EFTA00595013.pdf
PDF Source (No Download)
Extracted Text (OCR)
Sawyers
ON0IT4 SyNietth
133 County Route 513
Frenchtown, NJ 08825
Phone 908.996.6903
BILL TO
Jeffrey Epstein
NES, LLC
9 East 71st Street
New York. NY 10021
QUANTITY
SHIP TO
DESCRIPTION
Invoice
DATE
V6^2001
P.O. NO.
TERMS
Proposal
RATE
Net 30
AMOUNT
This invoke is for the Final Billing for the 'CCTV System Upgrade" as proposed by
Sawyers on Nosember 25.2008. There were a number of changes that evolved as the
job progressed that are noted as truths" or "Additions- at the end of this invoice.
0.7
70% remaining balance for the CCTV System Upgrade.
42.730.00
29.911.00
Credits:
Ganz ZNIL17A • I7' LCD Dual Input Monitors
580.00
4.640.00
Cranz ERK•17 • Rack Mount Adaptor Kits
50.00
400.00
Additions:
ADNDILCD20RK /American Dynamics 20" LCD Rack Mount Monitors (Includes
additional monitor requested by Richard)
920.00
1360.00
Samsung custom 20' Monitors with DVI Inputs. Rack Mounted
1.260.00
2.520.00
4
Sets of Winstead Back Panels
/15.00
340.00
5
Sets of Winstead Front Lift Off Panels
75.00
375.00
3
Labor • For the Installation and Setting of the various dress panels and back panels of
the Winstead Consok.
65.00
195.00
Fixed High Res Foyer Camera Iv/Video Drive Lense
600.00
600.00
Items still to be Completed:
Custom llolovision Door Stations
Repair and Re-Installation of Tote-Vision Monitor in Master Suite
Most SubCellar Camera. Aim & Focus
New York Sales Tax
8.375%
3.036.86
Thank you for our business!
S
Total
539.297.86
p-A-0:11-#41 9
oeg * 1\411-
V:ipit
EFTA00595013
• • - ; FW: Demesne not water Kepair list Street IOW Wile, L-leVel,151 ecznu rIVI.113kaV‘LII it, ...
From: Emad Hanna <
To:
Subject: FW: Domestic Hot Water Repair list Street low zone. C4evel.1st 32nd Floars(secunty Upgrade.)
Date: Mon. 29 Dec 2008 12:40 pm
Emad Hanna
Project Controller
HBRK Associates, Inc
PO Box 400
New York, NY 10150
t
(212) 327-0106
Fax (212) 327-0434
ehanna©hbrkasseciates•Com
From: Jeffrey Epstein
Sent: Monday, December 29, 2008 11.97 AM
To: Richard Barnett; Darren Indyke (AOL); Emad Hanna
Subject: Re: Demostic Hot Water Repair 71st Street low zone, C-level,Ist &2nd Floors(security Upgrade.)
Kapproved
T
CL-N
a—CoLere(/1 a y )ei)i
On Mon, Dec 29, 2008 at 11:46 AM, Richard Barnett <
> wrote:
(
Hi Mr. Epstein the Cost of the security upgrade is 543.000.0Wthe installation will start thr
weeks from
proposal approval date,due to equipment & material delivery time .The actual equipment installation
will take one week to install after all the equipment is received. Thanks Richard.
Date: Sun, 28 Dec 2008 18:49:33 -0500
Subject: Re: Demostic Hot Water Repair 71st Street low zone, C-level,lst &2nd Floors
From: ieevacationaemail,com
To:
Please give me a schedule and cost for secuirty update
On 12/27/08 4:07 PM, "Richard Barnett"
wrote:
Hi I completed the steam hot water heater repair for the patterson kelly hot water heater at 71st
street on Saturday 12/27/08 with an engineers helper attached Is pictures of the repair, system is
back to normal Happy New Year. Richard Barnett.
