (2) each Honeywell PZ-800 Performance Computers (PN 7004609-xxx to 7004609-940)
Performance computers not at a minimum level of PN 7004609-925 will require additional upgrades not covered by
this installation. Additional charges will apply.
Prerequisites:
•
NZ-2000 Computers: Hardware Mod "E". For units without this modification, Honeywell Service Bulletin 7018879-
34-0051 (Pub. No. A21- 6111-004) will be required. Estimated additional cost is $2,600/unit.
•
PZ-800 Computers: Part Number 7004609-925. For units not at the -925 level or higher, additional modifications
are required and will be addressed on a time and material basis.
•
The aircraft must currently be equipped with dual Global Positioning System (GPS) receivers.
•
Aircraft Serial Numbers 1000 through 1389: GPS #1 and #2 installations not installed by Gulfstream STC
ST01716AT-D will require engineering review prior to incorporation of this ASC.
•
Existing FMS #1 and #2 installations must match Gulfstream STC ST01715AT-D or equivalent prior to
incorporation.
Concurrent Requirements: None
Training: Pilot familiarization and training for Honeywell's FMS 6.1 software is offered through the Honeywell PC-FMS
Training tool. Operators may order the tool at I
or send an email to
Effectivity: This Service Change is applicable to Gulfstream IV aircraft Serial Numbers 1000 through 1252 having ASC
349 or equivalent, and 1253 and subsequent.
Certification: Per Gulfstream ASC 477 Navigation (ATA 34) NZ-2000 6.1 Software Upgrade with SBAS/LPV GPS
Upgrade.
Notes:
•
Price includes interior access, installation labor, the ASC Kit and associated materials.
•
The design of an Aircraft Service Change (ASC) is configured to a standard ("greenie") production aircraft. If
spare wires, pin connections or locations called out in the ASC have been used for other modification, additional
charges may apply.
•
This ASC may only be installed at Gulfstream Aerospace or Gulfstream- approved facilities.
•
All resources for this Service Change are managed by Gulfstream Product Support. Please contact your Regional
Sales Manager to coordinate the availability of components and installation.
•
This ASC does NOT include Approval Guidance for RNP Procedures with SAAAR (Special Aircraft and Aircrew
Approval Required).
Page 3 of 14
This proposal is confidential between Gulfstream and the Customer.
Micah
Return to Table of Contents
GAC Rev. October 15. 2015
EFTA00589861
;i 11kt
ID #
R01
03 February 2016
Gulfstream GN Serial Number 1085
AGE. LLC
PART I. Workscope Description (continued)
B. AVIONICS CABIN ELECTRONICS
1. Avionics (continued)
1.2 Synthetic Vision (PDSV) - Provisions
$35,000
•
Provision for Synthetic Vision (PDSV) will be installed.
•
New SVS SEL switches will be installed on the Pilot and Co-pilots Glareshield and placarded INOP.
•
A new wiring interface will be installed between the existing Honeywell Symbol Generators (SG's), Traffic Alert
and Collision Avoidance System (TCAS), Global Positioning System (GPS) and the Cockpit Display Units (DU's).
Prerequisites:
•
ASC 476 - DU-885 Indicating / Recording Systems (ATA 31) Electronic Display System DU-885 Liquid Crystal
Display (LCD) Installation (PlaneDeck).
•
ASC 477 - NZ 2010 6.1 Software with SBAS/LPV GPS Installation.
Certification: This installation will be accomplished under a Gulfstream STC. Deviations from the STC (if required)
would be completed on a Time and Material basis or quoted separately on a Work Change Request (WCR).
Notes:
•
These are provisions only. The Symbol Generators (SG's) and Cockpit Display Units (DU's) will require software
upgrades and modifications to activate the Synthetic Vision (PDSV) capability. Additional charges will apply.
•
Synthetic Vision activation is predicated on completion of the Gulfstream STC. Please contact your Gulfstream
Regional Sales Manager (RSM) for current STC status.
•
The cost of this item will be deducted from the final PDSV installation price when the Customers elect to complete
the installation.
1.3 ASC 476B V1.10 Software Enhancements
Warranty
Comply with the Revision B of ASC 476, installation of Barco Service Bulletin SBAv606167B.
Warranty: The Display Unit retrofit upgrade to Software Version, V1.10 will be provided at No Charge (NC) if
performed at a Gulfstream GIV Authorized Warranty Facility or Factory Authorized Service Center within twenty-four
(24) months of the release date (08 August 2014) of this revision.
Prerequisites: ASC 476 or ASC 476A Indicating / Recording Systems (ATA 31), Electronic Display System — DU-885
Liquid Crystal Display (LCD) Installation (PlaneDeck) and having Display Units, PN K9321061A02 (Black) or Part
Number 9321061A11 (Grey).
Notes:
•
This ASC is managed by Product Support Program Management (PSPM) and may only be installed at Gulf stream
erosoace or GuItstr am-
Thies. Incorporation must be coordinated through Gulfstream Scheduling at
or
. If not scheduled, aircraft downtime could increase significantly.
•
Only qualified personnel specifically trained and equipped may accomplish the Barco Service Bulletin,
SBAv606167B REV 00 (or later revision).
1.4 ASC 415B Indicating and Recording - Upgrade SPZ-8000/8400
$28,744
This Service Change Revision upgrades the Fault Warning Computers (FWC) and, in some cases, the Symbol
Generators (SG). For a detailed description of the improvements offered with this upgrade, please log in to your
portal and review the "SPZ-8000 Modification Summary" listed on page 8 of ASC 415B.
Prerequisites: None
Effectivity: This Service Change is effective for GIV Aircraft 1000-1472. This or a similar change will be installed in
production on Aircraft 1473 and subsequent.
Note: This proposal does not include any squawks, pre-existing discrepancies or vendor Service Bulletins that may be
required, except as specified. If required, this additional work will be handled on the basis of time and materials.
Page 4 of 14
This proposal is confidential between Gulfstream and the Customer.
Micah
Return to Table of Contents
GAC Rev. October 15. 2015
EFTA00589862
t
I I
ID rr S
801
03 February 2016
Gulfstream GN Serial Number 1085
JEGE, LLC
PART I. Workscope Description (continued)
C. MECHANICAL
2. Aircraft Maintenance
Z1 12 Month CMP Tasks (Labor Only)
$6,386
Accomplish 12 Month CMP Tasks. (Exhibit 1)
Notes:
•
Correction of discrepancies is not included in the quoted price.
•
Due List projected through 31 December 2016.
2.2 24 Month CMP Tasks (Labor Only)
$37,063
Accomplish 24 Month CMP Tasks. (Exhibit 2)
Notes:
•
Correction of discrepancies is not included in the quoted price.
•
Due List projected through 31 December 2016.
2.3 36 Month CMP Tasks (Labor Only)
$32,621
Accomplish 36 Month CMP Tasks. (Exhibit 3)
Notes:
•
Correction of discrepancies is not included in the quoted price.
•
Due List projected through 31 December 2016.
•
If Cadmium Plating Degradation is found during the Wing Tank Internal Inspection, estimated repairs cost can be
$35.000 in labor and materials depending on the condition of the aircraft.
2.4 150 Hour CMP Tasks (Labor Only)
$1,527
Accomplish 150 Hour CMP Tasks. (Exhibit 4)
Notes:
•
Correction of discrepancies is not included in the quoted price.
•
Due List projected through 31 December 2016.
2.5 150 Cycle CMP Tasks (Labor Only)
$833
Accomplish 150 Cycle CMP Tasks. (Exhibit 5)
Notes:
•
Correction of discrepancies is not included in the quoted price.
•
Due List projected through 31 December 2016.
2.6 Miscellaneous CMP Tasks (Labor Only)
$15,686
Accomplish Miscellaneous CMP Tasks. (Exhibit 6)
Notes:
•
Correction of discrepancies is not included in the quoted price.
•
Due List projected through 31 December 2016.
Page 5 of 14
This proposal is confidential between Gulfstream and the Customer.
Dlirseb
Return to Table of Contents
GAC Rev. October 15. 2015
EFTA00589863
;1 lilS11)%it i (
ID a s
R01
03 February 2016
Gulfstream GN Serial Number 1085
JEGE. LLC
PART I. Workscope Description (continued)
2. Aircraft Maintenance (continued)
2.7 CB 227 Replacement, Oxygen System Flexible Hoses (Labor Not to Exceed)
$11,425
This Customer Bulletin (CB 227) is a one-time action to replace all existing Part Number O202071 oxygen system
flexible hoses with Part Number 37009 oxygen system flexible hoses.
Effectivity: Aircraft Serial Numbers 1000 through 1499.
Notes:
•
Estimated labor includes access to the affected oxygen system dropdown box flexible hoses. This includes
access to oxygen drop-down boxes located in Personal Services Units (PSUs), as well as removal and
reinstallation of headliners in the vestibule, forward galley, forward lavatory, crew rest, aft galley, or aft lavatory as
necessary, and includes access to the therapeutic oxygen system.
•
The quoted price does not include removal of any cabinetry, cabin furniture or cabin compartment dividers.
