June 15, 2017
Mr. Jeffery Epstein
Owner
Nautilus, Inc
6100 Red Hook Qr., Suite B3
St. Thomas, Virgin Islands 00802
Via E-mail:
RE: Bid evaluations for maintainance, generator. and R.O. Buildings
Dear Mr. Epstein,
The Jaredian Deign Group is in receipt of four proposals for General construction in connection
with the Maintainance, Generator, and the R.O Buildings, as designed by the Jaredian Design
Group in 2015. One of the four proposals was originally submitted to you through Brice Gordon
by SSVI-Expert Builders. The other three proposals were submitted by the following contractor;
APEX Constructions, Balbo Construction and Custom Builders. All three of those Bidders are
experienced General Contractors in the US Virgin Islands with more than 30 years' experience
each.
Apex Construction has worked on such projects as Elysian Beach Resort, Eldra Schultebrandt
Mental Health Facility, The VITEMA Headquarters, and many Luxury Residences, including the
residence of Mr. & Mrs. Mulo Alwani.
Custom Builders have completed many projects including Peace Corps / Bowsky Elementary
School, Fort Christian Restoration, and the Hebrew Congregation Synagogue on ST. Thomas.
The Synagogue received recognition Nationally for Historic Restoration.
Balbo Construction has worked on Bertha C. Boschulte Middle School, Charles Tumbull
Regional Library, Virgin Islands Public Finance Authority Offices, and many other luxury
residences including the residence of the former Governor Roy L. Schneider. All three
contractors have received recognition for excellence in construction. Custom Builders, as
referenced before, received recognition for the Hebrew Congregation's restoration of the
Synagogue, Balbo Construction for the VI Public Finance Authority Office Building and Apex
Construction for the restoration of Lieutenant Governor Office Building on St. Thomas.
1 Bid Evaluations for Generator & R. O. Buildings on Little St. James. U. S. Virgin islands
Joredian Design Group
June 15, 2017
EFTA00591096
The bids received are as follows:
Generator and R.O Buildings
Apex Construction: $ 670,267.00
Balbo Construction: $ 981,212.24
Custom Builders: $1,196,147.00
SSVI Expert Builders: $566,795.00
Maintainance Buildings
Apex Construction: No Bid provided.
Balbo Construction: $ 819,478.76
Custom Builders: $1,478,8016.00
SSVI Expert Builders: No Bid provided.
The cost of the steel structure, exterior steel siding, and doors are not included in any of the
Bidder responses. Buck Steel is the manufacturer that will be providing those materials and will
be delivering them to the site location on Little Saint James. The Buck Steel estimates for each
site location is $126,640 for the Generator and R.O. Buildings, and $106,850.00 for the
maintainance building. The Buck Steel cost for each site will be increased by $5,250.00 for
stamped structure engineering drawings.
The four bids received shows a wide discrepancy in cost. We believe this is a result of how
each particular contractor interprets the risk involved in doing construction on Little St. James.
Construction logistics are always going to be difficult on an offshore Cay. The interview that I
conducted with the contractors reveals that APEX Construction and SSVI have experience
working on Little St. James and Great St. James. Their experience probably contributes to the
large difference between their cost and the proposals of the other two bidders. APEX
Construction also indicated that they were familiar with the drawings presented to them
previously, probably by Brice Gordon.
The three contractors that prices were solicited from by the Jaredian Design Group, have the
necessary qualifications to construct these buildings. However, we are uncertain if SSVI Expert
Builders, has the necessary qualifications at this time. Therefore, we recommend that you
consider the selection of APEX Construction for the Generator and R.O. Buildings. APEX
Construction has informed us that they are presently completing their proposal for the
Maintainance Building as they have not received the email transmitted by me earlier. However, I
don't expect their cost for that building to be much different from their present proposal. The
total cost of construction, including the Buck Steel Proposal for the Generator and R.O.
Buildings will be $802,157.00, if APEX is selected. As the total footprint of construction is
approximately 10,500 square feet, this translates into a construction unit cost of $76.40 per
square foot. We find this to be a very fair and equitable cost considering the challenges faced
by doing construction on Little St. James.
2 Bid Evaluations fa Generator & R. O. Buildings on Little St. James, U. S. Virgin Islands
Joredian Design Group
June 15, 2017
EFTA00591097
Four Cost Proposals, as well as the proposals from Buck Steel, are included with this report.
(enclosed) Please feel free to call us if you have any questions or comments at 340-777-1600.
Sincerely,
JAREDIAN DESIGN GROUP
#612004)
John P.
AIA, N ARB, Principal
Cc-Via E-mail:
Richard Kahn
Daphne Wallace
Leroy V. Smith
3 Bid Evaluations for Generator & R. O. Buildings on Little St. James. U. S. Vigin Islands
Jaredian Design Group
June 15. 2017
EFTA00591098
CONSTRUCTION PROPOSAL No.1.:
APEX CONSTRUCTION COMPANY, INC.
EFTA00591099
Al=e) C
CONSTRUCTION
COMPANY. INC
June 9, 2017
John Woods
Principal
Jaredian Design Group
St. Thomas, VI 00802
RE:
Proposal for Generator & R.O Building Roofing Project
Little St. James
Dear Mr. Woods;
Apex Construction Co., Inc. is pleased for the opportunity to quote you on referenced
project as detailed in drawings by Jaredian Design Group dated 10/20/15. We propose to
perform the work inclusive of materials, labor, equipment and supervision for the sum of
Six Hundred Seventy Thousand Two Hundred and Sixty-seven Dollars
($670,267.00). Specifically excluded from this proposal is all sea transportation.
Should you have any questions concerning this proposal, please do not hesitate to contact
this writer.
Regrds,
11 Hodge
Vice president
Tel:
P.O. Box 305048, Stjnomas. U.S. Virgin islands 00803-5048
Email
EFTA00591100
CONSTRUCTION PROPOSAL No.2.:
BALBO CONSTRUCTION CORPORATION
EFTA00591101
Balbo Construction Corporation
"Where quality, commitment and integrity are our trademarks and building is our passion"
Licensed Building Contractor
General Construction. Hotels to Private Homes
Phone (340) 775-7918
Fax
(340) 714-7948
E-mail
P.O. Box 9435
St. Thomas VI 00801
June 9, 2017
Mr. John P. Woods, Jr. Principal
Jaredian Design Group
P.O. Box 6218
St. Thomas, VI 00804
RE:
Transmittal of BC's Cost Proposal for — the Generator & R.O. Building and
Roofing Project and the Maintenance & Workshop Building Project on Little St. James
Dear Mr. Woods:
Balbo Corporation is pleased to submit its Cost Proposal for the above mentioned
Project.
