Back to Results

EFTA00590207.pdf

Source: DOJ_DS9  •  Size: 1507.9 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

PALMER MARBLE ti TILE, NC. Custom Quality Marble & Granite Bars - Ba h - Ki chens of any Decor Glass Tile Mosaics - Fabrication - Installation - Waterjet Cutting - Restoration 8 Maintenance Proposal LT.G 2365 Greenview Cove Drive Wellington, FL. 33414 Re: t18 Park Monceau Cast Stone Pool Deck Scope of work is to demo and dispose of existing cat stone deck, clean and flash substrate, apply Flexcrete, supply and install new cast stone pavers, grout, clean and treat. Upon demolition the substrate will be inspected. Any additional repairs deemed necessary will be assessed at that time. Dumpste: to be supplied by others. Cost breakdown is as follows: Demo and disposal of existing $18,400.00 Flash and Flexcrete substrate $6,350.00 Install cast stone pavers 528,300.00 Supply cast stone allowance• $14,900.00 Total Contract Amount Deposit Due Upon Acceptance Balance to be billed every two weeks according to job progress. •Allowance only. Final cost to be determined upon material selection. $67,950.00 $33,975.00 IF CHECKED (AGREEMENT TO BE USED AS FINAL INVOICE) THIS CONTRACT AGREEMENT MUST BE ACCEPTED BY . If date is not inserted, contract price will expire in thirty (30) days from the date executed by Palmer Marble and Tile, Inc. Acceptance of this contract constitutes agreement to the additional terms and conditions stated on page 2 of this Contract Agreement. Date: Date: 1/12/2026 I.T.G. Pare Monccau.ods Authorized signature of agent. client or owners Representative for Palmer Marble and 6599 W lli • st Palm h FL 13 Office • Fax proposal EFTA00590207 PALMER MARBLE & TILE, INC. Custom Quality Marb e & Granite Bars - Ba h - Kf chens of any Decor Glass Tile Mosaics - Fabrication - Installation - Watorjet Cutting - Restoration & Maintenance Deposit must be receiv' prior to the purchase of materials and job start up. Delays in deposit and progress payments will result in •ork delays and or stoppages. Change orders and any dditional work must be approved in writing by the customer. Additional work may only be requested through our office or job superv.sor. We will cot be held responsible for delays in our work caused by other trades. Other trades must clean up anything that will interfere with our work progress as required. Failure to clear our work area will result in job delays or an additional charge for us to clear the area. We will require parking for two vehicles and an area to unload materials for the duration of our work. Willie every care is taken to protect finished surfaces from damage during our work it is possible that due to the nature of the chemicals, abrasives and machinery used to achieve the desired results that some damage may occur. Palmer Marble and Tile will not be held responsible for any damage that arises during the normal course of our work. Palmer Marble and Tile will not be held responsible for any damage that arises due to the negligence or poor workmanship of other trades, including painters and previous stone workers. Representations: The agent, client. owner or owners stipulates and represents to Palmer Marble and tile. Inc. that he or she has the authority to bind the owner / owners or additional who may have or claim any interest in the property to be impoved and is the authorized agent of the owner or such owner or owners and has their authority and assent to enter into this contract to bind the owner or ether owners and the real property described herein. Payment terms: All invoices/draws are due upon receipt per the date of the invoice. No credits or adjustments to the Agreement sum shall be made unless mutually agreed upon by Palmer Marble, and 'rile, Inc. (hereinafter known as PMT) and the owner or it's agent. If payment is not made when due, PMT may suspend work until such payment(s) are made. Failure to make payment of any invoice/draw shall be deemed a material breach of this contract. PMT will De entitled to recover its costs of collection of any sums not paid when due, including reasonable attorney's fees. whether or not suit is filed and/or collection agency and any and all other costs arising or related to the failure of any sums not paid when due. This agreement shall be governed by the laws of the State of Florida and the mole venue for litigation shall be in the state court having the appropriate junsdiction in and for the county of Palm Reach, Florida. Interest on all overdue payments will be t.5% per month and/or it196 per annum or the highest legal rate allowed. Date: Authorized signature of agent, client or owners Date: t/1=/loth Representative for Palmer Marble and Tile. Inc I.T.G. Parc Monceau.ods 6599 Wallis Road • West Palm