2.8 CB 232A Modification, Aircraft Main Battery Chargers
See Below
Not Applicable to this aircraft per equipment installed
This Customer Bulletin (CB 232A) is a one-time action to incorporate ELDEC Service Bulletin 8-842-24-02.
Effectivity: All GIV Aircraft having part number 1159SCAV520 Series battery chargers
Notes:
•
This Customer Bulletin is a managed program and must be accomplished at a Gulfstream Aerospace authorized
facility. This Customer Bulletin must be coordinated through he Gulfstream Pro ram
ffi
vi
mail at
or by calling Gulfstream Scheduling at
1. or
. If not
scheduled, down times could increase significantly.
•
1159SCAV520-5 Battery Chargers within (spares warranty) will be modified free of charge to 1159SB57520-11 or
may be replaced with 1159SCAV520-7. Operators choosing to replace the 1159SCAV520-5 with 1159SCAV520-7
will incur additional costs.
•
Materials will be billed, as required.
2.9 CB 235 - Main Landing Gear Door Actuator End Cap Replacement - Life Limit (Labor Only)
$3,936
Materials as Required
(See Notes)
This Customer Bulletin is a one-time action to replace all main landing gear door actuators that have been identified
per CB 234 as having 9,500 Cycles Since New (CSN) or greater and all main landing gear door actuators for which
CSN cannot be determined.
Effectivity: All GIV aircraft
Compliance: Compliance with this Customer Bulletin is required within twelve (12) months from the original issue date
of 01 July 2015.
Notes:
•
Contact Gulfstream Repair Control at
or 800-810-4853 Option 1, then Option 3 for
actuator rental / exchange availability and repair schedule prior to removing actuator(s) from the aircraft.
•
This Customer Bulletin is a managed program and must be scheduled through Gulfstream Repair Control.
Gulfstream will manage a limited component rental / exchange pool. Operators performing this Customer Bulletin
may elect to utilize the rental / exchange pool while the end caps on their original components are replaced. Due
to a limited availability of assets, failure to schedule could result in significantly increased downtime.
Page 6 of 14
This proposal is confidential between Gulfstream and the Customer.
Dlirseh
Return to Table of Contents
GAC Rev. October 15. 2015
EFTA00589864
Giv
ID
R01
03 February 2016
Gulfstream GN Serial Number 1085
JEGE, LLC
PART I. Workscope Description (continued)
D. PAI
Not Requested
Page 7 of 14
This proposal is confidential between Gulfstream and the Customer.
Dfitseh
Return to Table of Contents
GAC Rev. October 15. 2015
EFTA00589865
1 i II 1.`,11)
i (
n
ri
ID or
R01
03 February 2016
Gulfstream GN Serial Number 1085
JEGE. LLC
PART II. Contingencies and Assumptions of Proposal Offer
Unless expressly stated otherwise in writing, this proposal and the Workscope pricing information included in Part I
Workscope, (-Proposer) is based upon the following contingencies and assumptions associated with the activity and work
required for the work scope defined in Part I Workscope (-Work-). Additional charges for any Customer-approved Work
ultimately performed on Gulfstream GIV aircraft, Serial Number 1085 ("Aircraft"), which is beyond the scope of this
Proposal will be billed on a time and materials basis, except as otherwise expressly agreed in writing between the parties.
The term Customer shall refer to JEGE, LLC ("Customer) in this Proposal.
A. ESTIMATED LEADTIME:
This Proposal provides for leadtimes. Leadtime is an estimate expressed in calendar days to allow for planning and
scheduling of the Aircraft service visit. Leadtimes commence upon Gulfstream's receipt of Customer's signed Proposal
and material callout selections. Leadtimes may be addressed by other relevant contingencies set out in this Proposal.
B. ESTIMATED DOWNTIME:
This Proposal provides for downtime. Any downtime estimates included in this Proposal are based upon Gulfstream's
general understanding of the time required to accomplish the work outlined in this Proposal. Said understanding is in turn
based upon Customer satisfying any leadtime requirements. Estimated downtime may be adjusted depending on the final
induction schedule and mutually agreed facility selected for completion of the Work. For the avoidance of doubt, any
expression of downtime is only provided as an estimate. This estimate is not a contractual commitment by Gulfstream.
Estimated downtime is stated in working days, defined as Monday through Friday, excluding applicable recognized local
holidays. If additional Work is required beyond that specifically identified in this Proposal, then the estimated downtime
may be extended by Gulfstream. Estimated downtime may increase or decrease depending upon the availability of the
mutually agreed facility selected for completion of the Work.
C. PRICING AND SCHEDULING TERMS:
This Proposal is contingent on all Work being accomplished during a single coordinated maintenance visit.
The quoted prices contained herein are valid (i) if the Proposal is signed and returned to Gulfstream within ninety (90)
days of the date of the Proposal, and (ii) the Work is scheduled to be accomplished at a mutually agreeable facility and
time within six (6) months from the date of this Proposal, and within the same calendar year as the date of this Proposal.
Gulfstream reserves the right to adjust the pricing in this Proposal it the foregoing conditions are not satisfied.
Unless otherwise indicated on the face of this Proposal, any proposal for Work in a Gulfstream US facility is valid for each
Gulfstream US facility. Proposals for work at any non-US Gulfstream facilities are specific and binding only as to the
facility identified on the Proposal.
Overtime: Gulfstream will not charge overtime for the Work required in this Proposal, unless there are (i) Discovered
Discrepancies as addressed below, (ii) Changes documented on Work Change Requests (WCRs) as described below, or
(iii) Customer requests to accelerate the estimated downtime for any Work. Customer must approve all overtime activity
prior to Gulfstream performing and billing for overtime.
Discovered Discrepancies: Except as specifically identified in PART I Workscope, this Proposal does not include repairs
to the Aircraft resulting from discrepancies in the Aircraft (including without limitation corrosion) discovered during the
performance of the agreed Workscope. All discovered discrepancies will be corrected upon request at additional charge
and with additional downtime. This process is further described in the Changes (VCRs") paragraph.
Page 8 of 14
This proposal is confidential between Gulfstream and the Customer.
Dlirseh
Return to Table of Contents
GAC Rev. Ocioter 15. 2015
EFTA00589866
ID # S
RO1
03 February 2016
Gulfstream GIV Serial Number 1085
JEGE. LLC
PART II. Contingencies and Assumptions of Proposal Offer (continued)
C. PRICING AND SCHEDULING TERMS (continued)
Changes ("WCRs"): This Proposal is subject to further financial and schedule modification, which will be documented on
work change requests ("WCRs") presented to the Customer for approval, if any of the following occurs:
•
Subsequent to the date of this Proposal, a relevant aviation regulatory authority or OEM (including Gulfstream)
publishes any change in relevant technical documentation which affects the Workscope.
•
Additional billable work, which is not specifically delineated in the Workscope, is required to perform the quoted
Workscope. This additional work may include by way of example relocation of existing aircraft equipment, beyond
that already defined in the Workscope, due to space limitations.
Consumables: There will be a 4.0% charge for consumables, to a maximum of $5,000, on all work orders containing
labor revenue charges. This charge will be calculated based on the total labor revenue man-hours invoiced on the work
order. Only invoices defined as 'Road Trip Invoice- will be exempt from this charge.
CFE, Drop Shipments and Handling Fees: Customer furnished parts or equipment ('CFE-) and drop shipments made
by the Customer to Gulf stream will be subject to a handling fee of 15% based on current manufacturer list price of the part
or item furnished. The handling fee will not apply to parts originally purchased from Gulfstream. Proof of purchase from
Gulfstream must be shown to waive the handling fee.
Third Party Vendors: Any estimates given for vendor parts, materials, or services provided to Gulfstream by outside
vendors, whether for repair, calibration, overhaul, exchange or the like, are subject to adjustment based upon the actual
charges billed to Gulfstream by such outside entity.
Excluded fees, taxes, etc.: All prices stated herein are exclusive of freight, fuel, flight costs, environmental fees, and/or
any applicable taxes.
Exchange Services — Retention of Removed Equipment: Any parts exchanged as part of the Workscope, and related
price adjustments will be governed by Gulfstream's then current parts exchange program. Except as specifically identified
in PART I Workscope, equipment removed as part of the Workscope will become the property of Gulfstream.
PlaneParts©: Except as specifically identified in a PART I Workscope. this Proposal does not take into account any parts
provided at no charge under Gulfstream's PlaneParts© oroaram. To enroll or learn more about the PlaneParts© program
please visit
D. GENERAL CONTINGENCIES:
Requirement for Customer Furnished Records: This Proposal is based upon the Aircraft being in the configuration,
and containing the equipment, as indicated in Gulfstream CMP records and any records supplied by Customer to support
this Proposal.
This Proposal is also contingent upon the Customer supplying, upon induction or within leadtimes, all avionic, electrical,
system, interior or structural drawings, diagrams, analysis and records, which accurately represent the current condition of
the aircraft ("Customer Records"), as approved by the relevant aviation authority, and which are required by Gulfstream to
conduct the Work.
Any changes which are required to be made by Gulfstream to the Customer Records, or due to the inadequacy of the
Customer Records, in connection with the Work, will be subject to additional charges. These additional charges will be
documented pursuant to the Changes ("WCRs") clause and subject to Customer approval.