Our Cost Proposal for all work specified in the above cited RFP is a follows:
One million six Hundred ninety one and one cent
$1,800,691.01
We would like to thank you for affording us the opportunity to submit this proposal.
Should you require further clarity or discussion relative to this proposal please contact
us at the above referenced number.
Sincerely,
Gerard Castor, Sr.
EFTA00591102
Maintenace and Workshop Building
_
_
—
_
Item Description
__
_-
Silt Fence
$
Total Price
1,400.00
Excavation (Rock Clause)
$
17,000.00
Compaction
$
6,9-07.00
Compaction Test
$
2,225.00 I
Sawcut For Pads
$
7,080.00.
Footings, Fads, and Piers
$
168,750.00
Steel Erection
$
49,419.00
Slab (Wire Mesh and #4 Bars)
$
199,800.0e.
6" Stud Walls
$
79,200.00
4" Stud Walls
$
3,456.00 i
Painting
$
30,067.20
Roll Up Doors (Includes frieght and instillation)
$
9,683.96
Waste Gil Pits
$
3,000.00
Retaining Wall Footing Form and Pour
$
30,000.00
ketaining Wall Form and Pour
$
59,500.00
Bituminous Paint
$
1,260.00
Trucks Lock Fee
$
1,500.00
Remove Portion of Existing service Slab Cut
$
1,740.00
Remove Fortiori of Existing Service Slab
$
3,200.00
Plumbing
$
10,000.00
Gverhead
•
Generator and R. 0 Building Roofing Project
Storage Room
Item Description
Total Price
Silt Fence
800.00
Excavation (Hammer Clause)
3,200.00
Compaction
1,662.00
Compaction Test
$
1,575.00
Storage Building Footing
38,250.00
Storage Building Slab
55,800.00
Steel Erection
123,063.00
Bituminous Paint
792.00
Storage Building retaining Wall
66,300.00
Gravel for Stormwater Drainage Pipe
770.00
EFTA00591103
Storage Building Roof Slab
Storage Building Green Roof
Painting
Wall Plaster
Roof Plaster
Parapet Wall
Terminating Bar
Single Ply Membrane
Remove Soil for Green Roof
2nd Floor Slab Footing
2nd Floor Slab
Roll Up Doors (Includes frieght and instillation)
$
37,800.00
835.00
8,820.00
9,000.00
6,460.00
4,500.00
1,100.00
400.00
3,320.00
57,000.00
57,600.00
45,177.68
Electrical
Mechanical
Hollow Metal Doors and Frames
Overhead
Utilities (Both buildings included)
134,914.00
141,419.00
15 600.00
300,115.17
5 1,800,691.01
EFTA00591104
CONSTRUCTION PROPOSAL No.3.:
CUSTOM BUILDERS
EFTA00591105
CUSTOM BUILDERS
GENERAL CONTRACTORS • CONSTRUCTION MANAGERS
Eery"llyg ?rho tigvNeni Stales Virgin Islands
7r,927a Eazf'sorn Caribbean
A REPUTATION FOR EXCELLENCE
www.custombuildersvi.com
EFTA00591106
CUSTOM BUILDERS
June 9, 2017
John Woods, A1A
Jaredian Design Group
5333 Raadets Gade, Suite 14
St. Thomas, VI 00802
Re: Little St. James
Good Day Mr. Woods:
Custom Builders is pleased to present this proposal for the Little St. James Generator and R.O.
Roofing Project and Maintenance and Workshop Building Project. We have over thirty years of
experience as a General Contractor in the Virgin Islands. Similar previous projects include the
Cyril E. King Airport Baggage Claim Terminal Renovation, Cyril E. King Airport Electrical
Room Expansion, and the renovation of Fort Christian.
Our staff has extensive experience in commercial and residential construction through out the US
Virgin Islands, and we are very familiar with the requirements, logistics, and construction
techniques required for the successful completion of this project.
Custom Builders' pricing for these projects is as follows:
Generator and R.O. Roofing Project:
Maintenance and Workshop Building Proiect:
Lump sum total for both projects:
Schedule:
Hangar Building, 6 Months
Maintenance Building, 6 Months
$1,196,147.00
$1,478,816.00
$2,674,963.00
Terms:
10% Mobilization payment upon Notice to Proceed
Billing will be monthly, Schedule of values to be provided at the time of
award
We look forward to participating in this project and are fully prepared to respond to any
questions or requests for additional information. Enclosed with this proposal, please find our
cost breakdown for each project and our assumptions and exclusions.
erely,
Jerome Boschulte
Acting President
Tel:
Email:
civets Algid
s rieTreat • bt. nomas • U.S. Vi
vvou
EFTA00591107
LITTLE ST. JAMES
Project: MAINTENANCE AND WORKSHOP BUILDING PROJECT
DESCRIPTION
BID AMOUNT
GENERAL CONSTRUCTION
General Conditions
$210,400.00
Sitework
$36,401.00
Demolition
$16,414.00
Concrete
$538,126.00
Masonry
$0.00
Metals
$163,872.00
Wood/Plastics
$3,865.0O
TIM Protection
$3,309.00
Windows/Doors
$35,898.0O
Finishes
$111,681.00
Specialties
$0.00
Equipment
S0.0o
Furnishings
$0.00
Special Construction
$0.00
Conveying System
$0.00
Mechanical
$161,489.00
Electrical
$197,361.00
TOTAL BID
$1,478,816.00
PROJECT DURATION (INDICATE NUMBER OF CALENDAR DAYS)
183
ALTERNATES
EFTA00591108
Bid Sheet -1
May 23, 2017
LITTLE ST. JAMES
Project: GENERATOR AND R.O. BUILDING
DESCRIPTION
BID AMOUNT
GENERAL CONSTRUCTION
General Conditions
$203,437.00
Sitework
$88,028.00
Demolition
$0.00
Concrete
$271,906.00
Masonry
$0.00
Metals
$169,359.00
Wood/Plastics
$3,865.00
T/M Protection
584,161.00
Windows/Doors
$22,661.00
Finishes
$107,875.00
Specialties
Sono
Equipment
$0.00
Furnishings
50.00
Special Construction
$0.00
Conveying System
$0.00
Mechanical
$133,666.00
Electrical
$111,189.00
TOTAL BID
$1,196,147.00
PROJECT DURATION (INDICATE NUMBER OF CALENDAR DAYS)
183
ALTERNATES
EFTA00591109
Assumptions/Exclusions
1. No rock excavation is included, this will be an extra.
2. We assume the existing site material will be suitable for any fill that may be required.
3. We assume that the pre-fab building will be delivered to the job site.
4. Power and water needed during the construction process will be provided to us.
5. The LSJ barge and boat will be available for transportation of materials and workers.
6. Building Permit will be provided by the owner.
EFTA00591110
r
ri
•sa___
has :a.. 4e....•.... te....4a,,..
