EFTA00591435.pdf
Extracted Text (OCR)
LSJ, LLC
Total Expected Cost:
59,300.00
Deposit Required?Yes:Ell
or
%
No:DX
Payment Method:
House Acct, to be billed:
X
Check:
Wire Transfer:
Credit Card of Requester:
LSJ Company Card:
Quote Attached: Yes:CI
No:EIX
Competitive Quotes Obtained?
Yes: 0
No:DX
If No, Why Not:
Island supplier
Authorization:
Date of Request: 24 March 2009
Requested By: W. Rowles
Time Frame for Purchase/Repair:
Urgent:OX
Inventory: CI Other: K
Item/Items Requested: 100 ton of Colombian sand
Purpose/Description: Misc. Island concrete, Mechanical Building Concrete
Company Name: Heavy Materials
Website or Special Purchase Instructions:
k 0-1 I fr-= id/ kg
Purchase Price: 100 ton @ 570.00 per ton = 57,000.00 cAff
Tax:
Shipping Cost: (Attach Quote) 5 Trips @ 5190 = 5950.00
Ship Via:
Other: Trucking 5 Trips @ 5270 = 51,350.00
Sit
Kt -
Vibe/
EFTA00591435
LSJ, LLC
Date of Request: 24 March 2009
Requested By: W. Rowles
Time Frame for Purchase/Repair:
Urgent:OX
Inventory: O
Other: O
Item/Items Requested: 200 +/- ton of stone
Purpose/Description: Misc. Island Concrete. Mechanical Building Concrete
Company Name: Heavy Materials
Website or Special Purchase Instructions:
Purchase Price: 200 ton @ $33.00 per ton = $6,600.00 0-f-fu-t-val 4-44 u t-•
/4109
Tax:
Shipping Cost: (Attach Quote) 8 trips @ $190 = $1,520.00'1 Ship Via:
Other: Trucking 8 trips @ $270.00 = $2,160 00
41 U kr,
Total Expected Cost:
510,280.00
/NO 9
Deposit Required?Yes:CI s
or
%
No: OX
Payment Method:
House Acct, to be billed:
X
Check:
Wire Transfer:
Credit Card of Requester:
LSJ Company Card:
Quote Attached: Yes:O
No: I:IX
Competitive Quotes Obtained?
Yes: O
No:DX
If No, Why Not:
Island supplier
Authorization:
EFTA00591436
1 .SJ , 1.1-C
Date of Request: 24 March 2009
Requested By: W. Rowles
Time Frame for Purchase/Repair:
Urgent:CIX
Inventory: 0
Other: 0
Item/Items Requested: 100 ton of Manufactured sand
Purpose/Description: Misc. Island Concrete, Mechanical Building Concrete
Company Name: Heavy Materials
Website or Special Purchase Instructions:
Purchase Price: 100 ton @ $42.50 per ton = $4,250.00
nitf"-P-v-44 4 `6" -Eg 1////0 9
Tax:
Shipping Cost: (Attach Quote) 5 Trips @ 5190 = $950.001 Ship Via:
Other: Trucking 5 Trips @ $270 = $1,350.00-
-0-p-e4,49 dria ok
Total Expected Cost:
56,550.00
)09
Deposit Required?Yes:O $
or
%
No:CIX
Payment Method:
House Acct, to be billed:
X
Check:
Wire Transfer:
Credit Card of Requester:
LSJ Company Card:
Quote Attached:
Yes:CI
No:OX
Competitive Quotes Obtained?
Yes: 0
No:DX
If No. Why Not:
Island supplier
Authorization:
EFTA00591437
Emad Hanna
From:
Curtis Royston
Sent:
Wednesday, April 01, 2009 10:26 AM
To:
Daphne Wallace
Subject:
FW: FW: Aprovaltil LlatiGitittF111(11
Please order materials
From: Jeffrey Epstein [malltoleevacation@imail.com]
Sent: Wednesday, April 01, 2009 8:56 AM
To: Curtis Royston
Subject: Re: FW: Aproval of concrete materials
ok
On Wed, Apr I, 2OO9 at 9:55 AM, Cunis Royston
NEED THIS STUFF -
From: Curtis Royston
Sent: Monday, March 30.2009 1:29 PM
To: Jeffrey Epstein
Subject: Aproval of concrete materials
Jeffrey.
Please approve for Concrete Mix -- Total S17,850
Stone - S6.600
Manufactured sand - S4.250
Columbian sand — $7.000
This is for Island Projects & Mechanical Building
Thank you.
Emad Hanna; Monique Harry
wrote:
EFTA00591438
Document Preview
Extracted Information
People Mentioned
Email Addresses
Document Details
| Filename | EFTA00591435.pdf |
| File Size | 573.9 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,436 characters |
| Indexed | 2026-02-11T22:51:42.670520 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.