Page 9 of 14
This proposal is confidential between Gulfstream and the Customer.
Dlifseh
Return to Table of Contents
GAC Rev. October 15. 2015
EFTA00589867
fv:
ID v
R01
03 February 2016
Gulfstream GN Serial Number 1085
JEGE. LLC
PART II. Contingencies and Assumptions of Proposal Offer (continued)
D. GENERAL CONTINGENCIES: (continued)
General Exceptions: Except as specifically identified in PART I Workscope:
•
Aircraft Preservation: This Proposal does not include any preservation tasks related to the Aircraft, its engines
or systems. Customer is responsible for making certain that all specific preservation tasks related to the Aircraft,
its engines or systems, which are required or may become required while the Aircraft is at Gulf stream's facility for
the Workscope. are identified on the Work Order.
•
Certification Basis: All Work to be accomplished by Gulfstream under the Workscope, assumes the Aircraft is
operated in compliance with FAR Part 91 or the equivalent not-for hire operating rules of the relevant aviation
authority.
•
Non-standard Equipment: Gulfstream is not responsible for vendor to vendor incompatibilities which may be
discovered during the course of the installation.
•
Manuals — Modifications: Changes to the Aircraft's Completion Center Maintenance Handbook (CCMH) or
Cabin Operating Manual (COM) are not included as part of this Proposal. Should a modified CCMH or COM be
requested by the Customer, it may be provided at additional charge. Any changes to the Aircraft's Minimum
Equipment List ("MEL") are the Customer's responsibility and are not included herein.
•
Access, Closure, Removal and Replacement: Access and closure, removal and replacement required to
perform the Workscope are not included as a part of this Proposal.
Touch-Up Paint: For aircraft with standard Gulfstream paint schemes (one (1) base color and two (2) stripes), the sealing
and touch-up (by brush) of panels is included in the Workscope. Aircraft with non-standard paint schemes will be subject
to an additional charge for the additional time required to complete the paint touch-up.
Unused Wiring: Any existing wiring or tubing made obsolete by the Work will be capped and stowed. Wiring or tubing
removal, if requested by the Customer, will be at additional charge.
Termination after acceptance of Proposal: Unless the Customer has specifically directed otherwise, once the Proposal
is signed and returned to Gulf stream, and prior to the Workscope being scheduled in accordance with Section C Pricing
and Scheduling Terms, this Proposal shall be binding upon Gulfstream as to the prices set forth herein. All preliminary
engineering materials and components ordered to support the Workscope. any labor expended, any restock charges
incurred, and any other direct costs supporting the Workscope are chargeable to the Customer if the proposed
Workscope is thereafter canceled by the Customer. If materials or components cannot be returned to their respective
vendor(s), Customer will be billed in full for these items. In such case, the materials and components become the property
of the Customer. If the Work is rescheduled for a later arrival, these charges will be applied to the rescheduled visit, as
appropriate.
Confidentiality: This Proposal and any related documents are strictly confidential between Gulfstream and Customer and
will not, without the prior written consent of the other party, be disclosed by either party, in whole or in part, to any third
party except to such party's accountants, lawyers, and bankers, and Gulfstream's suppliers, provided such third parties
agree to confidentiality as may be necessary for either party to carry out its obligations or enforce its rights pursuant to this
Proposal.
E. ADDENDUM TO PROPOSAL AND WORK AUTHORIZATION TERMS AND CONDITIONS
Not Applicable
Page 10 of 14
This proposal is confidential between Gulfstream and the Customer.
Dlitseh
Return to Table of Contents
GAC Rev. October 15. 2015
EFTA00589868
G
ID a
R01
03 February 2016
Gulfstream GN Serial Number 1085
JEGE, LLC
PART III. Payment Terms and Remittance Instructions
For customers with available credit, and except as set forth below, payment terms are net 30 days from date of invoice.
Unless otherwise agreed in writing, for Work estimated to exceed $100,000, Customer agrees to make progress
payments on the following schedule: 50% of the estimated amount prior to commencement of Work on the Aircraft, and
final payment of the remaining 50% 30 days from the date of final invoice. Additional deposits may be required for long-
lead or special purchased parts, which are not refundable. should the visit be cancelled or work scope changed to
eliminate those items. Additional deposits may also be requested if there is a significant amount of growth in the scope of
the Work, including significant material costs. If any portion of an invoice is disputed, then Customer shall nevertheless
pay all undisputed amounts per this schedule. Gulfstream shall not be required to release Customers Aircraft to depart if
Customers total outstanding balance owed to the Gulfstream Parties exceeds the lesser of $150,000.00 or Customer's
available credit limit. All sums past due bear interest at the lesser of 1.5% per month, or the maximum rate allowable by
law, plus reimbursement for attorney fees and other costs of collection. For customers without available credit, including
those without open credit terms (cash in advance, cash on delivery, etc.), as additional items are added to the Work,
additional progress payments may be required to continue Work on the Aircraft and all remaining outstanding balances
must be paid prior to Aircraft departure.
See the Work Authorization terms and conditions for further details on payment terms.
If Applicable, Aircraft Records and Condition Survey ("ARCS"). ARCS fees are payable in advance of the inspection
being performed. Acceptable methods of payment related to ARCS and supporting aircraft sales transactions include
payment via wire transfer/ACH, certified check and Gulfstream accepted credit card. Costs incurred in remediation of
discrepancies documented during the ARCS or required in conjunction with the supporting aircraft sales transaction are
immediately due upon completion of the ARCS and prior to the departure of the aircraft. This section applies to all
customers, including those who have available credit.
Remittance can be made to the following:
Checks:
Gulfstream Aerospace Corporation
(Overnight) Gulfstream Aerospace Corporation (Box #730349)
P.O. Box 730349
c/o JP Morgan Chase Bank, NA
Dallas. TX 75373-0349
Attn: Dallas National Wholesale Lockbox TX1-0029
14800 Frye Road
Ft. Worth, TX 76155
Wire Transfer Gulfstream Aerospace Corporation
Instructions:
JP Morgan Chase Bank, NA
1 Bank One Plaza
Chicago, IL 60670
Account No. 10-15825
Reference your Five (5) Digit Customer Number (XX-XXX)
Bank
Fedwire Routing No. (ABA) 021 000 021
Identifiers:
S.W.I.F.T CHASUS33
ACH Credit Routing No. (ABA) 071 000 013
Note: Please reference the Quote ID Number and one of the following (as applicable):
•
Invoice Number
•
Sales Order Number
•
Job or Work Order Number
•
Aircraft Serial or Registration Number
•
Customer Account Number
Page 11 of 14
This proposal is confidential between Gulfstream and the Customer.
Dlitseh
Return to Table of Contents
GAC Rev. October 15. 2015
EFTA00589869
in,
ID ir
801
03 February 2016
Gulfstream GN Serial Number 1085
AGE. LLC
PART IV. Executive Summary and Proposal Acceptance
Please select items in Accept/Decline columns. Once an item is accepted, the amount will auto populate the total. (Please
note that quoted dollars and downtime may vary based on concurrent work with accepted/declined items.)
A. INTERIOR
B. AVIONICS / CABIN ELECTRONICS
ASC 477 NZ 2010 V6.1 - TRIPLE
Synthetic Vision (PDSV) - Provisions
ASC 476B V1.10 Software Enhancements
ASC 415B Indicating and Recording - Upgrade SPZ-800018400
1.1
1.2
1.3
1.4
C. MECHANICAL
Aircraft Maintenance
2.1
12 Month CMP Tasks
2.2
24 Month CMP Tasks
2.3
36 Month CMP Tasks
2.4
150 Hour CMP Tasks
2.5
150 Cycle CMP Tasks
2.6
Miscellaneous CMP Tasks
2.7
CB 227 Replacement, Oxygen System Flexible Hoses
2.8
CB 232A Modification, Aircraft Main Battery Chargers
2.9
CB 235 - Main Landing Gear Door Actuator End Cap Replacement - Life Limit
(USD)
Accept Decline
$168.250
$35,000
See Item
$28.744
D. PAINT
QUOTED WORKSCOPE TOTAL BASED ON CUSTOMER ACCEPTED ITEMS
'Default value Is set to SO until Customer selections have been made above.
$6.386
$37,063
$32.621
$1,527
$833
$15,686
$11.425
I
See Item
$3.936
Estimates based on Quoted Workscope
, Materials/Outside Services for CMP Inspection Package(s)'
$13,150
The estimated amount includes items marked with an *X" on the attached CMP Exhibit(s). The estimates are for planning purposes only
and are subject to pricing and availability at the time of aircraft induction.
Page 12 of 14
This proposal is confidential between Gulfstream and the Customer.
Dlitseh
Return to Table of Contents
GAC Rev. October 15. 2015
EFTA00589870
ID # S
R01
03 February 2016
Gulfstream GN Serial Number 1085
JEGE, LLC
PART IV. Executive Summary and Proposal Acceptance (continued)
Schedule Planning
Estimated Days
Estimated Leadtime'
See Note
'The above leadtime is an estimate expressed in calendar days to allow for planning and scheduling of the Aircraft service visit and will
commence upon Gulfstream's receipt of Customer's signed Proposal and material callout selections. Leadtimes may be addressed by
other relevant contingencies set out in this Proposal.