4.•a••
...„....w.r.........a........
...
allor ••-•-r•
lair
•• -• 4 :: • i•••••• •••-• • 47.1. • ••••••••
.• • ••••.••••••.••••
••• • • •••••• • • •••••4•
•
• •••••• •• •
I
mg,
•
0
. I t O. Z"
.
•
.....4
. tI
L • :. Il re.
••
1 • •
• ••• e
l % ;
. % 7 IA
.0 •
• . . . • .
. :Ie.
1
e
al
r
e ttt
h•4:270
.
41 ..7:
1 ifil:Art
i ... .
1 . :
1 04
4: VI
. Ot
.
.. t ed
,
04
:
0..._. a
t • •• • 4:•••••/.••••
• ••••••••:.•• 0•••• • •••••:.
• *SO • ,.. •
•
• •
•
a•
V OYAC
IAWAS I XWAVii
i it),A
MICA%
WO•da
t ):04
le ...#61•0:03Plig
t rgi
tatql
( fi rt ed
ei015P):04
te;‘
.
•.0.•
......
t.,...,_
-Ala
G
.1-$rii
Is%
....;
l:i
-214E;
(
0.6:4
4.-*A
wet=
-it t,'45::
(
Pil'al
WA:
• oot-
*Sti:c.-:
0
0.6ft
....11.e;
:4.--:
.....i....r„.
1.*A•ti
' 41014
i ..
..„-...9.
7.
•Vit
s
-:
16;15-:
e s
I tile;
...47,.z
Aifie
:.
C. • %CI:
Vaf4lit
I 4
1 Ket
t
••••••••::
Clik
:••••tr•
:
•C•rt..
0
't it;
00
.4
11
!
441•::::
• ;• ••••••
-17,44.i:
'lit? at;
•........
:..,,:::
...„,.:.......
; ..*,-...:
0..L,
,.
..„.„
......„:„....„
0
, ...I.A.
....:•••:".
•• iv
s r.
;:ltjlei
Omn
...1..
. ...tz
....71 IN:,
.ti er
•N
eCir .
eat.
*w e
04
Pairai is0
That, in accordance with the applicable provisions of Tide 3 Chapter I6 and Title 27 V.I.C. relating to the licensing of
businesses and occeparions, and compliance having been made with the provisions of 10 V.I.C. Sec. 41 relating to
the Civil Rights Act of the Virgin Islands, the following license is hereby granted.
Licenser
PROFESSIONAL DESIGN BUILDERS INC
Its Name:
CUSTOM BUILDERS
Strang Address
Physical Address
4028 ANNA'S RETREAT
ST THOMAS
ST. THOMAS VI 00802
4028 ANNA'S RETREAT
ST THOMAS
ST. THOMAS VI 00802
Business No:
9204
_ License No;
1.9204-1B
Types of License(s)
General Construction Co.
As provided by law, the authorized licensing authority shall have the power to revoke or suspend any License issued
hereunder, upon finding, after notice and adequate helping, that such revocation or suspension is in the public
interest; provided, that any persons aggrieved by any such deeidon of this office shall be entitled to a review of the
same by the Territorial Court upon appeal made within (30) days from the date of the decision; provided, further, that
all decisions of this office hereunder shall be final except upon specific findings by the Cowl that the same was
arrived at by fraud or illegal means.
If a renewal is desired, the holder is responsible for making application for same without any notice from this office. It
is the responsibility of the Licensee to notify the Department in writing within (30) days, when a license is to be
cancelled or placed in inactive status. Failure to do so will result in the assessment of penalties as authorized by law.
Commissioner, Department of Licensing and Consumer Affairs
THIS LICENSE MUST BE PROMINENTLY DISPLAYED AT PLACE OF BUSINESS
EFTA00591111
GOVERNMENT OF
THE UNITED STATES VIRGIN ISLANDS
Date : JANUARY 10, 2017
Office of the Custodian, government Insurance Tune!
VETARZAIWITOT TI.VINCE
Certificate of government Insurance Coverage
I certify that the employer PROFSSIONAL DESIGN/BUILDERS, INC.
Has fired with the Custodian of the government Insurance Fund; the Employer's Wrport to the
Commissioner of Finance and paid the required premium in accordance with the provision of Title
24 Chapter 11, Section 273, of the 'Virgin Islands Cork, and, accordingly is entitled to the rights
And Benefits of the insurance coverage estafilishedfiy law. 'Tie riskof this employer is covered
By policy 4360 for the periodfrom JANUARY 01, 2017 TO DECEMBER 31, 2017
lellf
ST THOMAS, VI 00802
NAME & ADDRESS OF EMPLOYER
PROFESSIONAL DESIGN
BUILDERS, INC.
DBA CUSTOM BUILDER
Ire
4028 ANNA'S RETREAT
0
Cr
7elo deuliff
Custodian, Government Insurance Fund
EFTA00591112
Accmtt
CERTIFICATE OF LIABILITY INSURANCE
‘wmaa....
0.417 00400ARYY)
1/3.5/2 017
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. MS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, MD THE CERTIFICATE HOLDER.
IMPORTANT: If the certMcate holder is an ADDITIONAL INSURED, the poilcyges) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement A statement on this certificate doss not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER
Marshall & Sterling St. Croix
5 02 1 Anchor Way
Gallows Bay
Christiansted
VI 00820
calaitcr Monica Robinson
11„ i d,. (340) 773-2170
Ilitsl. MR: (340)773-9550
Annitimt
INSURE-ROM AFFORDING COVERAGE
Pace
meow* :Certain Underwriters at Lloyds
INSURED
Professional Design/Builders, Inc. DB& Custom
Builders
4028 Anna's Retreat
St.
Thanes
VI 00802-2065
INSURER. Certain Underwriters at Lloyds
mumac:
INSURER D:
IRSURER E :
INSURER F :
COVERAGES
CERTIFICATE NUMBER:M.1721805706
REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAW, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS.