Life on your PC is safer, easier, and more enjoyable with Windows Vista®. See how
Life on your PC is safer, easier, and more enjoyable with Windows Vista®. Sec how
http://webmail.aol.cotn/40627/aol/en-us/Mail/PrintMessage.aspx
12/29/2008
EFTA00595014
Emad Hanna
From:
Richard Barnett I
Sent:
Wednesday, February 11. 2009 4:30 PM
To:
Darren Indyke (AOL): Emad Hanna
Subject:
FW: Monitor Changes
Attachments:
CCTV Monitor Change 02.10.09.doc
Hi JE gave me a verbal ok to the 20" monitors Thanks Rich Barnett
From:
To:
CC:
Subject: Monitor Changes
Date: Tue, 10 Feb 2009 15:34:11 -0500
Please see attached.
Thanks.
Pat Callahan
Stay up to date on your PC, the Web, and your mobile phone with Windows Live. see Now
EFTA00595015
February 10, 2009
Mr. Richard Barnett
9 East 71" Street
NYC NY 10021
HAMM
Dear Richard:
Sawyers is pleased to present to you and Mr. Epstein the following quote for the Increase in the size of
the Monitors for the new rack. Originally we had proposed increasing the old monitors from 15- CRTs to lir
LCDs. Now that they are installed. both Richard and I feel a better look and operation of the room would be to
increase the size to the maximum supported in a rack. This would be 20". Richard would also like to have one
more monitor for the cameras. The cameras and DVR would use one type of monitor: the 2 PC would use a
different one.
Please feel free to call if you have any questions.
Sincerely.
Tom Callahan
President. Sawyers
9 East 7r Street — CCU Monitor Upgrade
(8)
Ganz ZML17A — 17" LCD Dual Input Monitors @ -580 credit
$ -4.640
(7)
Al) 20" Rack Mount Monitors @ 920
S 6.440
(2)
Samsung 20" DVI Rack Mount Monitors @ 1260
$ 2320
CCTV Monitor Change Total
S 4.320
EFTA00595016
U1/20/2069 15:58
9089966958
SAWYERS CONTROL SYS
PAGE
02
A -
Sawyers
Control Swans Int
Ma TO
Jeffrey Epstein
NES, LLC
9 East 71st Street
New York, NY 10021
133 Comity Road 51.9
Futitcbtonn. /41 09925
own. 904 996 6903
Invoice
tas
903 4,76 6959
is* )trocontrott cern
SHIP TO
Jeffrey Epstein
NES, LLC
9 East 71st Street
New York, NY 10021
Attn: Richard
DATE
ItivOICE #
1/72009
20090028
■
NO.
TERMS
Net 30
QUANTITY
DESCRIPTION
RATE
AMOUNT
This invoice IS fora Deposit for the "CCTV System Upgrade as proposed by Sawyers
on November 25, 2001.
We asking for a 30% deposit to begin ordering the equipment. %coronet the project to
take about three weeks from now until completion.
0.3
30% Deposit for Equipment ordering for the CCTV Ss stem Upgrade.
42,730.00
12,819.00
New York Sales Tea
8373%
1,073.59
Thank you for >our business!
Ng s
Wtcl
Total
sts:92 s9
Pm,
IA
EFTA00595017
•
November 25. 2008
Mr. Richard Barnett
9 East 71" Street
NiCi
RBI V NC
Dear Richard:
Sawyers is pleased to present to you and Mr. Epstein the following quote to for the provision.
fabrication and installation of a complete CCTV system upgrade for the residence at 9 East 71" Street. The
main focus of this proposal is the replacement and upgrade of the CCTV Monitor Command Center. We plan
to install a modular Winstead Rack that will be configured for (11) Monitor ports. Eight of these will be
utilized for the cameras, and the existing "Quad" processors will be re-used to feed these monitors. Two bays
will be used to house the computer monitors while the last bay will be used for housekeeping items for
shelving and organizing the Command Center.
