EFTA00591309.pdf
PDF Source (No Download)
Extracted Text (OCR)
LSJ, LLC
6100 Red Hook Quarters Suite 8-3 St. Thomas VI 00802-1348
E-mail
Wire Transfer Request Form
Date of Request 8/3/10
Amount Requested:1$3,600.00
Payee
Scott Graf
Bank Name
As on File
Bank Account:
IAs on File
Requested By:
Purpose / Description:
Payee
Address:
Bank
Address: Mon File
Payment of Statement dated 8/2/10 - Maintenance
Payment of Statement dated 7/30/10 - JEE Projects
Special Notes / Instructions:
G/ L Account Information:
G / L Description: Irrigation
G/ L Number:
60035g
Authorization
EiNri-CL 940
EFTA00591309
SCOTT GRAF
6501 Red Hook Plaza, Suite 201
St Thomas, USVI 00802
August 2,2010
TO:
Little St ames
ATTN:
Emad Hanna
Daphne Wallace
RE:
Irrigation repairs an ma ntenance
TIME:
S 1600.00
A total for work performed and completed with 2 men @ S400 per day for 7/23, 7/26, 7/30 & 8/2
7/23
2 men
Today we opened upper valves in AM. We repaired (1) head by rock wall #6 (service
road). All timers are off due to heavy rains. We covered all pipes at Octagon house.
We repaired LS- pipe damaged by back hoe.
7/26
2 men
We turned water on after weekend shut down (due to rain). We filled in washed out
pipes by service road. We reset controller to run PM program.
7/30
2 men
We rest distribution pump to run 42/56 psi. We capped off pipe under stairway. We
up controller relocated behind gym. We repaired pipe above nursery road.
8/2
2 men
_powered
All zones ran over the weekend. We synchronized upper and beach controllers. We
located pipe line for irrigation damaged by trac hoe. We capped off (2) pipes damaged
by Master bedroom step in the PM.
TOTAL FOR THIS INVOICE - $1600.00
APPROVED FOR
LI TTLE ST JAMES
PAYNEN
fi CC
IOr
asi
hi
Nip t\At:
trifOCOOk LI 4,4 - fir
EFTA00591310
SCOTT GRAF
6501 Red Hook Plaza, Suite 201
St. Thomas, USVI 00802
July 30, 2010
TO:
ATTN:
RE:
Little St ames
Emad Hanna
Daphne Wallace
Irrigation repairs and additions for tree relocation & hydroseed project BE project).
TIME:
S 2000.00
A total for work performed and completed with 2 men @ 5400 per day for 7/20, 7/22, 7/27, 7/28 &
7/29
7/20
2 men
Peter dug around(2) large Coco palms and damaged 1.5" main pipeline and control
cable at VIP drivewaLbase. WE shut down water @ Sit valve box. Heavy rains
7/22
2 men
We located (2) 1.5" fittings and piping damaged by back hoe We covered 1" stub out by
bypass road. We ran 60' of 1.5" pipe and installed (2) hose bibes by octagon house
hydroseed area. We trenched across gravel and we pressure tested all piping. We shut
down system in PM.
7/27
2 men
Today we ran 60' f 1.5" pipe to repair damages from 8/19 when 93) large Cow palms
were removed by VIP entrance from beach. We set up to run all zones in PM. We
capped off all )5" and %" pipes dug up at root base and walls.
7/28
2 men
We drilled and anchored (2) controllers behind Gary's panel was relocated. We also
installed 2" check and reunion at new distribution pump for Aaron/Smiley and
reconnected suction and pressure for start up.
7/29
2 men
Today we ran bananas slope and helo turf after mowers cut grass for PM program.
We repaired 1" pipe Peter damaged by water fall rocks. We wired new 32 station
controller at relocation. We had to turn off water (20 times after construction damaged
service pipe at foundation.
TOTAL FOR THIS INVOICE - $2000.00
LITTLE SF JAMES
APPROVED FOR PAYMENT
fc-
,
Girk\6O±-c Roma
EFTA00591311
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00591309.pdf |
| File Size | 323.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,454 characters |
| Indexed | 2026-02-11T22:51:26.828464 |