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAYHAVE BEEN REDUCED BY PAID CLAIMS
NM
LTR
TYPE OF INSURANCE
A
NSA
DTA. VATS
POUCY MESSER
omu
Ctir mEt;
P
iNiisl.oryW n
ICY
LUTE
A
GINERAL
X
MERRY
comment °mon. UMILITY
B1230PCO2491A17
S/1/2017
1/1/2018
EACH °Ca:MS.10E
$
3,000,000
AMAGE S TC REMED
PD ROASE TR *COSMO)
$
3, 000,000
I afacwa
X OCCUR
mE0 Ew c,„ 0mi:sum;
1
10,000
PERSONAL 6 ADY PLURY
S
3,000,000
C.F.I.DUL AGGREGATE
$
3 , 000, 000
OWL AGORCOATE
ill POLICY
LEA TARES PER
ri yta El LOC
PROOLCTS - COUP/OR AC.0 s
3,000,000
$
El
AUTOMOBILE
...
a
LAMM
ANY AUTO
AU. OARED
AUTCS
RAW/AUTOS
Yc
V a
80-EOULW
AJTOS
NON-OVNE0
/VMS
MD0721372
5/7/2016
8/7/2017
co.6:IrMraM LIMIT
$
300,000
BOORT INJURY (Tr RIME)
S
000cy limb. p fl
ow$) $
OPER
fOr radon,'
$
IANNR RMINAJI
$
5,000
_
UMBRELLA UM!
EXCESS LINE
—
OCCUR
CURMSWAIICE
EACH OCCLAIRDUCE
S
AGGREGATE
6
OW I
I RETENTIONS
S
WORKERS COMPENSATION
AND EMPLOYERS LIABILITY
Y I N
NI A
IINITITst I
lOg-
E: EAOI AWIGENT
ANY lit0REET0RIPARThERIDZOITIIE
SEIM:MO-LIM EXCLLOETP
K
Kantwory(n NH)
am OMURA WEN
DESOIPDON OF OPERATORS Nobel
E - DISEASE- EA 94P-OYEE S
E I. IICARR . PO_CY LMT $
OESCIEPTION OF OPERATORSI LOCATIONS I VEHICLES Mach ACORD 101. Adational lbsenwes Schedule, if mere ay I reminell
General Contractor
CERTIFICATE HOLDER
CANCELLATION
Proof of Insurance
SHOULD MY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED WORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WM THE POLICY PROVISIONS.
AUnIORGED REPRESINIATNE
John Harper, CIC/!
/
A
.17
MR.
c_
ACORD 25 (2010105)
INS025 Dopos)ol
01988-2010 ACORD CORPORATION. NI rights reserved.
The ACORD name and logo a e registered marks of ACORD
EFTA00591113
CONSTRUCTION PROPOSAL No.4.:
SSVI EXPERT EXCAVATION & BUILDERS
EFTA00591114
Generator/Mechanical
& R.O. Buildings
onstruction Proposa]
March 10, 2017
Prepared for:
Great St. James & Little St. James
Red Hook Quarters, St. Thomas, VI
Contact: Brice Gordon
Prepared by:
SSVI-Expert Builders
6501 Red Hook Plaza, Ste 201
St. Thomas VI 00802
Contact: Alex 1
EFTA00591115
1. INTRODUCTION
2. ABOUT SSVI
3. SCOPE OF WORK
4. SCHEDULE
5. PRICING & PAYMENT TERMS
6. GENERAL TERMS & CONDITIONS
7. ASSUMPTIONS
SSVI is pleased to submit this construction proposal to LSJ do Brice Gordon to be performed at
the property located at Little St. James,USVI.
By the signature of SSVI's authorized representative set forth below, SSVI agrees to be bound
by the representations made herein.
This construction proposal and the pricing provided herein shall remain valid for a period
of 60 days following the date shown on page 1.
1. INTRODUCTION
Little St. James desires to have the existing Generator/Mechanical & R.O buildings removed
and replaced with new structures and has provided a general specification and has
communicated a set of requirements, which are summarized as follows:
• Site Excavation & Earthwork
• New Storage Building Construction
• R.O Building (A)
• Generator Building (B)
SSVI / Expert is confident that it will present the best value forLittle St James. First, our past
performance record to meet schedules and deliver a high-quality product, at a relatively low
cost as compared with the competition. Second, our extensive expertise in this area allows
us to tackle tough projects on a fixed-price basis, thereby alleviating any concern that the
price may increase. Third, the talent level of our team is unparalleled and our project
management practices ensure labor efficiencies that drive costs down. Finally, our access
to the highest quality materials at highly competitive prices ensures the lowest possible cost
of goods.
EFTA00591116
2. ABOUT SSVI
SSVI is an established and well-respected local contractor that has been serving customers
in The Virgin Islands since 2009. SSVI has completed a broad range of construction projects
over the years, and many of them have been of comparable scope and magnitude as
compared with this construction project.
SSVI is supported by an extraordinary team of professionals who are highly skilled in their
trade. For this project, the team will be lead by Reynolds Clement. Reynolds Clement has a
proven track record of successfully leading projects such as this.
3. SCOPE OF WORK
SSVI will perform all construction activities associated with the new buildings on Little St
James. Such work will be carried out in accordance with requirements communicated to
SSVI by Little St James in this proposal and the architectural plans provided by the
Jaredian Design Group. In addition to the responsibilities of SSVI outlined in such document,
SSVI will be responsible for the following:
• Site Excavation & Earthwork
• New Storage Building Construction
• Construction of the R.O Building and the Generator
Building
• Site Cleanup
EFTA00591117
4. SCHEDULE
The entire project described in this proposal will be completed in approximately 6
months, weather permitting, following execution of a contract between the parties.
5. PRICING & PAYMENT TERMS
The project will be undertaken at a price of $492,865.00 for labor and materials with
the exception of the sheds and roll-up doors, which will be purchased by Little St James
directly from Buck Steel who will also pay for all shiooina costs from factory to job site.