Note: This proposal contains items that are managed programs. Please contact your Regional Sales Manager for leadtime. Typical
leadtimes for this item/workscope are 30 calendar days.
Estimated Downtime'
20 Working Days
2The above downtime estimate is based upon Gulfstream's general understanding of the time required to accomplish the work outlined in
this Proposal. Said understanding is in turn based upon Customer satisfying any leadtime requirements. Estimated downtime may be
adjusted depending on the final induction schedule and mutually agreed facility selected for completion of the Work. For the avoidance of
doubt, any expression of downtime is only provided as an estimate. This estimate is not a contractual commitment by Gulfstream.
Estimated downtime is stated in working days. defined as Monday through Friday. excluding applicable recognized local holidays. If
additional Work is required beyond that specifically identified in this Proposal, then the estimated downtime may be extended by
Gulfstream. Estimated downtime may increase or decrease depending upon the availability of the mutually agreed facility selected for
completion of the Work.
Input Facility
Gulfstream West Palm Beach
1500C Perimeter Road
West Palm Beach. Florida 33406
Main Phone:
Note: Changes to facility input may affect downtime. Please contact your Regional Sales Manager.
Quote Validity
Pricing contained in this proposal is valid for 90 days from the date of this proposal.
For further details/definition, see Part II Section C or li h r
Pricing
•
This proposal supersedes proposal
ROO dated 05 January 2016.
•
If Cadmium Plating Degradation is found during the Wing Tank Internal Inspection, estimated repairs cost can be
$35,000 in labor and materials depending on the condition of the aircraft.
Page 13 of 14
This proposal is confidential between Gulfstream and the Customer.
DIfseh
GAC Rev. October 15. 2015
Return to Table of Contents
EFTA00589871
ID a
R01
03 February 2016
Gulfstream GN Serial Number 1085
JEGE. LLC
PART IV. Executive Summary and Proposal Acceptance (continued)
Upon acceptance of this Proposal, the prices and quotes stated herein (subject to all contingencies or other stated
assumptions) constitute a formal Fixed Price Quote, which is included in Gulfstream's standard Work Authorization
Agreement Terms and Conditions. Your acceptance of all or any portion of this Proposal confirms your acknowledgement
that you have read and express agreement to be bound by these terms.
This Proposal expressly incorporates by reference and is subject to Gulfstream's standard Work Authorization Agreement
Terms and Conditions which are attached hereto as ATTACHMENT A. The Work Authorization, which will include a Work
Order which details all items of Work to be accomplished during the service visit, including those items selected and
documented by Customer from this Proposal, will constitute the agreement between the parties and will supersede this
Proposal when executed by both parties. The Work Authorization will be signed at the Aircraft's induction into the agreed
Gulfstream Service Center.
IN WITNESS WHEREOF, the parties have caused this Proposal to be executed by their duly authorized representatives.
Copies of a fully executed agreement. emailed between the parties will be effective as an original signed agreement.
JEGE, LLC
("Customer")
GULFSTREAM AEROSPACE CORPORATION
("Gulfstream")
By:
By:
Name:
Name: Rusty Cramer
Title:
Title:
Regional Sales Manager, Product Support Sales
Date:
Date:
03 February 2016
Please complete and return all pages of PART IV via fax (
or email
Page 14 of 14
This proposal is confidential between Gulfstream and the Customer.
Dlitseh
Return to Table of Contents
GAC Rev. Ocioter 15. 2015
EFTA00589872
ATTACHMENT A
WORK AUTHORIZATION AGREEMENT TERMS AND CONDITIONS
1. AGREEMENT.
This Work Authorization Agreement, including documents incorporated by reference, (the
"Agreement") identifies the services and materials (the "Work") to be provided by Gulfstream. its employees, agents.
representatives, and contractors, (collectively "Gulfstream") to the aircraft identified on the first page of this Agreement
(the "Aircraft") plus the associated terms and conditions of the Agreement. "Customer" means collectively the customer
identified on the first page hereof, and all owners, operators. lessors, lessees and insurers of the Aircraft. "Gulfstream
Parties" means Gulfstream. General Dynamics Corporation and each of their affiliates, including without limitation the Jet
Aviation companies ("Jet Aviation"), and all such entities' employees, agents. representatives and contractors. This
Agreement is the parties' entire agreement concerning the Work and replaces prior verbal or written agreements with
respect thereto. This Agreement's terms and conditions (but excluding changes in the scope of the Work and overtime
authorizations) may not be altered except by a writing that expressly references this Agreement and is signed by
authorized representatives of both parties.
2. WORK CHANGES. Customer authorizes Gulfstream to expend labor and materials reasonably appropriate to the
mutually agreed Work. Work changes (including requests for overtime) require mutual agreement of the parties.
Customer's oral changes increasing the scope of the Work or approving overtime are binding (unless otherwise provided
by law). Customer payment of the invoice for any additional Work item is customer acknowledgement that the additional
item was mutually agreed upon as part of the Work.
3. PRICING. Except as otherwise specifically agreed between the parties in writing, all Work (including engineering
services) performed under this Agreement is on a TIME AND MATERIALS BASIS unless expressly subject to a formal
fixed-price quote signed by both Gulfstream and Customer. ESTIMATES OF EXPECTED HOURS/MATERIAL
COSTS ARE NOT QUOTES AND ARE BILLED SOLELY ON A TIME AND MATERIALS BASIS. For time and
materials Work: (a) labor (including engineering services) is billed according to the rates set forth in the Gulfstream
Aircraft Services Rate Letter in effect as of the date the Work is performed: and (b) materials are billed according to
Gulfsueam's standard prices in effect on the date the material is used. Any incremental charge under Gulfsueam's
Component Exchanged Program will be billed by supplementary invoice.
4. PAYMENT TERMS. For customers with available credit, and except as set forth below, payment terms are net 30
days from date of invoice. Unless otherwise agreed in writing, for Work estimated to exceed One Hundred Thousand
Dollars ($100,000.00), Customer agrees to make progress payments on the following schedule: 50% of the estimated
amount prior to commencement of Work on the Aircraft, and final payment of the remaining 50% 30 days from the date of
final invoice. Additional deposits may be required for long-lead or special purchased parts, which are not refundable,
should the visit be cancelled or work scope changed to eliminate those items. Additional deposits may also be requested if
there is a significant amount of growth in the scope of the Work, including significant material costs. If any portion of an
invoice is disputed, then Customer shall nevertheless pay all undisputed amounts per this schedule. Gulfstream shall not
be required to release Customer's Aircraft to depart if Customer's total outstanding balance owed to the Gulfstream Parties
exceeds the lesser of One Hundred Fifty Thousand ($150,000.00) or Customer's available credit limit. All sums past due
bear interest at the lesser of 1.5% per month, or the maximum rate allowable by law, plus reimbursement for attorney fees
and other costs of collection. For customers without available credit, including those without open credit terms (cash in
advance, cash on delivery, etc.). as additional items are added to the Work, additional progress payments may be required
to continue Work on the Aircraft and all remaining outstanding balances must be paid prior to Aircraft departure.
5. TAXES. Customer is responsible for all Federal. State. local and foreign taxes, fees, levies. penalties, excises.
charges, surcharges, import and export charges and other duties and tariffs (—Taxes") applicable to the Work performed
hereunder, the materials used or transportation (other than taxes on income of Gulfstream) and Customer shall indemnify
and hold Gulfstream harmless with respect thereto.
5.1 Any and all payments by the Customer under the terms of this Agreement shall be exclusive of any Taxes. Customer
shall bear, and shall indemnify Gulfstream for any such Taxes in the event they are or become due at any time in
accordance with the applicable laws and regulations. Should customer be required by applicable law to withhold or deduct
any Taxes from such payments, then the sum payable shall be increased as necessary so that after making all required
deductions, Gulfstream receives an amount equal to the sum it would have received had no such deductions been made.
GAC Rev. Jan. 21.2016
1 of 4
EFTA00589873
6. WARRANTY.
6.1 GENERAL. Gulfstream warrants that the Work conforms to the pertinent specifications prescribed by the applicable
aircraft/component manufacturer, and that any components or other items supplied hereunder (but excluding Customer-
furnished items) are free from defects in material and workmanship. This warranty extends to defects discovered within
twelve (12) months, or one thousand (1.000) flight hours, whichever comes first, after completion of the Work: except that
the warranty period for any Work performed as warranty work is equal to the pre-existing unexpired warranty period.
Pans qualifying for the "Exclusive Gulfstream Parts Warranty Extension" Program, or other extended published
Gulfstream warranty programs, if any, are entitled to an extended warranty period pursuant to the terms of such programs
as they exist on the date this Agreement is executed. To the extent that any Work is being performed as warranty work
under a service center warranty originally extended by a Gulfstream Party to a prior owner or operator of the Aircraft, then
this Agreement shall constitute an assignment of such original warranty to Customer except that the terms and conditions
thereof shall be those in this Agreement (including Sections 7, 8 and all other disclaimers and limitations in this
Agreement).
