Page I of I
Records Listed For: EMAD from 02/29/2008 to 03/03/2008
From
RAHNA
4:32PM
Message
ok RE: Per the Zorro windows and door contract we need to pay
$60,000 1 month prior to ... Orignal Message: Per the Zorro windows
and door contract we need to pay $60,000 1 month prior to delivery. Is
ok to wire?
Phone Done
Mark Checked Messages as Read
Sig.—MONS •
•
•
•
Copyright (c) 2000-2004, Epstein Interests, Inc. All Rights Reserved
YoRAo
- 49(
http:lidomsrvOl/foxhaven/wc.dll?Gmax—MsgEl nk
3/3/2008
EFTA00595222
3 B's LLC
532 Jefferson St. NE
Albuquerque, NM 87108
Phone: 505-255-4432 Fax: 505-255-2533
December 20, 2007
Zorro Ranch
C/O
49 Zorro Ranch rd.
Stanley, NM
Re: Updated Pricing for Windows and Glass Doors at Main House
Dear Brice,
As per our earlier discussion, BiltBest is having an anniversary sale that ends December 31,
107. You can save $ 45,000.00 if the windows are purchased prior to the end of this year.
After Jan. l' 2008, that discount will no longer be available. You will also receive an
additional $11,000.00 discount if the windows are pre-paid in full. The windows can be painted
at the factory and the additional amount is reflected in the breakdown listed below. A wire
transfer is required for the payment on this transaction. All other billing is listed below.
The scope of work remains the same and is as follows
• Demolition of stucco around every window and door to be replaced. Demolition of
2"x6" detail around all the windows and doors is to be removed for the proper
reinstallation of the units as well as window wrap, which is a vapor barrier that is to be
installed on top of the window flanges and overlapping onto the building structure as a
preventative measure to block out moisture and air. Demolition of all pm-existing
windows and doors will be carefully removed and saved for possible reinstallation.
Removal of approximately 6" of drywall around the interior side of window/door.
• Installation of all windows and doors in a wave type fashion, meaning that the project
will be on a room-by-room/ hallway basis. **Each room should be cleared of all
pictures, valuables, and/or furniture near window and door areas. Installation will take
place from the interior and exterior of the opening. 3B's LLC will provide all means
EFTA00595223
necessary to install upstairs units, such as scaffolding and/or any mechanical equipment
needed to insure safety and accuracy.
• Re-install all wooden trim, old or new; drywall and/or tile. Tile areas could be subject to
a field change modification should a match be unavailable. The details of such a Change
Order, if necessary, will be agreed upon both Brice and 3B's LLC,
• Replacement of stucco will be coordinated with 3 B's LLC.
• Billing - Invoices will be submitted by the 25th of each month and are due within ten days
of receipt.
• Schedule — The windows will take approximately 8-12 weeks to be delivered following
receipt of payment. The job will take approximately (4) four months to complete and a
more detailed schedule will be submitted by the end of January 2008. We will make
every effort to complete the project in a timely manner but we are at the mercy of the
weather and will request extended time if delayed by weather. The request for additional
time will be submitted to Brice for approval.
indow and door warranties can expire if they are not installed and then left exposed to the
elements. Bid includes labor, material, equipment, and insurance necessary to complete the
above referenced project. This bid excludes all painting (except factory window frame
painting), caulking, and/or staining of any kind on windows, door, or trim.
If you decide to take advantage of this discount, the windows can be stored safely until
installation. If your hangar is not available we will make arrangements for storage. Of course
we will make sure as to not void the warranty and store the windows away from the elements.
Breakdown - per your request
Windows, Hardware, Interior Trim
Old Price $ 400,000.00
New Price $ 355,000.00 —1 0
Equipment: lifts, scaffolding, etc.
No Change
$ 18,000.00
Exterior Stucco Repair around windows and doors No change
$ 60,000.00
Remove damaged stoops (6) and install, pour No change
form, and finish new cement
$ 10,000.00
Mobilization and travel
No change
$ 10,000.00
EFTA00595224
L.,abor
No change
$220,000.00
Factory painted frames (white) add
$11,000.00
Cleanup
No change
S 5.700.00
(Old total $ 723,700.00 + tax 55,182.00 = 778,882.00)
$ 689,700.00
Pre-pay discount
-$11,000.00
Sub total
$678,700.00
Tax
$51,750.00
Total
There is an 8-12 week lead time
atsfrizbwrjits
iarto-me--
$730,450.00
- 333/ 97c
37),
Option 1— Upgrade Hardware
--ntek Sandcast Arched 11/2"x11" plate with Durango lever Dark Bronze for all Patio Doors
kJ2) doors
$ 3,970.00 plus tax
Option 2 — Pool Doors
Luxury Doors (5) Napili All Metal French Doors
$ 38,500.00 plus tax
Accepted by
Date
qhe
A minimum payment of $ 358, 970.00 will be required to order the doors and get the savings.
This will cover the glass doors, windows, factory paint and upgraded hardware.
If you decide to accept option 2, which can be done now or later since they are provided by a
different company.
A down payment of $ 60,000.00 will be requested 1 month to the windows being delivered to
the jobsite.
'11 other billing (as listed above) will be in the form of progress payments as the work is
.ompleted and approved by Brice.
EFTA00595225
Thx will be billed for at the end of the job
If you have any questions, please call me at 505-450-3654
Thank you,
JJ Blea
3 B's LLC
EFTA00595226
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Phone Numbers
Document Details
| Filename | EFTA00595222.pdf |
| File Size | 474.9 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 5,710 characters |
| Indexed | 2026-02-11T22:53:17.603711 |