Scope Of Work / Labor
GENERAL REQUIREMENTS
$ 64,285
a. General Conditions
b. Shipping, Port Fees & Handling of Buck Steel order paid by LSJ
Price
$ 64,285
SITE EXCAVATION & EARTHWORK apx 4 weeks
$ 63,000
a. Earth change protection barricades/silt fencing
$ 2,500
b. Site hand clearing and excavation
$ 1,500
c. Site and foundation footing pads excavation
$ 1,500
d. Backfilling and compaction
$ 3,500
e. Subterranean termite treatment
$ 1,200
f. Site retaining walls (two areas)
$ 40,000
g. Extended exterior walkway along R.O building A
$ 8,500
h. Seeding / restoration of disturbed areas
$ 1,800
i. Trucking & disposal of spoils
$ 2,500
NEW STORAGE BUILDING CONSTRUCTION apx. 9 weeks
$ 183,430
a. First floor fittings & foundation walls
$ 23,400
b. Enkadrain drainage matt & bituminous coating
$ 4,500
c. New gravel encased 4" - PVC drain pipes
$ 2,000
d. First floor concrete bottom slab and entry landing
$ 18,750
e. First floor exterior & interior concrete walls
$ 32,000
f. First floor concrete column pads and columns
$ 7,500
g. First floor concrete beams
$ 15,500
h. Concrete roof slab
$ 31,000
i. Concrete parapet wall w/ cap flashing
$ 5,250
j. Single-ply membrane at parapet and roof
$ 2,500
EFTA00591118
NEW STORAGE BUILDING CONSTRUCTION, cont.
k. 6" compacted earth fill topping on roof
I. Doors package complete
m. Electrical complete (fixtures, wiring, installation)
n. Mecahnical exhaust fans and louvers complete
o. Painting of first floor walls
R.O.
a.
b.
c.
d.
e.
f.
9.
h.
i.
J.
k.
BUILDING A apx. 9 weeks
$ 137,950
First floor excavation for pier footings
First floor spread footings and foundations
First floor concrete columns and piers
Second floor perimeter grade beams under new slab
Second floor building extended elevated concrete slab
Second floor pre-engineered building package complete
Second floor pre-engineered building erection complete
Second floor roll-up doors package complete
Second floor electrical complete (Fixtures, panels and installation)
Second floor mechanical (exhaust fans and louvers)
Second floor miscellaneous wall painting
$ 7,500
$ 3,500
$ 20,000
$ 8,530
$ 1,500
$ 3,500
$ 9,000
$ 6,500
$ 8,750
$ 28,000
Purchsed by LSJ
$ 30,000
$ 15,000
$ 9,000
$ 26,200
$ 2,000
GENERATOR BUILDING B apx. 5 weeks
$ 44,200
a. Second floor pre-engineered building package complete Purchased by LSJ
b. Second floor pre-engineered building erection complete
$ 12,000
c. Second floor roll-up doors package complete
$ 12,500
d. Second floor electrical complete (Fixtures, panels and instalattion)
$ 5,000
e. Seconf floor mechanical (exhaust fans and louvers)
$ 13,800
f. Second floor miscellaneous wall painting
$
900
TOTAL OF ALL CATEGORIES OF WORK ABOVE
CONTINGENCY (15%)
GRAND TOTAL
Payment 1 at contract signing
• 50% of stage 1Site Work
Payment 2 at completion of Site Work
•
40 % of stage 1 Site Work
• 50% of stage 2 New Building
Payment 3 at completion of New Building
• 40 % of stage 2 New Building
•
50% of stage 3 R.O. Building
Payment 4 at completion of R.O. Building
• 40 % of stage 3 R.O. Building
•
50% of stage 4 Generator Building
Payment 5 at completion of Generator Building
•
40 % of stage 4 Generator Building
Payment 6 2 weeks after completion of entire job
• Balance of contract
$ 492,865
$ 73,930
$ 566,795
$ 31,500
$ 25,200
$ 91,715
$ 73,372
$ 68,975
$ 55,180
$ 22,100
$ 17,680
$107,143
Contingency if/as required and agreed upon by
both parties.
EFTA00591119
6. GENERAL TERMS & CONDITIONS
1. The above estimate is based upon standard local construction industry standards;
2. Quantities for this estimate are based upon the Owner's approved Final Design Plans;
3. Electrical and Plumbing cost estimates are based upon the standard unit cost of $125.00 per
point. A point is defined as each source location where either and electrical or plumbing
fixture/device provides its intended service;
4. Quantities of concrete are based upon measured amounts from the Plans;
5. The estimate includes a line item for General Requirements and Conditions which can
encompass a variety of expenses which may arise during the period of construction;
6. All work will be done between the hours of 7:00 A.M. and 5:00 P.M.
7. ASSUMPTIONS
This construction proposal and the pricing and schedule data provided herein assumes the
following:
1. All obligations of Little St James described herein will be carried out in a timely manner,
including the obligation to make timely payment in accordance with the payment terms and
schedule provided herein.
2. Mutually acceptable terms and conditions will be negotiated between Little St James
and will supplement the terms and conditions contained herein
3. Little St James will provide prompt feedback/answers on any questions SSVI may
have and be reasonably available to SSVI in furtherance of the project
4. SSVI will be provided access to Little St James premises as reasonably required to perform
the work during the working hours set forth above
EFTA00591120
BUCK STEEL PROPOSAL.
EFTA00591121
CUSTOMER QUOTE
Corporate Headquarters
6855 Lyons Technology Circle • Suite 18
•
Name
Kenneth Benjamin Jr.