6.2 REMEDY. Gulfstream's sole obligation for breach of warranty for Work other than inspection activities, and
Customer's sole remedy. is limited to the repair. replacement or correction (at Gulfstream's reasonable discretion) of the
defective Work. All parts and labor required for disassembly. removal, installation and reassembly of the defective item
are Gulfstream's expense. but only if the Work is performed at a Gulfstream or Jet Aviation facility authorized to work on
the applicable aircraft model. Gulfstream is not responsible for any costs or expenses associated with transporting the
Aircraft or warranted items to any repair facility. Gulfstream's sole obligation for negligent or otherwise defective
inspection activities, including any damage to an Aircraft that results from any alleged negligent inspection, and
Customer's sole remedy, is limited to refund of any payments made by Customer for that portion of such inspection that
was defective.
6.3 ADDITIONAL REMEDY FOR COLLATERAL AIRCRAFT DAMAGE.
63.1
In addition to the warranty remedy provided in Section 6.2, but subject to Section 6.3.2 below, if any defective
Work, negligence or willful misconduct of a Gulfstream Party related to performance of this Agreement causes damage to
the Aircraft within the warranty period set out in Section 6.1. then as Customer's sole remedy Gulfstream will repair at no
charge (as further described below) any such Aircraft damage that is directly and immediately caused by a Gulfstream
Party. Such repairs will be accomplished at a Gulfstream or Jet Aviation facility authorized to work on the aircraft model,
and on the same terms and conditions hereof (excluding payment obligations) using methods selected by Gulfstream in its
reasonable discretion: provided, however, if Gulfstream reasonably deems the Aircraft to be damaged beyond economical
repair, then the sole remedy is for Gulfstream to pay Customer the Aircraft's pre-damage fair market value and for
Gulfstream to receive clear title thereto.
63.2
Notwithstanding anything else in this Agreement, Gulfstream's remedy obligations under this Agreement shall
not include Aircraft damage that either (a) allegedly is caused by a negligent inspection where the damage occurs after
completion of the Work or (b) is caused by a Right Operations Accident (as defined below) even if such accident is
allegedly caused by a Gulfstream Party (including negligence of a Gulfstream employed flight crew member on the
Aircraft). "Flight Operations Accident" means an accident or incident occurring between ramp movement for flight
through takeoff, flight, landing, taxi and parking in which the Aircraft suffers damage from contact with the earth or other
objects.
6.4 TERNIINATION OF WARRANTY. The warranties and Gulfstream's obligations for the repair of Aircraft
Damage set forth above in Section 6 are void if either the Aircraft or warranted item have been subjected to maintenance.
overhaul, installation, storage. operation, or use which is improper or not in accordance with the aircraft/component
manufacturer's instructions (including failure to comply with approved operating and maintenance manuals, instructions
or bulletins. or customary maintenance or airmanship practices), or to any accident or casualty that proximately causes or
contributes to the failure or substandard performance of the warranted item or further damage to the Aircraft.
6.5 CUSTOMER'S OBLIGATIONS. Gulfstream's warranty obligations hereunder are expressly conditioned upon
compliance with all of the following: Customer must provide Gulfstream with written notice within 60 days after the
defect becomes apparent: Customer must return or otherwise dispose of the item at issue as directed by Gulfstream within
30 days after receipt of Gulfstream's instructions: and Customer shall maintain and make available to Gulfstream all
records (including FDR, CVR and other aircraft recorded data) reasonably related to the maintenance, use and condition of
the item at issue.
GAC Rev. Jan. 21.2016
2 of 4
EFTA00589874
7. DISCLAIMERS. THE EXPRESS WARRANTIES IN SECTION 6 OF THIS AGREEMENT ARE EXCLUSIVE
AND IN LIEU OF ALL OTHER WARRANTIES (EXCEPT FOR THE WARRANTY OF TITLE) AND
REPRESENTATIONS, EXPRESS, IMPLIED, OR STATUTORY, INCLUDING WITHOUT LIMITATION IMPLIED
WARRANTIES OF MERCHANTABILITY AND FITNESS (INCLUDING FITNESS FOR A PARTICULAR
PURPOSE) (COLLECTIVELY "EXCLUDED WARRANTIES"). Except as expressly set forth in this Agreement,
Customer, on behalf of itself and all owners, operators, lessors, lessees, and insurers of the Aircraft, hereby waives and
releases all rights, claims, and remedies (through subrogation or otherwise) with respect to any and all Excluded
Warranties, duties, obligations, and liabilities in tort or contract arising by law or otherwise from this Agreement or the
Work, including: (I) liability for a Gulfstream Party's own negligence or (2) strict liability or product liability. For the
avoidance of doubt, this Section 7 does not modify the rights and obligations of Gulfstream and Customer (or owner of
Aircraft if different from Customer), as expressly stated in any Gulfstream Aircraft Warranty Agreement between the
parties.
8. EXCLUSION OF ALL OTHER DAMAGES. Notwithstanding anything else in this Agreement, the Gulfstream
Parties shall not be liable for punitive, special. incidental or consequential damages that arise from or relate in any way to
this Agreement, or the Aircraft's presence at a Gulfstream Patty's facility as a result of this Agreement. whether arising
out of contract, warranty, tort or by statute or otherwise. Such excluded damages include damages for loss of use, loss of
time, inconvenience, diminution in value or commercial loss. THE EXCLUSION OF SUCH DAMAGES AS SET
FORTH HEREIN SHALL APPLY NOTWITHSTANDING ANY OTHER PROVISION OF THIS AGREEMENT,
SHALL BE DEEMED INDEPENDENT OF ALL WARRANTIES, AND OTHER PROVISIONS OF THIS
AGREEMENT, AND SHALL SURVIVE ANY FAILURE OF THE ESSENTIAL PURPOSE OF ANY
WARRANTY OR LIMITED REMEDY UNDER THE TERMS OF THIS AGREEMENT.
9. INCIDENTAL CUSTOMER PROPERTY. Gulfstream assumes no responsibility or liability for any Incidental
Customer Property brought or delivered to Gulfstream's premises by Customer, whether on the Aircraft or otherwise.
"Incidental Customer Property" is any item associated with the Aircraft, its crew, representatives of the Customer, or its
passengers, that is not a part of the certified Aircraft or directly related to its operation. such as loose aircraft or cabin
equipment. typical catering supplies, or the like. Gulfstream reserves the right to decline to store any Incidental Customer
Property on its premises which it deems, in its sole discretion, inappropriate or dangerous. The Customer is responsible
for importing or exporting of Incidental Customer Property into or out of the boundaries of any nation and must adhere to
all applicable import or export control laws and regulations. including without limitation Export Administration
Regulations ("EAR") and International Traffic in Arms Regulations ("ITAR") for entries into and out of the United States.
The Customer hereby agrees to defend, indemnify, and hold Gulfstream harmless from any and all claims made against
Gulfstream arising out of Incidental Customer Property brought or delivered to Gulfstream's facilities, including losses
incurred because of damage or theft, improper shipping or receiving, together with any criminal or civil penalties or other
duties, imposts, taxes, liens or other obligation imposed by any governmental entity resulting from the presence of
Incidental Customer Property on Gulfstream's facilities.
10. LIABILITY TO THIRD PARTIES. The limitations of liability in these terms and conditions will not be
interpreted to affect in any way a Gulfstream Party's obligations, if any, for third party personal injury, wrongful death or
property damage other than the Aircraft or its contents.
U. NO BAILMENT. No bailment is created by this Agreement, and Gulfstream shall not act as insurer of the Aircraft
or any Incidental Customer Property while the Aircraft or Incidental Customer Property is present at Gulfstream's facility
or otherwise in Gulfstream's custody or control.
12. NO DELAY PENALTY. Gulfstream will use reasonable efforts to complete the Work in a timely manner.
Reasonable efforts does not include overtime unless the Customer agrees to bear overtime charges. Notwithstanding such
obligation. Gulfstream shall not under any circumstances be liable for damages. late delivery penalty. fee or the like
should it fail to perform the Work within any period of time specified by the Parties.
13. ACCEPTANCE OF DELIVERY. Gulfstream will tender the Aircraft to Customer for delivery at the facility
where the Work was performed. unless otherwise agreed in writing. Customer shall promptly inspect the Work, and, upon
correction or Customer approved deferral of any discrepancies in such Work, Customer shall accept the Aircraft.
14. TITLE. Title to all materials installed in the Aircraft under this Agreement does not pass until acceptance and
payment of the Work by Customer, through delivery of the Aircraft or as otherwise mutually agreed in writing.
GAC Rev. Jan. 21.2016
3 of 4
EFTA00589875
15. EXCESS STORAGE CHARGE. Unless otherwise agreed between the parties in writing, should Customer's
Aircraft remain at Gulfstream's facility following completion of the Work for more than five (5) days. for whatever reason
(including a failure to pay for the Work performed), Gulfstream is authorized by Customer to charge the prevailing rate for
day storage of aircraft as then charged by Fixed Base Operators for aircraft of similar size on the airport where the Aircraft
is stored (but not less than $200.00 per day). Unless otherwise expressly agreed in writing as part of this Agreement.