Beach FL 33413 Office • Fax proposal EFTA00590208 PALMER MARBLE & TILE, INC. Custom Quality Marble & Granite Bars - Ba h • IQ chens of any Decor Glass Tile Mosaics - Fabrication - Installation - Water/et Cutting - Restoration & Maintenance Proposal I.T.G 2365 Greenview Cove Drive Wellington, FL. 33414 Re: 118 Park Monceau Pool Vanishing Edge Wall Scope of work is to demo and dispose of existing slate. Supply install new slate look porcelain, grout, clean and treat. Upon demolition the substrate will be inspected. Any additional repairs deemed necessary will be assessed at that time. Cost breakdown is as follows: Demo and disposal of existing $2,090.00 Install porcelain $3,500.00 Supply porcelain allowance* $1,440.00 Total Contract Amount Deposit Due Upon Acceptance Balance to be billed every, two weeks according to job progress. *Allowance only. Final cost to be determined upon material selection. 87,030.00 S3,515.00 IF CHECKED (AGREEMENT TO BE USED AS FINAL INVOICE) THIS CONTRACT AGREEMENT MUST BE ACCEPTED BY . If date is not inserted, contract price will expire in thirty (30) days from the date executed by Palmer Marble and The, Inc. Acceptance of this contract constitutes agreement to the additional terms and conditions stated on page 2 of this Contract Agreement. Date: Date: 1/12/2016 Authorized signature of agent, client or owners /1“4 Representative for Palmer Marble and e, Inc. r I.T.G. Pare Monceau.ods 6599 W st Pal 13 Office proposal) EFTA00590209 PALMER MARBLE & TILE, INC. Custom Quality Marble & Granite Bars - Ba h - Ki chens of any Decor Glass Tile Mosaics - Fabrication - Installation - Water/et Cutting - Restoration & Maintenance Deposit must be receive prior to the purchase of materials and job start up. Delays in deposit and progress payments will result in rk delays and or stoppages. Change orders and any dditional work must be approved in writing by the customer. Additional work may only be requested through our office or job supervisor. We will not be held responsible for delays in our work caused by other trades. Other trades must clean up anything that will interfere with our work progress as required. Failure to clear our work area will result in job delays or an additional charge for us to clear the area. We will require parking for two vehicles and an area to unload materials for the duration of our work. While every care is taken to protect finished surfaces from damage during our work it is possible that due to the nature of the chemicals, abrasives and machinery used to achieve the desired results that some damage may occur. Palmer Marble and Tile will not be held responsible for any damage that 'arises during the normal course of our work Palmer Marble and The will not be held responsible for any damage that arises due to the negligence or poor workmanship of other trades, including painters and previous stone workers. Representations: The agent, client, owner or owners stipulates and represents to Palmer Marble and tile, Inc. that he or she has the authority to bind the owner / owners or additional who may have or claim any interest in the property to be improved and is the authorized agent of the owner or such owner or owners and has their authority and assent to enter into this contract to bind the owner or other owners and the real property described herein. Payment terms: MI invoices/draws are due upon receipt per the date of the Invoice. No credits or adjustments to the Agreement sum shall be made unless mutually agreed upon by Palmer Marble tnd Tile, Inc. (hereinafter known as PMT) and the owner or it's agent. If payment s not made when due. PMT may suspend work untl such payment(s) are made. Failure to make payment of any inwaice/draw shall be deemed a material breach of this contract. PMT will be entitled to recover its costs of collection of any stints not paid when due, including reasonable attorney's fees, whether or not suit is filet and/or collection agency and any and all other eon arising or related to the failure of any sums not paid when due. This agreement *hall bo governed by the laws of the State of Florida and the sole venue for litigation shall be in the state court having the appropriate jurisdiction in and for the county of Palm Beach, Flcrida. Interest on all overdue payments will be 1.596 per month and/or 1896 per annum or the highest legal rate allowed. Date: Authorized signature of agent. client or owners Date: 1/12/2016 Representative for Palmer Marble an le, Inc. I.T.G. Parc Monccau.ods 6599 W st Palm 13 Office proposal_2 EFTA00590210

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA00590207.pdf
File Size 1507.9 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 9,409 characters
Indexed 2026-02-11T22:51:16.801641
Ask the Files