Tel
3407771600
Quote Date
05/18/2015
Company Jaredian Design Group
Fax
Valid Through
06/02/2015
Street
TBD
Email
Project ID
8315229
City
TBD
Sales Rep
Brian Buds
State
ZZ
Zip TBD
Country
US Virgin Islands
Page
1 of 3
Project Building 1
Location
Street
TAD
Engineering
Width
Length
Height
41'-4•
Code
IBC 2009
61*-4'
Wind Load 145 MPH
18'4120'4 Exposure
C
Roof Pitch .5:12
Live Load 20
Snow Ct
Reducible Yes
Snow Co
Left Endwall
Right Endwall
Front Sidewall
Back Slciewall
Roof Panel
Wall Panel
Engineering
Notes
City
TBC
Stale
ZZ
Snow Gnd 0
Snow Roof 0
Snow Is
1 0
Zip
TBD
Seismic Ss
Seismic SI
Seismic Co
1.0
I.0
Collateral
0.5
Spacing 2 0 20'
Type Post and Beam
Spacing 2 0 20'
Type Post and Beam
Spacing 3 0 20'
Type N/A
Spacing 3 @ 20'
Typo N/A
Gauge
24
Style PBR
Screw Type-Length
Gauge
24
Style PBR
Screw Type-Length
County
TBD
Country
US Virgin Islands
Shell
Enclosed
Column Straight
BaSe
Deluxe Formed Trim
Frame
Single Slope
Bracing Cable
Bracing Cable
Bracing Portal
Bracing Cable
Long Life-1 1/4"
Color Not Specified
Long Life-1 1/1"
Color Not Specified
Occupancy Normal
Thermal
Unheated
Snow Exp
Sheltered
Girt Bypass
Girt Bypass
Gin Bypass
Girt Bypass
EXPORT BUILDING with final destination of Virgin Islands via PORT Everglades with unloading and freight fonvarding by others Export
package includes extra sheeting. nuts. bolls. fasteners. girls and puffins wilh all rollup doors specifically crated for export to provide additional
protection. It is the customer's responsibility to VERIFY All CODES 8 LOADS used to design this bidding as being in accordance with local
requirements Total weight is estimated as XX XXX lbs COD amount is to be paid in full 2 weeks prior to delivery to port
Building Pricing
Qty
Description
1
Base Building as per Engineering Specifications
Included
1
Stamped Engineered Building DravAngs (3 Seta)
Included
1
Erecting Drawings (2 Sets)
Included
1
Letter of Certification
Included
1
Anchor Bolt Plans
Included
All Frames Hot Dipped Galvanized. Secondary Members Pre-Galvanized
Included
1
FSW 10 53/64" Below BSW Grade
Included
1
FSW BSW, REW Open to 51-6-
Included
1
Full Trim Package Including. Corner Tnm, Eave Trim, Sculptured Rake Trim
Included
1
Die-formed Ridge Cap
Included
1
Closure Strip Package
Included
1
Gutters & Downspouts
Included
2
Framed Opening Standard 17 x 16 For Roll up Doors
Included
1
Personnel Door 3070-M White Insulated Pre-Assembled Windlock Certified wl Lever Handle wr Threshold
Included
2
Roll Up Steel Windlock Certified Non-Insulated w/ Chainhoist 17 x 16'
Included
1
Roof Insulation 67 R19 WMP-VR el/Starter Roil wr Patch Tape
Included
1
Wall Insulation 47 R13 WMP-VR w/ Starter Roll wr Patch Tape
Included
1
Building & Accessory Freight To Port Everglades
Included
1
Export Package Including Extra Compnents and Special Crating
Included
Website
Tel:
vnevtucksteel.ccrn
EFTA00591122
BUCK STEEL
Corporate Headquarters
8855 Lyons Technology Circle • Suite 18
Coconut Creek • FL • 33073
Toll Free Tel
CUSTOMER QUOTE
Name
Kenneth Benjamin Jr
Tel
3407771600
Quote Date
05/18/2015
Company Jaredian Design Group
Fax
Valid Through
06/02/2015
Street
TBD
Email
Project ID
BS15229
City
TBD
Sales Rep
Brian Buck
State
ZZ
Zip TBD
Country
US Virgin Islands
Page
2 of 3
Project Building 2
Location
Street
TBD
City
TBD
State ZZ
Zip
TBD
County
TBD
Country
US Virgin Islands
Engineering
Width
62'
Code
IBC 2009
Snow Gnd 0
Seismic Ss
Shell
Enclosed
Occupancy Normal
Length
122'
Wind Load 145 MPH
Snow Roof 0
Seismic S1
Column Tapered
Thermal
Unheated
Height
12'
Exposure
C
Snow Is
1.0
Seismic Co
Base
Deluxe Formed Trim
Snow Exp
Sheltered
Roof Pitch 1.5:12
Live Load 20
Snow Ct
1.0
Frame
Gable Symmetrical
Reducible Yes
Snow Cs
1.0
Collateral
0.5
Left Endwall
Spacing 25723'8,21W
Type Post and Beam
Bracing Cable
Girt Bypass
Right Endwall Spacing 21'8123T/25'
Type Post and Beam
Bracing Cable
Girt Bypass
Front Sidewall Spacing 2114620721'
Type NIA
Bracing Cable
Girt Bypass
Back Sidewall Spacing 2174420721'
Type N/A
Bracing Cable
Girt Bypass
Roof Panel
Gaugo
24
Style RROL
Screw Type-Length
Long Life-1 1/4'
Color Not Specified
Wall Panel
Gauge
24
Style PBR
Screw Type-Length
Long Life-1 1/4"
Color Not Specified
Engineering
Notes
Building Pricing
Qty
Description
1
Base Building as per Engineering Specifications
Included
1
Stamped Engineered Building Drawings (3 Sets)
Included
1
Erecting Drawings (2 Sets)
Included
1
Letter of Certification
Included
1
Anchor Bolt Plans
Included
1
All Frames Hot-Dipped Galvanized. Secondary Members Pre-Galvanized
Included
1
FSW 1*- 53/64• Below BSW Grade
Included
1
LEW, BSW Open to 5'4r For Block, REW Open to 21-4" For Block
Included
5
Misc Steel Columns To Support Roof From Below Floor(Max 3010. per ft., Bracing At Floor W/Hdware
Included
1
Mod-2 Design 40', 20' Framelines #256
Included
1
Full Trim Package Including: Corner Trim. Eave Trim, Sculptured Rake Trim
Included
1
Die-formed Ridge Cap
Included
1
Closure Strip Package
Included
1
Gutters & Downspouts
Included
2
Framed Opening Standard 18' x 10' Rolling Steel Doors
Included
1
Personnel Door 307041 White Insulated Pre-Assembled Windlock Certified w/ Lever Handle w/ Threshold
Included
2
Roll Up Wndlock Certified Non-Insulated
Chainholst 18' x 10'
Included
1
Roof Insulation 67 R19 WMP-VR wl Starter Roll wr Patch Tape
Included
1
Wall Insulation 47 R13 WMP-VR w/ Starter Roll w/ Patch Tape
Included
1
Building & Accessory Freight To Port Everglades
Included
1
Export Package Including Extra Compnents and Special Crating
Included
Total Building
Florida
Tel
O.anrnla
Tel:
Website
iwnv.bucksteel.com
EFTA00591123
BUCK STEEL
Corporate Headquarters
6855 Lyons Technology Circle • Suite 18
Toll Free Tel:
CUSTOMER QUOTE
Name
Kenneth Benjamin Jr.
Company Jaredian Design Group
Street
TBD
City
TBD
State
ZZ
Zip TBD
Country
US Virgin Islands
Project Building Pricing
Qty
1
Description
Base Building as per Engineering Specirications
Project Option Pricing
Qty
Description
Unit
Extended
1
Stamped Engineered Foundation Dram/I:Fps (3 Sets)
5,250 00
5.250.00
1
Project Erecting Including Equipment Rental, Unloading, and Labor(ESTIMATE)
36,000.00
36,000.00
Tel
3407771600
Quote Date
05/18/2015
Fax
Valid Through
06/02/2015
Email
(Options are NOT INCLUDED In the building price above)
Project ID
0515229
Sales Rep
Brian Buck
Page
3 of 3
1
126 640.001
IMPORTANT NOTES • PLEASE READ
• This quote is based on Buck Steel's interpretation of plans and/or conversations with the customer, Buck Steel is NOT responsible for
any errors and/or ommissions.