Gulfstream is under no obligation to provide any maintenance services whatsoever to the Aircraft while being stored under
this provision and any dilapidation of the Aircraft during such storage period shall be Customer's sole responsibility.
16. SAFETY AND SECURITY. Customer's employees, agents. subcontractors and representatives shall abide by all
applicable Gulfstream policies, procedures and safety protocols when present on Gulfstream's premises.
17. INDEMNITY BY CUSTOMER ENTERING GULFSTREANI'S PREMISES FOR PERSONAL INJURY
AND DAMAGE TO OTHER PROPERTY. Customer assumes the risk of and agrees to indemnify and hold harmless
the Gulfstream Parties from and against any and all liability, damage, loss, cost and expense, including attorney's fees, on
account of any claim, suit or action made or brought against a Gulfstream Party (including claims brought against a
Gulfstream Party because of a Gulfstream Party's own negligence) for the death of or injury to employees, agents.
representatives and subcontractors of Customer, or damage or destruction of property of Customer, its employees, agents.
representatives or subcontractors, (other than damage or destruction of the Aircraft upon which Work is performed. which
is addressed elsewhere under this Agreement) sustained arising from or related to Customer's presence on the Gulfstream
Party's facilities (including its hangars and ramps but excluding a Gulfstream Party's customer lobby and customer
briefing rooms) during the course of the Agreement, except for the willful misconduct of a Gulfstream Party or its
employees acting within the scope of their employment.
18. ARBITRATION. Any controversy or claim arising out of either this Agreement or Customer's service visit to
Gulfstream shall be governed by the laws of the State of Georgia, without regard for rules concerning conflicts of law, and
settled by one (1) arbitrator (except if the claim is in excess of Two Million Dollars ($2.000,000.00), then by three (3)
neutral arbitrators) under the Commercial Arbitration Rules of the American Arbitration Association ("AAA") in the City
where the work hereunder was performed If the arbitration proceedings shall be conducted before a panel of three neutral
arbitrators, the panel shall be selected using the following process: Within 15 days after the commencement of arbitration.
each party shall select one person meeting the specified qualifications to act as neutral arbitrator, and the two thus selected
shall select a third neutral arbitrator meeting the specified qualifications within 15 days of their appointment to act as the
chair of the arbitration panel. If the arbitrators selected by the parties are unable to or fail to agree upon the third
arbitrator, the third arbitrator shall be selected by the American AAA. In an arbitration with a single arbitrator, the parties
shall use their best efforts to agree upon an arbitrator(s) within thirty (30) days after service of the claim. and if agreement
is not reached by such date then either party may request the AAA to appoint an arbitrator(s) in accordance with its rules.
The UnitedNations. Convention on Contracts for the International Sale of Goods (frequently referred to as the "UNCISG")
shall not apply.
19. MISCELLANEOUS. If any provision of this Agreement is held invalid under applicable law. such provision will
be ineffective only to the extent of such invalidity without invalidating the remainder of this Agreement. If there is any
conflict between these terms and conditions hereof and any document incorporated herein by reference. then these terms
and conditions shall control unless such document expressly states the contrary. The words -include.- "including" and
variations thereof are not terms of limitation and shall be deemed followed by "without limitation." Exports or re-exports
of commodities, technology and software provided as part of the Work are subject to the U.S. Export Administration
Regulations and diversion contrary to U.S. law is prohibited. Customer shall comply with all applicable U.S. export laws
and regulations. The failure of any of the parties to exercise any right under this Agreement shall not be construed as a
waiver or relinquishment for the future enforcement of such right at any time
20. AUTHORIZATION OF AIRCRAFT OWNER/LESSOR/LESSEE. The person signing this Agreement on
behalf of Customer represents, warrants and affirms that he is an AUTHORIZED AGENT OF THE AIRCRAFT
OWNER(S), and, if applicable, lessor(s) and/or lessee(s) with full authority to enter into this Agreement and bind such
owner(s), lessor(s), or lessee(s), with respect to all Work contemplated herein and on behalf of himself and his employer
agrees to indemnify Gulfstream for all losses arising from any breach of this representation and warranty.
Customer Acknowledgement:
By:
Name:
Title:
GAC Rev. Jan. 21.2016
4 of 4
EFTA00589876
[DI
R01
Mandatory Code
Related Code Code Description
Included In
Material
Estimate
12 Month CMP Tasks (Exhibit 1)
237004
Cockpit Voice Recorder System - Operational Test
240250
Emergency Securaplane Battery No. 1 - BITE / Battery Level Test
240251
Emergency Securaplane Battery No. 2 - BITE / Battery Level Test
240252
Emergency Securaplane Battery No. 3 - BITE / Battery Level Test
240253
Emergency Securaplane Battery No. 4 - BITE / Battery Level Test
250001•
ICA for LCD Monitor
250002•
ICA for 406MHZ ELT
256110
Emergency Locator Transmitter - Operational Test (FAR 91.207)
256105
Emergency Locator Transmitter - Removal / Installation
256269
LIFE VESTS-INTEG. CHECK
262582
EXT. H2O AFT CABIN-INSPECT
262621
Portable Halon Fire Extinguisher (Right Cockpit) - Weight Cheek
262601
Portable Halon Fire Extinguisher (Right Cockpit) - Removal / Installation
262622
Portable Halon Fire Extinguisher (Forward Cabin) - Weight Cheek
262612
Portable Halon Fire Extinguisher (Forward Cabin) - Removal / Installation
262623
Portable Halon Fire Extinguisher (Aft Cabin) - Weight Check
262603
Portable Halon Fire Extinguisher (Alt Cabin) - Removal / Installation
262633
Portable Halon Fire Extinguisher (Alt Cabin) - Inspection
270011
Control Surface Hinge Joints - Lubrication
271029
Aileron Actuator Load Relief Bungee (Left) - Inspection
271039
Aileron Actuator Load Relief Bungee (Right) - Inspection
273056
Elevator Actuator Load Relief Bungee - Inspection
312015
Pilot Clock Battery - Replacement
312016
Copilot Clock Battery - Replacement
322042
Nose Gear Axle Assembly - Corrosion Prevention
320027
Nose Landing Gear Axle Assembly - Corrosion Inhibiting Compound Application
322035
Nose Gear Axle Fitting - Removal / Installation
324009
Nose Gear Wheel Assembly (Lett) - Removal / Installation
324049
Nose Gear Wheel Bearings (Left) - Inspection / Pack
324010
Nose Gear Wheel Assembly (Right) - Removal / Installation
324050
Nose Gear Wheel Bearings (Right) - Inspection / Pack
330007
Emergency Exit Lights - Operational Test
330010
Exterior Lights - Operational Test
344095
IRU No. 1 Securaplane Battery - BITE / Battery Level Test
344096
IRU No. 2 Securaplane Battery - BITE / Battery Level Test
344097
IRU No. 3 Securaplane Battery - BITE / Battery Level Test
351005
Crew Oxygen System (Pilot) - Operational Test
351006
Crew Oxygen System (Copilot) - Operational Test
351007
Crew Oxygen System (Observer) - Operational Test
521003
Main Entrance Door - Lubrication
521008
Main Entrance Door Inflatable Seal System - Operational Test
521009
Baggage Door Inflatable Seal System - Operational Test
521080
Inflatable Door Seal - Purging Procedure
523004
Baggage Door - Lubrication
534015
Main Landing Gear Installation (Left) - Inspection
534016
Main Landing Gear Installation (Right) - Inspection
534018
Main Landing Gear Wheel Well Compartment - Inspection
534020
Nose Wheel Well and Gear - Inspection
571030
Wing Vertical Breather Angle - Inspection
710019
LH Powerplant Internal - Inspection
711009
Cowl Latch. Engine (Lett) - Rigging
710019 (710020)
RH Powerplant Internal - Inspection
711010
Cowl Latch. Engine (Right) - Rigging
24 Month CMP Tasks (Exhibit 2)
212077
Air Conditioning Shutoff Valve Filter (Left) - Inspection
212061
Air Conditioning Shut-ott Valve Filter (Left) - Removal / Installation
212078
Air Conditioning Shutoff Valve Filter (Right) - Inspection
212062
Air Conditioning Shut-ott Valve Filter (Right) - Removal / Installation
212115