The Winstead rack we are proposing will have work surface shelves, storage drawers and a clean
wrapped surface. This type of rack is more institutional looking and we would recommend that a carpenter
"wrap" the console with more appropriate finishes. Typically the top surface would be finished with a stone or
laminated counter while the sides would tend to be skinned with finishes to match the room'sdecor. The actual
footprint of the Winstead Console is also different than the existing structure, so we would recommend
replacing the carpeting as well as part of this process.
In addition to upgrading the Command Center's physical structure we will also be installing new LCD
flat screen monitors for viewing the cameras. Sawyers has included pricing in our proposal for upgrading
numerous IR illuminated bullet cameras located throughout the residence. We plan to change (4) Interior Bullet
Cameras, (4) Exterior Bullet Cameras and (2) Foyer Cameras. The existing PancTiltiZoom exterior camera has
been "fogging" from water seepage around the seals and we are recommending replacing that unit as well. All
of the new cameras will rout to a new Intellex Digital Video Recorder with a 500 gig storage drive that will
maintain a record of the images for about 3 weeks.
This project will disrupt the existing Command Center for approximately I week. Sawyers will have a
crew on-site to dismantle and remove the existing structure and then to re-build the new system. We plan to
complete the Command Center conversion, then switch to changing out the field cameras within the residence.
When we arc complete, you will have a completely upgraded camera system with new viewing monitors,
recorders, and field cameras.
Please feel free to call if you have any questions, or would like to proceed with the project.
Sincerely.
Tom Callahan
President. Sawyers
EFTA00595018
9 East 71" Street — CCTV Upgrade Proposal
Complete Winstead Console — 7 Bay Design, 4 High and 3 Low
Includes all framing, sides, shelves, caps as well as shipping costs.
* Matches approved CAD drawings from 10-15-08.
S 12,100
(8)
Ganz ZML17A — 17" LCD Dual Input Monitors @ 580
S 4,640
(8)
Ganz ERK-17 Rack Mount Adaptor Kit @ 50
$ 400
(4)
Speco HT-Int-B8 Interior IR Illuminated Bullet Cameras @ 400
S 1,600
(4)
Evcrfocus EZ550 Exterior IR Illuminated Bullet Cameras ® 565
$ 2,260
(2)
Foyer Bullet Cameras — (Replacing Pin Hole Cameras) @ 565
S 1,130
(Exact model selected to best match existing finishes)
(1)
Sensonnatic Intellex Digital Camera Recorder — ADD600DVD050
$ 6,825
(16 Cameras. 500 gig Hard Drive. Deluxe version, 4.2 software.)
(I)
Sensommtic — RAS917OPC Exterior Day/Night P/T/Z Color Camera Kit
S 2,375
(1)
Bullet Camera and PTZ Camera replacement Labor
$ 2.800
( I)
Winstead Command Ccntcr Demolition & Fabrication
S 8,700
Complete Turn-Key CCTV System Total
S 42,730
EFTA00595019
01/20/2009 15:58
9e89966958
SAWYERS CONTROL SYS
PAl£ 01
SAWYERS CONTROL
SYSTEMS, INC.
133 COUNTY ROAD 513
FRENCHTOWN, NJ 08825
FACSIMILE TRANSMITTAL SHEET
10
PROM:
Ernad
Pat Callahan
COMPANY:
OATX:
1/20/2009
MX NUMBER:
TOTAL NO. O i• PACES INCLUDING CV/EX
646-350-0221
2
PCONENCILMEM
MOWER'S VAX •-
908-9966958
KL
seaters PlIONB A:
Epstein Invoice
908-9964903
K URGENT
0 c• OR REVIEW
D PLEASE{ COMM RNT
D PLEASE. IMPLY
K PLEASC RECYCLE
I4OIXS/COMMLECIS
I an forwarding the Invoice for the "deposit" for the cal/ System Upgrade
133 CCU..
XO AD 513
vitv.NCHTOWN. 141 01125
EFTA00595020
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA00595013.pdf |
| File Size | 1061.6 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 10,113 characters |
| Indexed | 2026-02-11T22:53:08.683926 |