• Carefully check this quote for completeness and verify the accuracy of the information contained within.
• This quote is valid through 6/2/2015, and is subject to review of pricing. Revisions to quote may result in a price adjustments.
• Erecting is NOT included in this quote, unless specifically listed.
• Anchor bolts are NOT included in this quote and are NOT provided by Buck Steel
• Concrete is NOT included in this quote and is NOT provided by Buck Steel
• Buck Steel and/or the Building Engineer is NOT the "Engineer of Record'. The customer/owner is responsible for any "special building
inspector" or "structural engineer' required by the city or county for pre and post construction inspections.
• All prices are in USD.
• Pricing contained in this quote does not include any applicable sales taxes.
Fl 'A
Gnnrnla
Tel
Tan,.--....
Webtille
min/ bucksteel.com
EFTA00591124
SUCK STEEL
Corporate Headquarters
6855 Lyons Technology Circle • Suite 18
Coconut Creek • FL • 33073
Toll Free Tel:
Tennessee Office
1107 Battiewood Street
Franklin • TN • 37069
CUSTOMER QUOTE
Name
Eine Gordon
Company LSJ Employees. LLC
Street
6100 Red Hook Quarter. # 83
City
St Thomas
State
zz
Zip 00802
Country
US Virgin islands
Project Building
Location
Street
Engineering
Width
80'
Length
80'
Height
18'
Roof Pitch 1 5 12
Reducible Yes
Snow Ca
Left Endwall
Spacing 28', 24', 28'
Right Endwall Spacing 28'.24', 28'
Front Sideman Spacing 4O20'
Back Sldewall Spacing 4O20'
Tel
3407758100
Fax
Emal
City
TBD
State ZZ
Quote Date
01/31/2017
Valid Through
02/07/2017
Project ID
5523416
Sales Rep
Brian Buck
Page
1 of 4
County
TED
Zip
TBD
Country
USVirgin Islands
Code
IBC 2009
Snow Gnd 0
Seismic Ss
Shell
Enclosed
Occupancy Normal
Wind Load 145 MPH
Snow Roof 0
Seismic Si
Column Tapered
Thermal
Unheated
Exposure C
Snow Is
Base
Deluxe Formed Trim
Snow Exp
Sheltered
Live Load 20
Snow Ct
Collateral
0.5
Frame
Gable Symmetrical
Type Full-Load Expandable Frame
Type Non-Expandable Bearing Frame
Type N/A
Type N/A
Bracing None
Bracing Cable
Bracing Cable
Bracing Cable
Girt Flush
Girt Flush
Girt Bypass
Girt Bypass
Primary Frame Coating Red Oxide Primer
Secondary Frame Coating
Red Oxide Primer
Roof Panel
Gauge
24
Style PBR
Screw Type-Length
Long Life-1 1/4"
Color Not Specified
Wall Panel
Gauge
24
Style PBR
Screw Type-Length
Long Life-1 1/4'
Color Not Specified
Engineering EXPORT BUILDING with final destination of XXXX via PORT XXXX with unloading and freight forwarding by others Export package includes
Notes
extra sheeting, nuts. bolts. fasteners. gins and puffins with all rollup doors specifically crated for export to provide additional protection It is the
customers responsibility to VERIFY All CODES & LOADS used to design this building as being in accordance with local requirements. Total
weight .s estimated as XX &XX lbs COD amount is to De paid in lull 2 weeks prior to delivery to port
Building Pricing
Qty
Description
1
Base Building as per Engineering Specifications
1
Stamped Engineered Building Drawings (3 Sets)
1
Erecting Drawings (2 Sets)
1
Letter of Certification
1
Anchor Bolt Plans
1
LEW Bay 01 Open to Building "B'
Mod-2 design. Columns at 28' From Back Side Wall
1
Fill Trim Package Including: Corner Trim. Eave Trim. Sculptured Rake Trim
1
Die-formed Ridge Cap
1
Closure Strip Package
1
Gutters & Downspouts
7
Framed Opening Standard Misc. Sizes For CUSTOMER Provided Louvers
1
Framed Opening Standard. 12' x 16', LEM Bay 02. 5' From Column
1
Framed Opening Standard, 12' x 16', LEW, Bay #3, 12' From Column
1
Framed Opening Standard, 17 x 16', REW, Bay #1, 5' From Column
1
Framed Opening Standard, 12' x 16', REW, Bay #2. 8' From Column
4
Rollup Door Windlock Certified Non-Insulated w/ Chainhoist 12' x 16'
1
Roof & Wall Insulation TV R10 WMP-VR vd Starter Roll w/ Patch Tape
1
Building & Accessory Freight To Port In Florida
Included
Included
included
included
Included
Included
Included
Included
Included
Included
Included
Included
Included
Included
Included
Included
included
Included
Included
Florida
Tel
Tennessee
Website
www.bucksteel.COM
EFTA00591125
SUCK STEEL
Corporate Headquarters
6855 Lyons Technology Circle • Suite 18
Coconut Creek • FL • 33073
Toll Free Tell
Tennessee Office
1107 Battlewood Street
Franklin • TN • 37069
CUSTOMER QUOTE
Name
Brice Gordon
Company LSJ Employees, LLC
Street
6100 Red Hook Quarter,* 03
City
St Thomas
State
ZZ
Zip 00802
Country
US Virgin Islands
Project Building 2
Location
Street
Engineering
Width
28'
Length
25'
Height
16'
Roof Pitch 1.5:12
Code
SC 2009
Wind Load 145 MPH
Exposure C
Live Load 20
Reducible Yes
Left Endwall
Spacing 28'
Right Endwall Spacing 28'
Front Sidewall Spacing 25'
Back Sidewall Spacing 25'
Tel
3407758100
Fax
Email
City
TBD
State ZZ
Zip
TBD
Quote Date
01/31/2017
Valid Through
02/07/2017
Project ID
8523418
Sales Rep
Brian Buck
Page
2 of 4
Court'
TBD
Country
JS Vigo: islands
Snow Gnd 0
Seismic Ss
Shell
Snow Roof 0
Seismic 31
Column Tapered
Snow is
Base
Snow Ct
Collateral
0 5
Frame
Snow Co
Type Half-Load Non-Expandable Frame
Type Half-Load Non-Expandable Frame
Type N/A
Typo N/A
Bracing None
Bracing None
Bracing None
Bracing None
Primary Frame Coating Red Oxide Primer
Secondary Frame Coating
Red Oxide Primer
Roof Panel
Gauge
24
Style PBR
Screw Typo-Length
Long Life-1 1/4"
Wall Panel
Gauge
24
Style PBR
Screw Type-Length
Long Life-1 1/4"
Engineering REA of Bultding Attaches to LEW of Building "A'
Notes
Building Pricing
Color Not Specified
Color Not Specified
Occupancy Normal