Nose Compartment Cooling System - Operational Test
213053
Cabin Pressure Warning Indication System - Functional Test
213081
Pressurization Safety Valve - Inspection
213080
Cabin Pressurization Safety Valve - Removal / Installation
213083
Pressurization Safety Valve - Ground Test
213052
Cabin Pressure Waming Snitch - Removal / Installation
213085
Pressurization System - Operational Test
Page 1 ol 6
EFTA00589877
IDN
R01
Mandatory Code
Related Code Code Description
Included in
Material
Estimate
213090
Cabin Pressure Controller (Manual Mode) - Operational Test
216097
Air Cycle Machine Compressor Outlet Overheat Switch (Left) - Trip Point Check
216095
Air Cycle Machine Compressor Outlet Overheat Switch (Left) - Removal / Installation
216098
Air Cycle Machine Compressor Outlet Overheat Switch (Right) - Trip Point Check
216096
Air Cycle Machine Compressor Outlet Overheat Switch (Right) - Removal / Installation
236010
Static Discharger Wick (Left Wing) - Resistance Check
236011
Static Discharger Wick (Right Wing) - Resistance Check
236014
Static Discharger Wick (Left Horizontal Stabilizer) - Resistance Cheek
236015
Static Discharger Wick (Right Horizontal Stabilizer) - Resistance Check
236016
Static Discharger Wick (Vertical Stabilizer) - Resistance Check
236020
Static Discharger Wick (Tail Cone) - Resistance Check
237041
CVR Underwater Locator Beacon (DK100 / DK120) - Operational Test
237047
CVR Underwater Locator Beacon - Battery Voltage Check (DK100 / DK120)
237005
CVR Unit - Removal / installation
237025
CVR Underwater Locator Beacon - Replacement (0K100)
237048
CVR Underwater Locator Beacon - Switch Cleaning (DK100 / DK120)
243030
Auxiliary TRU - Inspection / Cleaning
243189
Battery Circulating Fan - Operational Test
251125
Crew Seat Inertia Reels - Operational Test
256112
WELT Registration (NO.2 RAFT)
261035
Engine Alternator Overheat Switch (Left) - Trip Point Cheek
261025
Engine Alternator Overheat Switch (Left) - Removal / Installation
261036
Engine Alternator Overheat Switch (Right) -Trip Point Check
261030
Engine Alternator Overheat Switch (Right) - Removal / Installation
261065
Combined Hydraulic System Overheat Switch - Trip Point Check
261055
Combined Hydraulic System Overheat Switch - Removal / Installation
261066
Flight Hydraulic System Overheat Switch - Trip Point Cheek
261060
Flight Hydraulic System Overheat Switch - Removal / Installation
261235
Bleed Air Manifold Overheat Switch (Left) - Trip Point Check
261225
Bleed Air Manilold Overheat Switch (Left) - Removal / Installation
261236
Bleed Air Manifold Overheat Switch (Right) - Trip Point Check
261230
Bleed Air Manifold Overheat Switch (Right) - Removal / Installation
261440
APU Overheat Switch - Trip Point Check
261415
APU Fire Detection Switch (Top) - Removal / Installation
261420
APU Fire Detection Switch (Bottom) - Removal / Installation
261425
APU Fire Detection Switch (Above Alternator) - Removal / Installation
261430
APU Fire Detection Switcli AN Inlet) - Removal / Installation
262075
Fire Bottle (APU) - Weight Cheek
262035
APU Fire Bottle - Removal / Installation
262155
Fire Pull Handle - Operational Test
262165
Fire Extinguisher System (Left) - Functional Test
262166
Fire Extinguisher System (Right) - Functional Test
262170
Fire Extinguisher System (APU) - Functional Test
270006
Shutoff Valve. Flight Control Manual - Operational Test
276001
Ground Spoiler System - Operational Test
276004
Ground Spoiler Fault Detection System - Functional Test
282073
APU Wing Fuel Shut-off Valve - Functional Test
301005
Wing Anti-Ice (Left) - Operational Test
301006
Wing Anti-Ice (Right) - Operational Test
302005
Cowl Anti-Ice (Left Engine) - Operational Test
302006
Cowl Anti-Ice (Right Engine) - Operational Test
303009
Total Temperature Probe Heat System - Operational Test
303012
Angle of Attack Heat - Operational Test
320009
Landing Gear (Left Main) Corrosion Inhibiting Compound Reapplication
320010
Landing Gear (Right Main) Corrosion Inhibiting Compound Reapplication
320034
Nose Landing Gear Corrosion Inhibiting Compound Reapplication
321041
Main Gear Shock Absorber (Left) - Service
321042
Main Gear Shock Absorber (Right) - Service
322006
Nose Gear Shock Strut - Friction Check
322028
Nose Gear Shock Strut - Service
322433
Nose Landing Gear Spring Rod Assembly - Lubrication
322430
Nose Landing Gear Spring Rod Assembly - Removal / Installation
323003
Nose Landing Gear Sequencing Linkage - Check / Adjustment
323002
Landing Gear Cycling - Operational Check
322434
Main Landing Gear Bungee (Left) - Lubrication
322431
Main Landing Gear Bungee (Loll) - Removal / Installation
322435
Main Landing Gear Bungee (Right) - Lubrication
322432
Main Landing Gear Bungee (Right) - Removal / Installation
Page 2 of 6
EFTA00589878
ID#
R01
Mandatory Code
Related Code Code Description
Included in
Material
Estimate
323001
Landing Gear - Normal - Functional Test
291057
Combined / Flight Hydraulic System Reservoir - Filling Procedures
323004
Landing Gear - Emergency - Functional Test
323115
Bottle. Landing Gear Air - Service
323025
Main Gear Side Brace Fitting Pin (Left) - Inspection
323015
Side Brace Actuator (Left) - Removal / Installation
323026
Main Gear Side Brace Fitting Pin (Right) - Inspection
323016
Side Brace Actuator (Right) - Removal! Installation
324101
Wheel Brake - Functional Test (Brake-by-wire)
341052
Total Air Temperature Probe Aspirator - Operational Test
342037
Compass Swing No. 1
342038
Compass Swing No. 2
346031
FMS Navigation Computer No. 1 - Battery Pack Replacement
X
346015
FMS Navigation Computer No. 1 - Removal! Installation
349800
Flight Management System No. t - Operational Check
346032
FMS Navigation Computer No. 2 - Battery Pack Replacement
X
346016
FMS Navigation Computer No. 2 - Removal! Installation
346033
FMS Navigation Computer No. 3 - Battery Pack Replacement
X
346017
FMS Navigation Computer No. 3 - Removal! Installation
352005
Passenger Oxygen System - Operational Test
362005
Bleed Air Manifold Pressure Indication - Functional Test
510070
24 Month Honeycomb (Aluminum Panels Only) - Inspection / Bond Test
521007
Main Entrance Door Internal - Detailed Inspection
521002
Main Entrance Door Cable Tension - Check
521024
Main Entrance Door Hinge Pins - Detailed Inspection
521022
Main Entrance Door Hinge Pins - Removal / Installation
521051
Door Seal Pressure Regulator - Functional Test
527005
Main Entrance Door Warning System - Operational Test
527008
Baggage Door Warning System - Operational Test
527012
Tail Compartment Door Warning System Operational Test
-
532005
Cabin Compartment Above floor - Inspection
532017
Cockpit Compartment Above floor - Inspection
532019
Cockpit Compartment Below Floor - Inspection
251109
Pilot Seat - Removal / Installation
251110
CoPilot Seat - Removal! Installation
532021
Cockpit Compartment Below Pedestal - Inspection
532027
Entrance Compartment Behind Panel - Inspection
532029
Entrance Compartment Above Floor - Inspection
532031
Entrance Compartment Below Floor - Inspection
532033
Entrance Compartment Shelf - Inspection
532041
Baggage Compartment Above Floor - Inspection
523001
Baggage Door - Removal! Installalion
532045
Baggage Compartment Behind Panel - Inspection
532050
Engine / APU Fuel Feed Line - Inspection
532052
Torque Box - Inspection
532055
Fuselage Interior I Wing Attach - Inspection
532067
Tail Compartment Above Floor - Inspection
532069
Tail Compartment Below Floor - Inspection
272001
Rudder Control System - Operational Test
272019
Rudder Cable Assembly FS 470 - FS 760 (Right) - Removal /Installation
272020
Rudder Cable Assembly FS 470 - FS 760 (Left) - Removal / Installation
273001
Elevator Control System - Operational Test
273033
Elevator Cable Assembly FS 470 - FS 740 (Left) - Removal / Installation
273034
Elevator Cable Assembly FS 470 - FS 740 (Right) - Removal /Installation
532070
Shear Clips Aft Fuselage - Inspection
533005
Exterior Fuselage - Inspection
535008
Nose Compartment / Radome Interior - Inspection
535012
Tail Cone interior - Inspection
535004
Tailcone - Removal / Installation
562005
Emergency Window Release Mechanism (Internal and External) - Functional Test
562007
Emergency Exil and Cabin Windows - Leak Check
571064
Wing to Fuselage Attachments (Left) - Ultrasonic and Visual Corrosion Damage Tolerance
571065
Wing to Fuselage Attachments (Right) - Ultrasonic and Visual Corrosion Damage Tolerance
783005
Engine Thrust Reverser (Left) - Inspection
783006
Engine Thrust Reverser (Right) - Inspection
783009
Engine Thrust Reverser (Left) - Operational Test
783010
Engine Thrust Reverser (Right) - Operational Test
Page 3 of 6
EFTA00589879
IDN
R01
Mandatory Code
Related Code Code Description
Included In
Material
Estimate
36 Month CMP Tasks (Exhibit 3)
245051
AC / DC Power Distribution System - Functional Test
270101
Stall Barrier / Angle of Attack System - Operational Test
270221
Stall Barrier Dump Valve - Operational Test
272038
Rudder Pedals - Lubrication
275009
Flap Actuator Yoke (Left Inboard) - Inspection
275003
Flap (Loll) - Removal! Installation
275010
Flap Actuator Yoke (Right Inboard) - Inspection
275004
Flap (Right) - Removal! Installation
275011
Flap Actuator Yoke (Left Outboard) - inspection
275012
Flap Actuator Yoke (Right Outboard) - Inspection
275027
Flap Actuator Bushing (Left) - Service! Lubrication
275005
Inboard Flap Actuator (Lelt) - Removal / Installation
275007
Outboard Flap Actuator (Lelt) - Removal / Installation
275028
Flap Actuator Bushing (Right)- Service / Lubrication
275006
Inboard Flap Actuator (Right) - Removal / Installation
275008
Outboard Flap Actuator (Right) - Removal / Installation
280005
Fuel Control System - Functional Test
532007
Forward Cabin Compartment Below Floor - Inspection
532009
Midcabin Compartment Below Floor - Inspection
551019
Elevator Skins (Left) - General Visual inspection
551020
Elevator Skins (Right) - General Visual Inspection
551023
Horizontal Stabilizer / Elevator (Interior! Exterior) (Left) - Inspection
551024
Horizontal Stabilizer / Elevator (Interior! Exterior) (Right) - Inspection
553005
Vertical Stabilizer! Rudder (External) - Inspection
553007
Vertical Stabilizer! Rudder (Internal) - Inspection
571011
Wing Front Beam HI-Lite Collars (Left)- Inspection
261169
Wing Anti-ice Overlemp Switch (Left) - Trip Point Check
574005
Wing Leading Edge (Leif inboard) - Removal / Installation
574011
Wing Leading Edge (Leif Center) - Removal / Installation
574017
Wing Leading Edge (Leif Outboard) - Removal / installation
571012
Wing Front Beam MI-Lite Collars (Right) - Inspection
261170
Wing Anti-ice Overleap Switch (Right) - Trip Point Check
574006
Wing Leading Edge (Right Inboard) - Removal / Installation
574012
Wing Leading Edge (Right Center) - Removal / Installation
574018
Wing Leading Edge (Right Outboard) - Removal / Installation
571025
Wing Tank Interior (Left) - Inspection
280010
Delueling Procedures
280018
Fuel Tank (Left) - Leak Check
282025
Fuel Pickup Screen (Main Leif Wing) - Inspection
282026
Fuel Pickup Screen (Alternate Left Wing) - Inspection
571003
Wing Fasteners - Cadmium Plating Degradation - Check (Left)
571026
Wing Tank Interior (Right) - Inspection
280019
Fuel Tank (Right) - Leak Check
282027
Fuel Pickup Screen (Main Right Wing) - Inspection
282028
Fuel Pickup Screen (Alternate Right Wing) - inspection
571004
Wing Fasteners . Cadmium Plating Degradation - Check (Right)
150 Hour CMP Tasks (Exhibit 4)
200001'
Operation One
276065
Takeoff Alarm System - Functional Test
999005
AD 90.02-05 Takeoll Alarm ISM 1000 - 1092)
554007
Rudder External - Inspection
710021
Engine External (Left) - Inspection
710022
Engine External (Right) - Inspection
730001
Fuel Contamination Check, Engine - Inspection
730001 (730002)
Fuel Contamination Check, Engine - Inspection
742001
Engine Ignition System - Operational Check
742001 (742002)
Engine Ignition System - Operational Check
792007
Filter, Engine Pressure Oil - Cleaning / Inspection
791033
LH Engine Oil Level - Check / Service (Using Onboard Replenishment System)
792007 (792009)
Filter, Engine Pressure Oil - Cleaning / Inspection
791033 (791034) RH Engine Oil Level - Check / Service (Using Onboard Replenishment System)
Page 4 of 6
EFTA00589880
IDS
R0t
Mandatory Code
Related Code Code Description
Included in
Material
Estimate
150 Cycle CMP Tasks (Exhibit 5)
200002'
Operations Two ( 150 Cycle )
270206
Stall Barrier Actuator - Service! Lubrication
271035
Spoiler Load Relief Bungee, Left - Lubrication
271036
Spoiler Load Relief Bungee, Right - Lubrication
271037
Bungee, Left Aileron Load Relief - Lubrication
271038
Bungee, Right Aileron Load Relief - Lubrication
272027
Rudder Bungee - Lubrication
272036
Rudder Torque Tube Bearing - Lubrication
273002
Elevator Load Relief Bungee - Lubrication
275019
Wing Flap (Left) - Lubrication
275020
Wing Flap (Right) - Lubrication
275023
Wing Flap Traveling Nut (Left) - Lubrication
275024
Wing Flap Traveling Nut (Right) - Lubrication
Misc CMP Tasks (Exhibit 6)
213051
Pressure Relay Switch - Screen Inspection
215006
Air Conditioning System (Temperature Control Valves) - Functional Check
215005
Air Conditioning System - Operational Test
217027
Ozone Converter (Left) - Functional Test
X
217025
Ozone Convener (Left) - Removal r Installation
217028
Ozone Converter (Right) - Functional Test
X
217026
Ozone Converter (Right) - Removal! Installation
217075
Water Separator Bag (Left) - Inspection
X
217070
Water Separator (Leh) - Removal / Installation
217076
Water Separator Bag (Right) - inspection
X
217071
Water Separator (Right) - Removal / Installation
240108
Standby Power System - Operational Test
243105
Battery, S1—Capacity Check
243106
Battery. #2—Capacity Check
262631
Portable Haien Fire Extinguisher (Right Cockpit) - Inspection
262632
Portable Haien Fire Extinguisher (Forward Cabin) - inspection
262691
EXT,AFT GALLEY HALON TRASH-WT
273019
Elevator Trim Tab Actuator (Left) - Lubrication
273020
Elevator Trim Tab Actuator (Right) - Lubrication
304003
Windshield Wiper Lock Pin - Lubrication / Adjustment
314007
FWC No. 1 Trend and Limit Monitoring - Data Download
314008
FWC No. 2 Trend and Limit Monitoring - Data Download
320004
Main Landing Gear (Left) - Lubrication
320005
Main Landing Gear (Right) - Lubrication
320006
Nose Gear - Lubrication
344051
IRU No. 1 Blower Filter - Inspection
344005
Inertial Reference Unit No. 1 - Removal / Installation
344086
AHRS / IRU - Operational Check
344052
IRU No. 2 Blower Filter - Inspection
344006
Inertial Reference Unil No. 2 - Removal / Installation
344055
IRU No. 3 Blower Filter - Inspection
344010
Inertial Relevance Unil No. 3 - Removal / Installation
344088
IRU No. 1 Securaplane Battery! Heater Assembly - Replacement
X
344068
IRU No. 1 Securaplane Battery - Removal / Installation
344061
IRU No. 1 URDC Battery - Removal / Installation
344089
IRU No. 2 Securaplane Battery! Heater Assembly - Replacement
X
344069
IRU No. 2 Securaplane Battery - Removal / Installation
344062
IRU No. 2 URDC Battery - Removal / Installation
350122
Oxygen Bottle (No. 2) - Hydrostatic Test
X
350102
Oxygen Cylinder (No. 2) - Removal / Installation
351001
Crew Oxygen Low-Pressure Switch - Operational Test
350123
Oxygen Bottle (No. 3) - Hydrostatic Test
X
350103
Oxygen Cylinder (No. 3) - Removal / Installation
350124
Oxygen Bottle (No. 4) - Hydrostatic Test
X
350104
Oxygen Cylinder (No. 4) - Removal / Installation
381010
Filter Element, No. 1 Potable Water System - Removal / Installation
381025
Potable Water System - Flush! Sanitize
539472
Aft Pressure Bulkhead - Inspection
541017
Pylon External/Internal (Left) - Inspection
541018
Pylon External/ Internal (Right) - Inspection
Page 5 of 6
EFTA00589881
IDA
RO1
Mandatory Code
Related Code Code Description
Included In
Material
Estimate
541019
Pylon Internal (Left) - Inspection
541020
Pylon Internal (Right) - Inspection
571033
Rib. Wing Sponson (Left) - Inspection
571034
Rib, Wing Sponson (Right) - Inspection
576005
Aileron Interior (Left) - Inspection
576006
Aileron Interior (Right) - Inspection
723001
LH Intermediate Compressor Case. Engine - Inspection
723001 (723002)
RH Intermediate Compressor Case, Engine - Inspection
761001
LH Controls. Engine - Operational Test
761001 (761002)
RH Controls, Engine - Operational Test
761005
LH Controls. Engine - Service! Lubrication
761005 (761006)
RH Controls, Engine - Service / Lubrication
783007
Engine Thrust Reverser Hot Short To Ground (Left) - Inspection
346025
FMS COU No. 1 - Removal/ Installation
783008
Engine Thrust Reverser Hot Short To Ground (Right) - Inspection
801011
Engine Starter Oil Level (Left) - Check
801012
Engine Starter Oil Level (Right) - Check
994019
AD 2015-16-04 Kidde Graviner
Page 6 ol 6
EFTA00589882
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Phone Numbers
Document Details