Thermal
Unheated
Snow Exp
Sheltered
Girt Flush
Girt Flush
Girt Bypass
Girt Bypass
Qty
Description
1
Base Building as per Engineering Specifications
Included
1
Stamped Engineered Building Drawings (3 Sels)
Included
1
Erecting Drawings (2 Sets)
Included
1
Letter 01Cedification
included
1
Anchor Bolt Plans
Included
1
BSW Open to 10' for 12- Poured Concrete Wall
Included
1
LEW Open To Existing Bldg Same Width. Height. Roof Pilch
Included
1
Full Trim Package Including: Corner Trim, Eave Trim, Sculptured Rake Trim
Included
1
Die-formed Ridge Cap
included
1
Closure Strip Package
Included
1
Gutters & Downspouts
Included
1
Canopy Roof Extension SSW di' Entire Length. Sheeted 6' To Top Of Existing Wall
included
1
Framed Opening Standard 1Z x 12' For Rollup Door
Included
1
Framed Opening Standard Misc. For CUSTOMER Supplied Louver
Included
1
Rollup Door Windlock Certified Non-insulated w/ Chainhoist 17 x 12'
Included
1
Roof & Wall Insulation 3"/ R10 WMP-VR INF Starter Roll w/ Patch Tape
Included
1
Building & Accessory Freight To Port In Florida
Included
Tonna-sena
Tel:
■
We bs ite
wovrbucksteel.com
EFTA00591126
BUCK STEEL
Corporate Headquarters
6855 t yons Technology Circle • Suite 18
Coconut Creek • FL • 33073
Toll Free Tel:
Tennessee Office
1107 Battlewood Street
Franklin • TN • 27nAct
CUSTOMER QUOTE
Name
Bite Gordon
Company LSJ Employees, LLC
Street
5100 Red Hook Quarter, # 83
City
St Thomas
State
ZZ
ZIP 00802
Country
US Virgin Islands
Project Building 3
Location
Street
Engineering
Width
32S"
Length
4T6"
Height
16'
Roof Pitch 1.5:12
Tel
3407759100
Quote Data
01/31/2017
Fax
Valid Through
02/07/2017
Email
City
TBD
State U
Project ID
13323416
Sales Rep
8dan Buck
Page
3 of 4
County
TB()
Zip
TBD
Country
US Virgin Islands
Code
IBC 2009
Snow Gnd 0
Seismic Ss
Shell
Occupancy Normal
Wind Load 145 MPH
Snow Roof 0
Seismic S1
Column Tapered
Thermal
Unheated
Exposure C
Snow Is
Base
Snow Exp
Sheltered
Live Load 20
Snow Ct
Collateral
0.5
Frame
Reducible Yes
Snow Ce
Left Enchvall
Spacing NA
Right Endwall Spacing NA
Front Sidewall Spacing NA
Back Sidewall Spacing NA
Typo Non-Expandable Bearing Frame
Bracing Cable
Type Non-Expandable Bearing Frame
Bracing Cable
Typo Nth
Bracing Cable
Type N/A
Bracing Cable
Girt Flush
Girt Flush
Girt Bypass
Girt Bypass
Primary Frame Coating Red Oxide Primer
Secondary Frame Coating
Red Oxide Primer
Roof Panel
Gauge
24
Style PBR
Screw Type-Length
Long Life-1 1/4"
Color Not Specified
Wall Panel
Gauge
24
Style PBR
Screw Type
-Length
Long Life-1 1/4"
Color Not Specified
Engineering Materials Only included to resheel customer
building as
s existing
per architeclural drawings Includes all Wall Sheeting Roof Sheeting. Ridge
Notes
Caps. Mastic, Closure Stnps and Fastners Colors to match new building colors(tbd by customer)
Building Pricing
Description
Base Building as per Engineering Specifications
Included
Die-formed Ridge Cap
Included
Closure Strip Package
Included
Building 8 Accessory Freight to Port In Florida
Included
Florida
Tennessee
Tel
Website
venw buckSleel Com
EFTA00591127
MUCK STEEL
Corporate Headquarters
6855 Lyons Technology Circle • Suite 18
Coconut Creek • FL • 33073
Toll Free Tel:
Tennessee Office
1107 Batlev,vcd Street
Franklin, • TN • 37069
CUSTOMER QUOTE
Name
ROM Gordon
Tel
3407758100
Quote Date
01/31/2017
Company LSJ Employees. LLC
Fax
Valid Through
02/07/2017
Street
6100 Red Hook Quarter. # 83
Email
Project ID
BS23416
City
St Tnomas
Sales Rep
Brian Buck
State
ZZ
ZIP 00802
Country
US Virgin Islands
Pago
4 of 4
Project Price
Freight
Project Total
106.850 00
106,850.00
included
IMPORTANT NOTES • PLEASE READ
• This quote is based on Buck Steel's interpretation of plans and/or conversations with the customer, Buck Steel is NOT responsible for
any errors and/or ommissions.
• Carefully check this quote for completeness and verify the accuracy of the information contained within.
• This quote is valid through 2/7/2017, and is subject to review of pricing. Revisions to quote may result in a price adjustments.
• Erecting is NOT included in this quote, unless specifically listed.
• Erecting estimate is based upon, but not limited to, pad being accessible for a clear 25' around entire building, no trees, powerlines or
equipment which may interfere with erecting, and power supplied to slab. Erecting estimate does not take into consideration any OSHA,
Davis Bacon, special insurance requirements, or limit to days and times erecting crews are permitted to work.
• Accessories not provided by Buck Steel (including but not limited to: windows, doors, cupolas, vents, fans, lighting, stucco, masonry etc.)
will not be installed by the erector unless otherwise specified.
• Anchor bolts are NOT included in this quote and are NOT provided by Buck Steel.
• Concrete is NOT included in this quote and is NOT provided by Buck Steel
• Buck Steel and/or the Building Engineer is NOT the "Engineer of Record". The customer/owner is responsible for any 'special building
inspector or "structural engineer required by the city or county for pre and post construction inspections.
• All prices are in USD.
• Sales tax is NOT included in this quote.
Questions about this quote?
Contact Brian Buck at (866) 574-2826 Ext.114
Tel
Florida
Tennessee
Website
www.bucksteel.com
EFTA00591128
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA00591096.pdf |
| File Size | 4268.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 47,759 characters |
| Indexed | 2026-02-11T22:51:21.275487 |